The station Zubov Glade in Mordovia after the cap. Repair opened

railway station

August 6 Zubova Polyana concluded after reconstruction opened railway station. The total cost spent in the building and surrounding area of work amounted to 12.5 million rubles.

In the course of renovated facade of the building, replaced the heating system, roof. The walls are covered with modern materials, and the floor is paved with marble tiles. Equipped with a waiting room and ticket hall, meeting all the requirements of passengers.

After the repair station became more comfortable for people with disabilities: window box offices are located on different levels, mounted individual reference system for people with limited mobility. In the waiting room there were special places for the disabled.

Like this post? Please share to your friends: