Production Superjet in Komsomolsk-on-Amur

Marina Lystseva, she fotografersha, in his blog, is divided chic photographs of assembly plants Superjet and impressions of what he saw.

50 pictures under the cut.

Sixth visit in Komsomolsk-on-Amur aviation plant and KNAAZ happened, in less than five years after my last visit here, when the plant was still called KnAAPO. When just beginning production Superjet, I raided here every six months as tassovskogo photojournalist.

On inspection and survey of DSP (final assembly shop) we had only one day, which I was not enough. So I supplemented her story photo from the archives for completeness.

Today in the shop are nine aircraft. This photograph shows six and three more are hiding behind the wall.

  • ««
  • ««

2.For comparison — the same shop at the end of November 2006. On the wall hangs a poster "Here RRJ will gain life." For those who do not know — RRJ — Russian Regional Jet — is the first name of the Sukhoi SuperJet. About the rebranding was announced at the 2006 Farnborough Air Show.

  • KNAAPO_061130_199
  • KNAAPO_061130_199

3.Then we were shown the first part of the fuselage of the aircraft, which in a few months, had to go to TsAGI for static tests. Inside, one can see Mikhail Pogosyan, the then director of "Dry" which Kostya Goldentsvayg interviews for the "Aviator".

  • KNAAPO_061130_172
  • KNAAPO_061130_172

4.First assembled aircraft assigned a number 95002. The first flying machine, the second is placed on the ground tests. At GSS first flight 95001, 95002 and static. But first collected 95002 because firstly, to collect the flying machine and work on it all the systems are much longer than the glider to collect statics. Second, you never get a conclusion on the first flight without crimping machines for static, at least a minimum.

5.January 28, 2007 plane plunged into the "Ruslan" and sent to the TsAGI on the static and fatigue tests, which lasted several years.

  • IMG_9533
  • IMG_9533

6.For the third time in July 2007, a group of journalists showed the board number 95001 on the docking station to the DSP. It would give him wings, tail (fins), and by September, the aircraft will be ready to appear for the first time to the public.

  • SSJ-100 1-letnyi 7341
  • SSJ-100 1-letnyi 7341

7.The fourth arrival in Komsomolsk-on-Amur — rolled out Superdzheta September 26, 2007.

  • SSJ-100_vykatka_0535
  • SSJ-100_vykatka_0535

My pictures are so pleased suhovtsam that next year, I was invited to take the first flight of the Superjet.

Fifth visit was the longest stay at the Komsomolsk and KnAAPO — as much as 4 days!
8.On the first day the aircraft ran on taxiing, the second was to test the strength of the chassis, on the third — separation of the nose landing gear, and on the fourth day — May 19, 2008 under number 95001 Superjet first took to the air!

  • IMG_7005
  • IMG_7005

Then came a break in almost five years (during which time there were several shootings in Zhukovsky, TsAGI, at international air shows), and here I am again at the factory! Only now it's not called KnAAPO (Komsomolsk-on-Amur Aircraft Production Association) and KNAAZ — Komsomolsk-on-Amur Aircraft Plant named after Yuri Gagarin. A Superjet collected at the branch — Knafo CJSC Sukhoi Civil Aircraft.

9.If the last time in DSP were three aircraft with the numbers 95001, 95003 and 95004, it is now going to have room 95036! He will leave this year, the Mexican customer — the airline "Interdzhet", which ordered 20 of these machines.

  • ««
  • ««

10.In the workshop is the final assembly of all parts of the aircraft. Click on the picture.

  • ««
  • ««

11.The fuselage is collected here in Komsomolsk, cockpit and tail NAPO in Novosibirsk, fiberglass fairings for VASO in Voronezh, and SAM146 engines imported from Rybinsk enterprise with Power Jet — the joint brainchild of French Snecma and NPO "Saturn".

  • ««
  • ««

12.On the docking station number 1 is the board number 95029, designed "Aeroflot"

  • IMG_5047
  • IMG_5047

13.There is now produced by installation of all cables and avionics.

  • ««
  • ««

14.Installation of the cable in the cabin. Fine handmade entrusted to women.

  • ««
  • ««

15.After the installation before commissioning cable network fully prozvanivatsya.

  • ««
  • ««

16.Lights up red — all ok!

  • ««
  • ««

17.The length of all the wires in the plane is 10 miles away!

  • ««
  • ««

18.Serial number during handover will evolve. The plant has its roster. For example, SSJ-LR on KNAAZ has the number 95032, and in the flight test facility has to be 97006, because they have their own account, as for example in the Sky Aviation board room generally consists of a combination of letters. Number assigned local aviation authorities, such as that the traffic police car put on the account.

  • # # # Ssj
  • # # # Ssj

19.Setting the backlight lamp ladder

  • ««
  • ««

20.Mounting of slats

  • ««
  • ««

21.Seam sealing vertical tail

  • ««
  • ««

22.Assembling a complex air conditioning system

  • ««
  • ««

23.Joining the wing and fuselage

  • ««
  • ««

24.Installation Profile for mounting wing-body fairing

  • ««
  • ««

25.Owner charismatic tatuha sets wing-fuselage fairing.

  • ««
  • ««

26.Roman rack mount chassis, and in his spare time actively attends a gym.

  • ««
  • ««

27.Installation of the fuel pump

  • ««
  • ««

28.Two hearts for the aircraft waiting for their turn — they dock the engines to the wings at the very end …

  • ««
  • ««

29.After installing the engine is put under the current plane.

  • ««
  • ««

30.It also checks the operation of landing gear and hydraulic flushing.

  • ««
  • ««

31.Under the nose cone mounted weather radar.

  • ««
  • ««

32.Production Wizard consider the amount of work performed.

  • ««
  • ««

33.The guys run processes on the platform or docking station.

  • ««
  • ««

34.Board number 95027 will be transferred to the Indonesian airline SKY AVIATION.

  • ««
  • ««

35.At the end of 2012 to measure KNAAZ reached 15 days, that is, two aircraft per month. In 2013, the task of reducing the production cycle, and by the end of the year is planned to produce aircraft for 10 days.

  • ««
  • ««

36.This year, "Aeroflot" will pass in seven Superjet layout full. The first plane full version already flown to Ulyanovsk, where it is installed and interior painting done in the corporate colors of the airline. It is expected that he will be given the airline "Aeroflot" in April of this year.

  • ««
  • ««

37.At the same time to produce the aircraft in a configuration full "Aeroflot" will return JSC "Sukhoi Civil Aircraft" aircraft configuration light. Returned SSJ100 in the specification light can be modified in accordance with the requirements of customers who have expressed a desire to buy the aircraft after their return from the operation of the airline "Aeroflot".

  • ««
  • ««

38.In February, began flight tests of the first extended-range aircraft SSJ100-95LR (95032). LR — Maximum range SSJ100LR is 4578 kilometers. F
light range of the base version of the aircraft — 3048 km. There are some design features detachable part of the wing and center section, but apparently it does not manifest itself.
In the shop we see the first production car — on the order of "Gazpromavia" (95033).

  • ««
  • ««

39.The first machine is now in Zhukovsky on the tests, which will take three to four months, and then in the Aviation Register of Interstate Aviation Committee (IAC) will be filed documents for certification. This year we plan to produce three SSJ10095LR, and the first will be delivered to the customer in 2013.

  • ««
  • ««

40.95025 — this is the first full, interior installation and painting will be done on "Aviastar-SP" in Ulyanovsk. Remember competition AFL "color the SSJ"? Perhaps it is he will get a livery design competition winner.

  • ««
  • ««

41.95025 ready for the rolling out of the hangar. Let's go!

  • ««
  • ««

42.After a couple of hours board will make its third test flight.

  • ««
  • ««

43.From the shop aircraft towed to the parking lot, where they will hold pre-flight training.

  • ««
  • ««

44.View from the top shop

  • ««
  • ««

45.Morning shadow is so elegant, like an airplane.

  • ««
  • ««

46.Pre-flight preparation includes refueling, ground connection of the power supply control systems check …

  • ««
  • ««

47.Ready for takeoff!

  • ««
  • ««

48.95025 to be transferred to "Aeroflot" this spring.

  • ««
  • ««

49.With optimism in the future!

  • ««
  • ««

50.All livery Superjet today. Yellow — is not livery, and primer. All planes originally were.

  • color SSJ
  • color SSJ

Here's a beauty!

The next day we flew to the Superjet "Yakutia" from Khabarovsk to Yakutsk continue to meet people and aircraft that live in one of the most extreme places on the planet. To be continued!