Open to traffic on the new bridge over the Grand Cherepaniha

October 20 Olyekminsky Ulus opening ceremony of a new bridge over the River Great Cherepaniha on the road Olekminsk — Lone Wolf.

 Photo source:sakhapress.ru

Construction of the bridge over the Grand Cherepaniha began in 2010, simultaneously with the completion of another major construction — the bridge over the river Malaya Cherepaniha.

The festive event was attended by the Deputy Prime Minister of the Republic of Sakha (Yakutia), Anatoly Skrybykin, Member of Parliament of the Republic Matvey Evseev, head of the State Construction of Sakha (Yakutia) Faith Kuzakova, head Olekminsky ulus Fedoulov Simon, CEO of the Office of

Continue reading Open to traffic on the new bridge over the Grand Cherepaniha

On the Oka Shipyard the laying of the keel head tanker project RST27 for Volgotrans

October 20, 2011 at Oka Shipyard keel laying ceremony of the brain tanker project RST27, being built by order of the company "Volgotrans."

Vessels of this type are designed to carry crude oil and petroleum products, including gasoline, without restrictions for flash-point, with the provision of cargo transportation with maintaining a temperature of 60 ° C. Provides simultaneous transport of two kinds of cargo.  

Operation provides to the Russian inland waterways subject to restrictions; marine areas corresponding to restricted navigation area R2 — with a wave height of 3% probability 7.0 m, the distance

Continue reading On the Oka Shipyard the laying of the keel head tanker project RST27 for Volgotrans

On the fourth unit of the Kalinin nuclear power plant has begun physical start

October 20, 2011 at 21:45 in the fourth unit of the reactor fuel assemblies loaded first, reported in the Public Information Center of Kalinin NPP. After completion of the loading of the core reactor fuel assemblies fourth unit will be displayed for a minimum controlled power level.

 Photo source:rosatom.ru

According to the Head Start Unit number 4, the director of the Kalinin NPP LI Martynovchenko, after loading the first fuel assembly is still much work. "Therefore, a sense of celebration is punctuated with the realization that the amount of work that remains" — He said.

 Photo source:rosatom.ru

Continue reading On the fourth unit of the Kalinin nuclear power plant has begun physical start

On Saturn commissioned new facilities

At the head office of JSC "NPO" Saturn "(Rybinsk, Yaroslavl region.) Commissioned a comprehensive line of anodizing plant number 9.

The decision to purchase and placement in existing electroplating shop five integrated enterprise plating lines was made in order to ensure normal production and new production engine certification data specific processes according to international standards.

On the areas of the body 119 was put into operation a newly created section number 43, which is further expected to develop specialized production unit with a closed cycle of production, based on the use of electrochemical machining (ECM) to form a profile of

Continue reading On Saturn commissioned new facilities

On RUSNANOTECH 2011 will be held for the first time fashion show, created using nanotechnology

Team of the collection by Lyudmila Norsoyan "Trying Future", will be presented Oct. 26 at RUSNANOTECH, 2011, is built on high-tech jersey as the object of contemporary art universal. The basic model — tunic: plastic, weightless, comfortable.

 Photo source:intermoda.ru

Key principles — unisex, unisize, unseasonal (unisex, universal size and off-season). For the first time will be presented to dress created from gippoalergennoy yarn based on lactose with ornaments inspired by traditional Russian women’s shirts, deposited by UV printer of SAN. In addition, the collection includes dresses made of metallic yarn and other technological innovations developed in the best

Continue reading On RUSNANOTECH 2011 will be held for the first time fashion show, created using nanotechnology

Officially launched the construction of the railway Kyzyl-Kuragino

Today, October 21, 2011, the transfer of the project for the construction of railway Kyzyl-Kuragino in the active stage, it was reported at a workshop at the chairman of the government of the Republic of Tyva S. Kara-ool.

"The total cost of the construction of the railway Kyzyl-Kuragino is about 136 billion rubles. Of these, 87 billion rubles. will be invested directly Yenisei Industrial Company. The remaining 49 billion rubles. will the state through the fund. YPC also plans to invest about 30 billion rubles. the development Elegest "- said R. Baysarov financial conditions of the project.

Continue reading Officially launched the construction of the railway Kyzyl-Kuragino

NT-MDT will present at RUSNANOTECH-2011 new universal probe microscope Solver Open

 Photo source:rusnanonet.ru

New universal probe microscope Solver Open, created one of the world’s leading developers of equipment for scanning probe microscopy — NT-MDT from Zelenograd, will for the first time on show at the international forum RUSNANOTECH-2011.

The new microscope combines the best features of our microscopes two technical platforms — "Solver" and "Integra", — said the Director General of NT-MDT Co. Victor Bykov on the sidelines of an international conference on nanotechnology in electronics Nano and Giga Challenges 2011.

In his words, "a new device has an automated setup, it significantly reduces the requirements for the

Continue reading NT-MDT will present at RUSNANOTECH-2011 new universal probe microscope Solver Open

New services for fans

Dear friends! We are pleased to announce that today the football club "Lokomotiv" launches new services for you — club online store (http://shop.fclm.ru/) and updated website to book online (http://tickets.fclm.ru/ ru / index.php) tickets for home games, "Loco". [Cut] «The" Locomotive "is faithful fans in all regions of Russia. That is why one of the priorities in our work is the convergence of the team and its fans, regardless of where they live, — commented the first vice-president of the club Alex Kirichek. We hope that the opening of an online store "Loco" will contribute to this important task. As

Continue reading New services for fans

New kindergarten built in Kstovo (Nizhny Novgorod region)

All in the nursery will be a little less KSTOVO: soon there will a children’s garden, built on the original project. Kindergarten № 50 "dolphin" in Kstovo should be put into operation before 1 November.

 Photo source:vremyan.ru

18.10.2011 visited him deputy governor of the Nizhny Novgorod region Gennady Suvorov. — Plan, there are provided a swimming pool, a games room, a winter garden — all of this is designed for new modern standards. The new kindergarten will have three groups of 25 people each, one for children up to three years, two — three to four years —

Continue reading New kindergarten built in Kstovo (Nizhny Novgorod region)

New high-speed ship laid at the Khabarovsk Shipyard

On Khabarovsk Shipyard built a new high-speed boat to the water-jet engines A45-2 project, designed to carry a hundred passengers. Its construction will begin upgrading the fleet of long-distance passenger lines. In the future, A45-2 will replace outdated "Meteora."

More than half a century, the stocks of Khabarovsk Shipyard did not go down to the water, passenger ships, the fleet replenishment was carried from the western Russian shipyards. In 2012, in Khabarovsk will be built two passenger hovercraft for 30 and 50 seats. For regions where river transport is often the only, these orders are of particular

Continue reading New high-speed ship laid at the Khabarovsk Shipyard

SQL - 6 | 5,516 сек. | 8.36 МБ