In the Urals, has opened a new center of power system control

December 6 in Yekaterinburg opened a new power grid dispatching center of the region.

As reported in a branch of OAO "UES" "regional power grid dispatching Sverdlovsk region" (Sverdlovsk RDU), a new facility was built as part of the Local Investment Project to build the infrastructure and technological upgrading. The main objective of the project — improving the reliability of the supervisory control grid of the region. 

Since its inception in 2002, the Sverdlovsk RDU huddled in small areas in rented premises, which imposed restrictions on the development of the technological infrastructure of the supervisory control and did not meet modern trends of technology policy.
A new dispatching center is equipped with modern operational management eletroenergeticheskimi modes.

"Heart" center — the instrument panel based on 24 video projection cubes — will output a lot of information on the state of the power system of the Sverdlovsk region, ensure the accuracy and efficiency of its display. Thus, the point in the Sverdlovsk RDU, control of operating modes of the regional energy system of the new dispatch center will strengthen the ability to monitor the current state of the object dispatching, accelerate the adoption of controllers operating decisions, be more effective planning and management regimes.

Chairman of the Sverdlovsk region Denis Pasler at the opening of the new facility, said:
— Previous dispatch is definitely outdated. For information about the power system we had before, but the current level of precision, clarity is completely different. The equipment — a few steps forward to the future maintenance of the entire power system — will give confidence, stability and accuracy.

Like this post? Please share to your friends: