Calendar

Октябрь 2018
MTWTFSS
« Dec  
1234567
891011121314
15161718192021
22232425262728
293031 

SPREADING THE RNP GOSPEL

Hardly a month passes without the debut of required navigation performance (RNP) procedures somewhere around the world. The benefits have become so apparent to airlines and aviation authorities that global deployment has achieved self-sustaining momentum.

The latest new deployment is in Abu Dhabi, where Etihad Airways has conducted the first approach using the most precise form of RNP, known as RNP-AR. This allows aircraft to fly tracks that are shorter and more efficient than traditional approaches. With the help of Airbus subsidiary Quovadis, Abu Dhabi will soon have RNP flight paths throughout its terminal airspace.

RNP approaches are being installed

Continue reading SPREADING THE RNP GOSPEL

Sibmost continues to build two bridges in Novosibirsk

area

Experts Mostootryad number 96 of the Altai branch of "Sibmost" go to the next stage of the construction of concrete bridges across the river and Karakan Tatchiha in Suzun district of Novosibirsk region.

With the construction of a bridge over the river bridge builders Karakan produced boring (8 posts), the installation of beams, diaphragms on two supports and podfermennoy platform on four pillars, completed the installation of beam spans (three bays to 7 bars, a total of 21 pcs.) And cabinet walls on the support number 1 and number 4.

Continue reading Sibmost continues to build two bridges in Novosibirsk

Started construction of a new bridge over the Don

Parts of the group of companies "SK MOST" began work on the construction of a new bridge over the River Don on 280th km of the Morozov — Volgograd Volga Railroad. Builders backfilled approaches and set the pile under the support of the new single-track bridge length of almost 800 meters

Dumping ground for sub-grade on the approaches to the new bridge builders take off the bottom of the river, at the same time deepening the channel. The dredger is complicated by the presence at the bottom of a large number of metal fragments of the old span, which was

Continue reading Started construction of a new bridge over the Don

In the Novosibirsk region after the cap. repair bridge opened

October 29 was completed overhaul of the bridge over the river in Suenga Maslyaninsky district of Novosibirsk region. The bridge is more than 27 meters. The width of the carriageway without two service sidewalks — 8 meters.

During the on-site repair complete replacement spans, maintenance support, the device interfaces with the approaches of the bridge, repairs carried out approaches and arrangement of the barrier fence. A full range of construction works carried out from June to October by LLC "Strojservis-1." The cost of the work amounted to 14.5 million rubles.

(function (w, doc) { if

Continue reading In the Novosibirsk region after the cap. repair bridge opened

In Chuvashia, completed the main construction work on the construction of a bridge over the river Sura

Between km 582 +300 of M-7 "Volga" Yadrinskii Chuvashia region, construction of a bridge across the river Sura. Most of the work on the construction of the bridge structure is complete.

Construction of the bridge branch of "MOSTOTREST" CHTF "Mostootryad-41" is in accordance with the calendar, there is no lag. Bridge builders completed the installation of waterproofing and protective layer on the span. The deck is prepared for the laying of asphalt concrete pavement. It remains to install lighting masts, laying asphalt pavement on the approaches to the bridge and part of the fortification works.

The project is implemented by

Continue reading In Chuvashia, completed the main construction work on the construction of a bridge over the river Sura

In Yamal started to build a bridge across the river Pyaku-Pur

In the Yamal-Nenets Autonomous District, the construction of a bridge over Pyaku-Pur Pur in the area. April 6 at the entrance to the city Tarko-was filled with the first pile of the bridge. Subject to the timing of the construction works, to pass on the new bridge can be had in late 2013 — early 2014.

The need for the construction of the bridge due to the high volume of traffic at the site — a day passes here more 6000 cars. Now, the future construction works floating bridge. Difficulties in its operation associated with the temporary cessation of movement

Continue reading In Yamal started to build a bridge across the river Pyaku-Pur

Novosibirsk researchers grow algae for biofuel

Siberian biologists and chemists grow microalgae, which will become the raw material for biofuels.

According to scientists, micro-algae — is the most promising to date biofuels. Microalgae, along with vegetable oils, waste processing of cereal, cane, sawdust and many others form the basis for the production of biofuels — an alternative oil.

According to its characteristics microalgae grown in Novosibirsk exceed terrestrial plants. They fatter: this strain to 80% by dry weight of fat. The more fat, the more energy is obtained from them.

The head of the research group of the Institute of

Continue reading Novosibirsk researchers grow algae for biofuel

Simulation of a new generation

Ltd. "XJ Technologies" (XJ Technologies) — one of the leading companies in the field of tools and business applications of simulation in the world and the absolute leader in Russia.

material is taken from the company website: http://www.xjtek.ru/

XJ Technologies has developed, brought to market and improves AnyLogic — a new generation of tools MI, bringing together the approaches of system dynamics, the "process" discrete event and agent-based modeling. AnyLogic — is the choice of thousands of users around the world, hundreds of commercial organizatsiyi hundreds of universities. The number of our

Continue reading Simulation of a new generation

On Sakhalin put into operation a new railway bridge

At the end of last week, on the railway line Korsakov — Nogliki near the village of New commissioned a railway bridge. It is the largest bridge on the east coast of Sakhalin, its length is 149 meters.

 Photo source:sakh.com

Construction of the bridge began two years ago, experts Mostootryad Sakhalin, the total cost of about 400 million rubles.

— In accordance with the project this bridge erected on a new axis, — the deputy chief Mostootryad Julia Yahmeneva. — It is possible to get away from the railroad workers of the two curves of small

Continue reading On Sakhalin put into operation a new railway bridge

Started construction of a new bridge over the Don

Parts of the group of companies "SK MOST" began work on the construction of a new bridge over the River Don on 280th km of the Morozov — Volgograd Volga Railroad. Builders backfilled approaches and set the pile under the support of the new single-track bridge length of almost 800 meters

Dumping ground for sub-grade on the approaches to the new bridge builders take off the bottom of the river, at the same time deepening the channel. The dredger is complicated by the presence at the bottom of a large number of metal fragments of the old span, which was

Continue reading Started construction of a new bridge over the Don

SQL - 8 | 3,714 сек. | 8.39 МБ