In the village. Lenin Hills (Moscow reg.) After the cap. Repair opened kindergarten

In the four months from January 15 to May 15, 2012 has been updated building of the middle group of kindergarten number 26 number 52096 military unit of the Ministry of Defence of the Russian Federation (the military camp of Peter).

During the overhaul replaced roof, floors, ceilings, internal walls, all communications, insulated floors, reinforced foundation porch, replaced kitchen equipment, installed fire alarm system. Significant changes have occurred in the territory: flower beds, a children’s swing set is installed, being installed new fencing of the area, ordered furniture.

Like this post? Please share to your friends: