Calendar

Апрель 2018
MTWTFSS
« Dec  
 1
2345678
9101112131415
16171819202122
23242526272829
30 

Electrozavod shipped for the unit of Novovoronezh NPP-2 equipment

Holding company "ELEKTROZAVOD" shipped to unit number 1 Novovoronezh NPP-2 (Voronezh region) block single-phase transformer ORDTS-533000/500 capacity of 533 MVA, 500 kV.

The unit was designed and manufactured at the production complex of "ELEKTROZAVOD" in Moscow and refers to the power equipment of the new generation of heavy-duty transformers for high voltage class, news agency INFOLine.   Novovoronezh NPP-2 is being built on the new NPP-2006 project. At the moment, is being built 2 units with a total capacity of 2400 MW in the future it is planned to build two more power.

Continue reading Electrozavod shipped for the unit of Novovoronezh NPP-2 equipment

Electrograd a supplier of equipment for the construction of a multifunctional complex Respublika

Multi-purpose complex Respublika — the whole country united new format trade, entertainment and lifestyle. For the first time in Ukraine's largest shopping center will be integrated into the housing array c 1,2 million sq.m. high-quality housing. Residents of the neighborhood do not have to waste time looking for comfortable places to relax or meet friends, and they will be able to reduce the time and the usual shopping trips because everything here — next. In the district will have their own nurseries, schools, fitness centers, health center, bus station, hotel and multi-storey car parks. After the construction of a

Continue reading Electrograd a supplier of equipment for the construction of a multifunctional complex Respublika

Electric and gas CHP won the championship-collar occupations

Fanis Fatkhullin — welder Naberezhnye Chelny CHP won the first national competition of excellence "National Championship WorldSkills Russia — 2013".

WorldSkills International (WSI) — an international movement whose goal is to promote the work of professions, raising the status and standards of professional training and qualifications across the globe.

WSI is the main activity of the organization in different countries, professional skills contests WorldSkills, where young professionals have the opportunity to express themselves and showcase their skills. May 17, 2012 at the General Assembly WSI, held in South Korea, Russia officially became the 60

Continue reading Electric and gas CHP won the championship-collar occupations

Electric Ekaterinburg go to series

As the official site of the plant, company "Ural Locomotives" (Upper Pyshma, Sverdlovsk region) confirmed the right of serial production of the main cargo electric "SINARA" (2ES6 Series) with commutator motor drive.

Interdepartmental Committee (IDC), which included representatives of Railways, "Ural Locomotives' and suppliers of standard equipment, recognized the successful qualification and certification testing of electric 2ES6 the pilot in the suburban ring VNIIZhT Sherbinka. According to the testimony of tests of design and technological documentation for the electric "SINARA" 2ES6 series with the collector traction drive letter is assigned to the "A", confirming the readiness of the

Continue reading Electric Ekaterinburg go to series

Electric locomotive EP20-004 with train number 46 from Moscow to Voronezh

Electric locomotive EP20-004 with train number 46 from Moscow to Voronezh at the station. Lubertsy.

FIRST FLIGHT. SERIAL!

Thank youED4MKDeputy Chief Operating depot

Electric locomotive EP20-002 sent to the test site in Sherbinka

The second locomotive Novocherkassk Electric Locomotive Plant (NEVZ) — EP20-002 sent to the 5000-kilometer run on the test site VNIIZhT Scherbinka (Moscow region).

Two-system passenger electric locomotive EP20-002, the assembly of which was completed on NEVZ (part of ZAO "Transmashholding") in March of this year, sent to the test site VNIIZhT Scherbinka. Here it will be operational in the amount of mileage 5000 km, which is the most important part of the testing of new locomotives.

According to the current schedule, in September 2012 EP20 must obtain a certificate of conformity, and in the 4th quarter — to begin

Continue reading Electric locomotive EP20-002 sent to the test site in Sherbinka

Electric locomotive EP20-002 sent in for testing Belorechensk

Two-system passenger electric locomotive EP20-002, created at the Novocherkassk Electric Locomotive Plant in collaboration with the French company Alstom Transport, sent to the test site Belorechenskaya Maikop-North-Caucasian railway.

Locomotives have to go through trial runs at speeds of 140 to 160 km / h At the same time they will be comprehensive and dynamic tests on the effects on the way. After this locomotive will be tested chassis at speeds of 200 to 220 km / h on October railway track section on the Moscow — St. Petersburg, allowing the locomotive to develop such speed.

It is planned that at

Continue reading Electric locomotive EP20-002 sent in for testing Belorechensk

Electric locomotive Granite has successfully train weighing 9 tons of Trans-Siberian

Electric locomotive "Granite" series 2ES10 successfully led the heavier trains on the Trans-Siberian Railway, said the group "Ekaterinburg".

 Photo source:sinara-group.com

On December 13-14, the first trip to the composition of a three-section electric locomotive 9 thousand tons in order to assess the operating conditions and the definition of Trans-Siberian railway infrastructure readiness for driving heavy trains.

"Granite" has successfully overcome Kamensk-route — Sedelnikovo — Balezino and in accordance with the schedule of the Kuzbass coal delivered to the destination. Overcome 700 kilometers different complex profile with lots of curves, which create additional resistance to the movement of

Continue reading Electric locomotive Granite has successfully train weighing 9 tons of Trans-Siberian

Electric locomotive Granite made a record pass through the Ural Mountains

The prototype freight electric traction drive "Granite" today, August 4, made the trip with a record weight of 9,000 tons over the Urals. He went from Yekaterinburg to Balezino station.

 Photo source:amisharin.ru

Participation in the record-breaking trip took RZD President Vladimir Yakunin, Sverdlovsk Governor Alexander Misharin, the head of the group "Ekaterinburg" Dmitry Pumpyanskiy, chairman of Siemens AG, Peter Loescher, and the head of the Sverdlovsk Railway Alexei Mironov.

 Photo source:amisharin.ru

Meeting with the press trip participants held at a train station Pervouralsk. Here they solemnly presented certificates of participation to record the trip. At the

Continue reading Electric locomotive Granite made a record pass through the Ural Mountains

Electrobus NEFAZ successfully operated in Novosibirsk

The first prototype electric bus NEFAZ, developed with the participation of the company "Liotech" was purchased by the Novosibirsk Chemical Concentrates Plant (JSC "NPCC") for their own use and for more than a month passes trial operation.

It is assumed that in the future Electrobus will be transferred to one of the city routes Novosibirsk. For several months, there has successfully operated trolley with long-term self-contained course on lithium-ion batteries "Liotech." Aside from the obvious environmental Electrobus feature reduced noise and vibration, which provides additional comfort for the driver and passengers, as well as low maintenance. In elektrobusa no internal

Continue reading Electrobus NEFAZ successfully operated in Novosibirsk

SQL - 6 | 1,506 сек. | 8.5 МБ