In Chelyabinsk, opened a new steel plant

August 6, the official opening ceremony of the new plant for the production of steel "Metallinvest" in Chelyabinsk.

The new plant in Chelyabinsk MIZMK — the fourth manufacturing plant Metallinvest. Production facilities "MIZMK-Chelyabinsk" is 24 thousand tons of finished steel per year.

MCW has three main production sites and warehouses: Plot I Blanking — made of metal preparation — shot blasting, cutting and drilling. Phase II fees and welding — produced major works for the manufacture of the finished structure. Phase III Paint — made anti-corrosion coating and surface finishes on finished construction.

At the grand opening was attended by the Director of the Criminal Code, headed by the Director General of EY Ustyuzhaninova.

The plant has already started work, made the first tons of steel structures for JSC "gold mining company" Pole ", the object — mining and processing plant at the Natalka gold-ore deposit. Total metal produced for this object — 1800 m

"MIZMK-Chelyabinsk" is a manufacturing company offering full-cycle services from design to installation of finished designs. On the "MIZMK-Chelyabinsk" design made of metal section KMD. Design is a three-dimensional modeling software Tekla Structures.

Tekla Structures — a powerful, modern complex to design in construction, allows multiple reduce design time while improving quality. The plant equipment Dutch company Voortman, a leading company in the market of equipment for steel plants. This equipment has high performance and enables to produce the most complex designs of the highest quality in the shortest possible time.

Like this post? Please share to your friends: