Overview kindergartens, were not included in the news over the past week

In Yekaterinburg, after the cap. Repair opened two kindergartens for 230 seats.

Pre-school number 453 was opened in 1967 as a nursery-garden. Preprimary school was closed in December 1991 due to the absence of children and problems with heating, as well as for several other reasons.

In February 2013 began overhaul of the building. During this time, construction workers carried out a large amount of work: repaired the roof and facades, replacement of windows and doors, heating systems and water playground. Kindergarten equipped with the latest technology — now it has everything needed for a comfortable stay of 150 children and their quality training for school.

Kindergarten number 181 was opened in 1995 and belonged to the plant "Uraltransmash." In 2003, the pre-school was closed, and by 2013 the building was not maintained, and its territory to be used as parking. Contractors started repairing in March 2013. In a short time they have completed all civil works, replaced the floors, water and sewer. And now four new comfortable group equipped with modern furniture and equipment necessary teaching aids and educational toys colorful. Also updated the nutrition unit builders, tidied the music and sports halls. Very soon in the renovated walls of the kindergarten laughter sounds 80 preschoolers.

Photo

In Cherkessia after the cap. Repair opened a kindergarten for 125 places

Under the kindergarten "Sunshine" reconstructed building of one of the buildings of secondary school number 11, which is more than 20 years, was in poor condition. The work carried out in the shortest possible time. During the six months dilapidated building has changed beyond recognition, and now here is located one of the most spacious and comfortable kindergartens of the city. In preschool all the conditions for education, spiritual and creative growth of children, physical education and health promotion.

Link

In the village. Falcon Vladimir region after the conversion and renovation opened a kindergarten for 40 seats

Small-scale reconstruction of the building housing Sokolskaya school lasted a year. Managed to build a garden area by participating in the regional program for the development of pre-school educational institutions for co-financing in equal shares. The total cost of the reconstruction was 20.5 million rubles. In addition, more than 3 million rubles were costs for the equipment area of the kindergarten. Now it is equipped with everything necessary. The cozy games room, bedroom, dressing room, medical room, catering department, the offices of the teachers — in an institution for children provides a comfortable environment. Babies are beautiful furniture, colorful toys, educational games, new sports equipment.

Photo

In Volgograd-based school opened a kindergarten for 50 seats

Two additional groups of general developmental orientation with 50 seats for children from 3 to 4 years, started work today in Nov. elementary school — kindergarten compensating number 2 Voroshilov district of Volgograd.

The repair and purchase of equipment for the opening of additional groups of regional and municipal budgets aimed 4.12 million rubles.

Link

In the village. Kuzmolovsky Leningrad Region has opened a kindergarten for 50 seats

Association "Building Trust" put into operation a new kindergarten in low-rise suburban village "Sky" within the boundaries of the village Kuzmolovsky (Vsevolozhsk district).

Kindergarten "Marmelad" — a unique child development center for 50 students, designed for preschoolers from 1.5 to 7 years.

Photo

The school number 10 Kostroma opened Kindergarten group at 25 places

In areas not previously been equipped with a bedroom, a game room, a toilet and a small auditorium.

Redecorating rooms, new furniture, sanitary ware and toys have cost 1.3 million rubles.

Link

In the Kuznetsk, Penza region in kindergarten opened an additional group of 23 places

The new group was opened by the budget of the city of Kuznetsk in the municipal program "On the improvement of the demographic situation in the town of Kuznetsk" for 2013-2015. "And donations of parents. Expenses amounted to more than 500 thousand rubles.

Link

In suburban Dolgoprudnom opened a private kindergarten for 85 seats

In Dolgoprudnom opened another private kindergarten "My joy" on Granite Street.

Sadiq is designed for kids 85 and is a member of the program of public-private partnerships. This means that part of the cost of the business preschoolers compensated by the state, thus reducing the cost to the parents of the child to remain in the kindergarten, doing it at the level adopted in municipal kindergartens.

Link

In the village. Stulova Tver region after the cap. Repair opened a kindergarten for 46 seats

In 2013, for co-financing the costs of the repairs preschool educational organization of regional and municipal budgets was allocated to 1080.0 thousand rubles. These tools are completely replaced windows, roof, doors, facade was restored. In order to create conditions that meet the requirements of the new standards of pre-school education from the regional budget for the purchase of new furniture and equipment allocated 197 thousand rubles.

Photo

In the Ussuri region of Primorsky in the school opened a kindergarten for 260 places

Link

The village Blokhin Penza region on the basis of the school opened a kindergarten for 25 seats

    Link

    The village Blokhin Penza region on the basis of the school opened a kindergarten for 25 seats

    In 2013, the village school was repaired. Part of the building adapted for kids.

    Repair facilities were funded in the amount of 500 thousand rubles. An additional group will visit 25 children aged 1.5 to 6 years.

    Link

    In p. Akim Ilyinka Tula region on the basis of the school opened a kindergarten for 15 seats

    At the local school number 5 Uneven group opened up to fifteen people. At its equipment was spent 160 thousand rubles.

    Link

    In p. Hilarious Stavropol Territory has opened an additional group of kindergarten for 30 seats

    The building, which will now be placed team belongs Veselovskaya school, but have not been used. Having mastered more than 6 million rubles from the regional and local budgets, the building and the surrounding area was reconstructed.

    Link

    In Abakan opened a private kindergarten for 40 people

    Comfortable single storey extension to the multi-storey house located in the area of new buildings on ul.Askizskaya, 158A. At the disposal of the guys space of about 200 square meters — is a cozy hall, and locker rooms with individual cubicles and toilets, and the two groups are equipped with necessary furniture, bright toys and interesting books. "Family" is designed for 40 people, now 15, attended preschool preschoolers — all between the ages of one and a half to two years.

    Link

    In suburban Kotel’niki opened an additional group of kindergarten for 26 seats

    The premises of the new group is fully renovated and equipped with everything necessary. To engage in the new group will be 26 children 5-6 years old, most of whom still did not go to kindergarten.

    Photo

    In Naberezhnye Chelny (Tatarstan) opened a private kindergarten

    Education in kindergarten will be conducted in English. Already formed one group. It is expected that children will talk and communicate in a foreign language up to 90 percent of the time. Kindergarten is located in an office building on the first floor of the house.

    Link

Like this post? Please share to your friends: