The first unit of the South Ukrainian NPP restarted after repairs

The first unit of the South Ukrainian NPP 7.32 (MSK) is connected to the Friday after preventive maintenance, the press service of the station.

During the repair carried out on the power-load of the reactor core and removal of spent nuclear fuel. In the reactor, the first unit is operated solely fuel fuel production of "fuel elements", while the second and third in trial mode, the fuel multinational Whestinghouse (total of 126 assemblies).

Transient power disturbances connection conditions and limits of safe operation was not, the report says the company.

Currently, the plant are in operation two of the three units. The third unit continues preventative maintenance.

Like this post? Please share to your friends: