The ship communications project 18280 Yuri Ivanov left the boathouse North Wharf

On "Severnaya Verf" rolled out of the hangar took place on the ship communications project 18280 "Yuri Ivanov." According to the press service of the company.

In the summer of 2013 the experts of "Northern Shipyard" will complete the installation of masts and superstructure, then "Yuri Ivanov" will be ready for launch, scheduled for September 2013.

Then, within six months the ship will be completed by afloat and in 2014 will be delivered to the customer.

Communication Project 18280 ship "Yuri Ivanov" — the lead ship of the project.

In 2013, on the "Northern Shipyard" will mark the first production vehicle of this project, which the order of the Commander of the Russian Navy named "Ivan Khurs."

The main characteristics of the vessel connection (large scout ship) project 18280:

displacement — 2,500 tons;

cruising range — 8000 miles;

full speed — 20 knots.;

length — 95 m;

width — 16 m;

draft — 4 m;

crew — 120 people.

 

Armament:

Artillery — 2 units MTPU with 14.5-mm machine guns CPV (according to other sources — 4 units);

anti-aircraft missile — MANPADS.

Equipment — a set of equipment for navigation, communications and signals intelligence:

navigation radar MR-231-3;

Integrated Bridge System "Bridge-18280";

The hardware-software complex of technical fire-alarm and automatic gas fire "Gamma-01F-18280" development and production of NGOs "Fire automation service";

basic system for the electronic compatibility (EMC) radar detectability and navigation stations, control systems and anti-aircraft artillery missile systems, systems of mutual exchange of information "Subtitle-23";

shipboard broadcast system "Screen-CM."

The project is designed CDB "Iceberg".

SQL - 16 | 0,555 сек. | 6.94 МБ