In Novgorod after the cap. Repair opened a maternity hospital number 1

In the Monday, February 11, after repair in Veliky Novgorod opened a maternity hospital number 1 on the street. Tikhvin. Here, for the first time, the light already has its first baby. Another mother about to give birth.

The institution is the reconstruction of the delivery room. Now the hospital has 6 individual delivery rooms. In addition, the updated Chamber, children’s ward, intensive care room, examination room, a new operating. Will work and new equipment acquired in late 2012. In each ward, which now will be on the two mummies, there was hot and cold water.

Continue reading In Novgorod after the cap. Repair opened a maternity hospital number 1

Meat production in Ukraine in January 2013 increased by 5.4% — to 293.2 thousand tons

Meat production in Ukraine (in live weight) increased by 5.4% compared with January 2012 — up to 293.2 thousand tons, the State Statistics Service of Ukraine (State Statistics Committee).

Milk production in the reporting period increased by 1.9% — to 602.4 thousand tons

Egg production in January 2013 compared to the same period in 2012 increased by 4.8% — to 1.41 billion units.

Recall Meat production in Ukraine in 2012 compared to 2011 increased by 3.4% — up to 3.136 million tonnes of milk production in the reporting period increased by 2.7%

Continue reading Meat production in Ukraine in January 2013 increased by 5.4% — to 293.2 thousand tons

Nevsky Shipyard repaired 47 vessels in 2012

During the navigation season 2012 (April — October) Ltd. "Nevsky Shipyard" has repaired 47 vessels.

Average repair ships were "Dmitry Pozharsky" "Vyatka", "Uzola-3", "MB-1217", "Irkutsk HPP" OT-2444 ": modernization — ship" MB-1217 "; renovations — barge-2033; repair machinery and equipment of the ship — the ship "Lezhevo", "sandal", "SNM", "Volga 4007", "Monaco", "Bratsk hydroelectric power station", "Aldan" barge-2034, "Kanin."

Refurbished hatch cover on the boat, "Monaco", established the foundations of a barge and barge-2033-2034, replaced by an anchor on the ship "Karl Marx", "Volga-Don-113", stripped and held defect inspection of ballast tanks, "Volga-Baltic-231 . "

Continue reading Nevsky Shipyard repaired 47 vessels in 2012

Plant Crane sums up 2012

Factory "crane" released in the 12 months 2012 1772 units truck crane equipment under the brand name "Ivanovec" is on 284 vehicles more than in 2011, the press service of the TC "Ivanovo brand." The highest rate in 2012 increased the production of cranes "Ivanovec" series "AK" carrying capacity of 25 tons If 2011 was issued 323 crane in this series, in 2012, more than 600. These models have a 4-piece boom length 30.7 m A significant event in 2012 for "crane" was the launch in March in mass production boom truck crane with ovoid. In August, the

Continue reading Plant Crane sums up 2012

Airport in January, served nearly 2 million passengers

Sheremetyevo International Airport has announced its activities in January 2013. The number of passengers handled from the beginning of the year increased by 9% compared to the same period of 2012 and reached 1 million 900 thousand passengers.

Passenger traffic on international routes (IAL) in January 2013 increased by 6.4% and amounted to 1 million 235 thousand people on domestic flights (DAL) — by 13.3% to 665 thousand passengers.

The most popular overseas destinations in January 2013 became Paris, Sharm El Sheikh, Prague, New York, Hurghada, Bangkok, Beijing, Rome, Istanbul, and federal — St. Petersburg, Vladivostok, Krasnodar,

Continue reading Airport in January, served nearly 2 million passengers

A new block of Krasnoyarsk CHP-3 shot deficit in the heat

Soviet district of Krasnoyarsk

At the end of 2012 installed thermal load consumers CHP-3 increased by 6% to $ 563.9 Gcal, and heat output increased by 16.8% — up to 1.803 million Gcal.

Thanks to the commissioning of the first unit of the Krasnoyarsk CHP-3 in March 2012, only for 2012 to a heat supply from the Krasnoyarsk CHP-3 were connected to 32 residential blocks of flats, 3 new kindergartens, 1 hospital and 9 commercial real estate. The total heat load of new customers Krasnoyarsk CHP-3 was 38.1 Gcal / h

The new unit will remove

Continue reading A new block of Krasnoyarsk CHP-3 shot deficit in the heat

Results of the GSKB Concern PVO Almaz-Antey in 2012

In the first issue for 2013 of the corporate newspaper "Boom" published of "Head System Design Bureau Concern PVO" Almaz — Antey "Academician AA Raspletina" (GSKB), published an article on the results of GSKB in 2012. It reports that "obtaining the status of head developer of air defense, missile defense, GSKB" Almaz-Antey "has assumed ultimate responsibility for the implementation of the tasks in this direction. Undoubtedly, one of the main ones is to perform in accordance with contracts signed with the Ministry of Defense of the Russian Federation, and at their own expense research and development (R &

Continue reading Results of the GSKB Concern PVO Almaz-Antey in 2012

Catches of commercial fish grown in the Novosibirsk region in 2012

increased almost 2-fold

According to the Department of Natural Resources and Environmental Protection of the Novosibirsk region, the volume of marketable production of farmed fish in 2012 in the region increased by almost a factor of 2, reported the provincial government.

Fisheries for sale in contrast to the usual fishing involves growing and farming in small ponds and lakes where fish inspires specifically with a view to its subsequent sale. As the head of the Department of Natural Resources and Environment Yuri Marchenko, in 2012 the catch of marketable fish grown in the

Continue reading Catches of commercial fish grown in the Novosibirsk region in 2012

Pulkovo in January passenger traffic increased by 8.8%

Airport "Pulkovo" in January 2013 increased passenger traffic compared with January 2012 by 8.8% — up to 720 thousand 923 people, said the LLC "Northern Capital Gateway".

Passenger traffic on international routes was 392 thousand 317 people, which is 15.5% more than the number of passengers carried in the same period of 2012 passenger traffic on domestic routes was 328 thousand 606 people (+1.8%). The number of runway operations in January decreased by 0.3% compared to January 2012 and totaled 8 786 thousand units. The volume of handled a maximum take-off weight was 302

Continue reading Pulkovo in January passenger traffic increased by 8.8%

Throughput of the Civil Code of the Azov-Don Shipping Company (ADP) in 2012

increased by 6%

Throughput of stevedoring companies GC "Azov-Don Shipping Company" (ADP) in 2012 increased by 6% compared to the same period in 2011 and amounted to 4.5 million tonn.Obem cargo handling facilities at Rostov Universal Port (RUP) was 1.5 million tons.

Ust-Donetsk port handled during the reporting period, 1.1 million tons, LLC "Universal Stevedoring Company" for the period provided in the roads transshipment port Kavkaz 650 thousand tons of cargo (coal). In addition, in 2012, 1.2 million tons of cargo were overwhelmed by other stevedoring companies GC "ADP" on the terminals in the Rostov region and

Continue reading Throughput of the Civil Code of the Azov-Don Shipping Company (ADP) in 2012

SQL - 16 | 1,871 сек. | 7.31 МБ