Energomash (Volgodonsk) — Atommash manufactured and shipped two reactors for hydrotreating Saratov Refinery


 Photo source:energomash.ru

October 25. Manufacturing shipments carried two hydrotreating reactors R-2H (3H), produced for the Saratov Refinery. Customer equipment made by TNK-BP.
Reactors weighing over 170 tons each were delivered to the dock for a specialized factory in Saratov further transport to the refinery.


 Photo source:energomash.ru

Both devices are manufactured in production due to the agreement. According to the Director of Sales of oil and gas equipment Sergei Putilin reactors have passed hydraulic tests conducted in the presence of an inspector RTN, and representatives of the customer, who took part in the final acceptance of the vehicles, noted the high quality of the manufactured equipment.

Currently, the production of heat exchange of the body and ends with the production capacity equipment reforming reactor unit, also for modernization of the Saratov refinery capacity.

Like this post? Please share to your friends: