Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

Vietnam buys 12 more Su-30MK2

 

As reported by August 20, 2013 Agency "Interfax-AVN" Russia will supply Vietnam has 12 multi-role fighters Su-30MK2. This was reported by "Interfax-AVN" on Tuesday, the military-diplomatic source. 

"The contract to supply Vietnam 12 Su-30MK2 was signed last week. It not only provides for the delivery of aircraft, but also the technical equipment," — said the source. He recalled that this is the third contract for the Sukhoi fighters. Two previous to the delivery of eight and twelve aircraft successfully completed [in fact, Vietnam since 2004 has delivered 24 Su-30MK2 — bmpd].

Continue reading Vietnam buys 12 more Su-30MK2

In the Southern Military District continues to receive new and upgraded aircraft equipment

In the Southern Military District (SOUTH) continues to receive new aircraft technology. From the airport the factory in Ulan-Ude Aviation SOUTH military air base unit located in the Stavropol region, depart 4 modernized Mi-8AMTSh. Until the end of the year plans to enroll another 6 helicopters of this modification.

Since the beginning of the intensive rearmament of the army aviation SOUTH received attack helicopters Ka-52 "Alligator", Mi-28N "Night Hunter", Mi-35, Mi-specific 8MTPR-1, Mi-8AMTSh, Mi-8MTV5, Mi-8MTPR military-transport helicopter Mi-26.

Tactical aircraft into service before the end of this year received more than 30 new and

Continue reading In the Southern Military District continues to receive new and upgraded aircraft equipment

Diamond presented with Ukrainian aircraft engine

Diamond Aircraft DA50 presented a layout with the engine AI-450S production Motor Sich and Ivchenko-Progress output of 450 hp This engine will improve the characteristics of a five-seater aircraft, which was announced in 2006 with a diesel engine with 275 hp called DA50 SuperStar.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s); } })(window, document);

Formation of the program MAKS-2013 completed

Moscow. August 20. Interfax-AVN — The Ministry of Industry and Trade of the Russian Federation — the organizer of the International Aviation and Space Salon MAKS-2013, which will be held in Zhukovsky outside Moscow on August 27 — September 1, announces the completion of the formation of exhibition and business event programs, according to the organizing committee aviaforuma.

"According to preliminary data, the Air Show 2013 set a record for both the number of participating companies, and the scale of international representation," — said in a statement obtained by "Interfax-AVN" on Tuesday.

According to the

Continue reading Formation of the program MAKS-2013 completed

Military pilots of the Russian Federation and France will work out firing on ground targets during joint exercises

In Nizhny Novgorod and Tver regions today launched joint flight tactical air exercise between Russia and France, told Itar-Tass spokesman for the Air Force, Colonel Igor Klimov.

"From the Russian Air Force will participate MiG-29 SMT and MiG-29 UBM, which will be piloted by the Lipetsk aviation group — he said. — French Air Force aircraft will feature" Mirage F1 ", piloted by regiment Normandie-Niemen".

According to Klimov, flights will be carried out on a group sletannosti in mixed groups of MiG-29 SMT and "Mirage F1", as well as flights of Russian-French crew on combat-capable

Continue reading Military pilots of the Russian Federation and France will work out firing on ground targets during joint exercises

The latest Russian spy plane Tu-214ON transferred into trial operation in the Russian Armed Forces

http://www.itar-tass.com/data/Newses/MainPhoto/847742.JPEG

The latest Russian spy plane Tu-214ON transferred to the trial operation of the armed forces of Russia. This decision was made by an interdepartmental committee that considered the results of the state tests this machine. This is korr.ARMS-TASS General Director and Chief Designer of "Radio Engineering Corporation" Vega "Vladimir Verba.

The Tu-214ON is a modification of the serial passenger aircraft Tu-214, which modified the design documentation of "Tupolev" to install surveillance equipment, and certified under the obligations of the Treaty "Open Skies" for observation flights in the U.S. and Canada.

The Tu-214ON is

Continue reading The latest Russian spy plane Tu-214ON transferred into trial operation in the Russian Armed Forces

On the YA KnAAZ Gagarin began construction of a new plant for the processing of aluminum alloys

Aircraft factory at the Komsomol of "dry" — "KnAAZ the YA Gagarin "construction of a new plant for the processing of aluminum alloys. During the construction of buildings with a total area of 5660 sq.m. will apply advanced construction solutions. Workshop will equip the latest technology parts manufacturing will create comfortable working conditions. Installed high-efficiency equipment with program management will provide an opportunity to unify the technology of manufacturing of parts, minimize losses and increase productivity. 

Construction of workshop machining of aluminum alloys — one of the stages of a

Continue reading On the YA KnAAZ Gagarin began construction of a new plant for the processing of aluminum alloys

Airport Ust-Ilimska reopened

This flight can be called historic — the first time in 12 years the airport of Ust-Ilimska takes flight.  «Cessna 208B Grand Caravan» — like cruising in North and South America, now the regional center and back on it will fly residents of Ust-Ilimsk. With a powerful navigation system and a reliable engine, Cessna can carry 9 passengers for short distances — to 1,700-ton kilometers.

— Autopilot is, locator, anti-icing system. The aircraft can fly day and night in adverse conditions. He sits down on the ground and strip. Strip length he needs a minimum —

Continue reading Airport Ust-Ilimska reopened

TsAGI experienced model MRCA and prospective business aircraft jet

2013-08-13n.jpg

TsAGI specialists completed the next stage of the research model of a reusable rocket and space systems (MRCA). The tests were conducted in a subsonic wind tunnel T-103 TsAGI. Client work — Khrunichev. MV Khrunichev. 

The research program landing characteristics return winged block MRCA included more than 40 starts and was aimed at studying its aerodynamics, handling, stability and flow visualization.

Earlier this spring MRCA model have been tested on the flow visualization and the distribution of heat flow. Experiments were carried out in the shock tube UT-1M (at M = 6) and

Continue reading TsAGI experienced model MRCA and prospective business aircraft jet

TsAGI experienced model MRCA and prospective business aircraft jet

2013-08-13n.jpg

TsAGI specialists completed the next stage of the research model of a reusable rocket and space systems (MRCA). The tests were conducted in a subsonic wind tunnel T-103 TsAGI. Client work — Khrunichev. MV Khrunichev. 

The research program landing characteristics return winged block MRCA included more than 40 starts and was aimed at studying its aerodynamics, handling, stability and flow visualization.

Earlier this spring MRCA model have been tested on the flow visualization and the distribution of heat flow. Experiments were carried out in the shock tube UT-1M (at M = 6) and

Continue reading TsAGI experienced model MRCA and prospective business aircraft jet

SQL - 6 | 6,937 сек. | 8.51 МБ