In the Moscow region, the prominent opened a kindergarten for 285 places

The building was constructed under the project in accordance with the applicable rules and regulations in the design of pre-school, situated on a landscaped area with a total area of 1 hectare in the 6th district of the city are visible.

In the garden there are separate classes for group work, dance hall, two gyms, a music room, a computer room, sensory room, each group has its own games room, a dressing room and bedroom.

For sporting and outdoor exercise area institutions equipped play areas in accordance with the age characteristics of children, equipped

Continue reading In the Moscow region, the prominent opened a kindergarten for 285 places

In Birobidzhan opened Stadium Builder

In Birobidzhan opening a sports complex "Builder", located in the city park of culture and recreation.

On the territory of built two outdoor courts area of about one million square meters, the building gym for a game of mini-football, volleyball, basketball, badminton and tennis area of about one and a half million square meters.

Administrative unit includes a hotel, a gym, lobby and rooms with buffet service staff.

Photo

Continue reading In Birobidzhan opened Stadium Builder

Specialists NBC SOUTH hidden military airfield

For the first time in the course of a special tactical exercises (TSU) military forces CBR defense SOUTH using special means of camouflage, made "invisible" to radar and visual observation of a military airfield in the Volgograd region, the press service of the Southern Military District. With the help of special equipment military chemists put an aerosol smoke screen on the area of over 20 hectares more than 300 m in height, thus "hiding" from the aircraft and radar conventional enemy military airfield infrastructure and the surrounding area. 

Used to mask laying system TDA-2K capable of

Continue reading Specialists NBC SOUTH hidden military airfield

In the closed Zarechnyj Penza opened FLC Forest

Sport complex "Forest" is a system of sports and everyday objects: a large hall for team sports area of 1100 square meters, an auditorium with 920 seats and a small room with a platform for boxing and karate.

FLC is the core of sports soccer field, two mini-football fields, athletics track, hopping and throwing areas, a games area.

Video

In Volosovo Leningrad Region has opened a kindergarten for 140 places

September 12 in Volosovo the opening ceremony of a new kindergarten for 140 places.

With the opening of the garden area is completely closed Volosovskiy place in kindergartens.

The cost of building a kindergarten, taking into account all costs, amounted to 143.398,572 rubles.

Photo

Kindergarten in Volosovo — one of the 6 pre-school educational institutions, the opening of which will take place before the end of the year. In addition Volosovsky will open kindergartens in Gatchina and Sertolovo Vsevolozhskogo area Schlusselburg, Lodeynoye field Budogoshch Kirishsky district.

Also in

Continue reading In Volosovo Leningrad Region has opened a kindergarten for 140 places

On the progress of harvesting work in the Russian Federation as of September 10, 2013

 

According to the operative data of agricultural management entities of the Russian Federation as of September 10, 2013 grains and legumes threshed from the area of 29.2 million hectares, or 63.4% of the sown area (in 2012 it was 31.6 million hectares in 2011 g — 29.2 million hectares). Gross harvest of 67.2 million tons of grain (in 2012 — 58.5 million tons, in 2011 — 71.5 million tons). Yield of 23.0 t / ha (in 2012 — 18.5 c / ha, in 2011 — 24.5 c / ha).

Including wheat threshed with an

Continue reading On the progress of harvesting work in the Russian Federation as of September 10, 2013

Began planting the Olympic Park

Dozens of plants have taken root in the Olympic Park of Sochi. Palms, agaves, pines, cedars, cypresses, magnolias planted around the ice arenas and the main square — a place to stay and special occasions.

"Olympstroy" "Olympstroy"

Evergreen trees and shrubs will be the main decoration of the giant park, which at the same time be able to take more than 70 thousand visitors. The landscaping is carried out according to the project developed by the Russian landscape designers. Thus, a large Olympic area is divided into zones, which are now being formed lawns, miniature slides and

Continue reading Began planting the Olympic Park

In the SEZ Alabuga construction of a new industrial park

Industrial Park "A Plus Park Alabuga" is a ready-made manufacturing facility with complete infrastructure. On the territory of the new park will be located at least 20 residents of the SEZ "Alabuga", it is assumed here about 2 million jobs. Total investment in the project is estimated at $ 200 million.

Construction of an industrial park in three stages. The first phase involves the construction of the housing area of 47 thousand square meters, it will be completed in the I quarter of 2015. The second phase of construction — 50 thousand square meters, and finally, the

Continue reading In the SEZ Alabuga construction of a new industrial park

In Trinity’s running modern production Oil Extraction

The first modern oil-extraction and high-tech production in Ukraine is opened in the Trinity area in Luhansk. The press service of the Luhansk Regional Council.   "The equipment manufactured by the German company Lurgi. We are now at the stage of commissioning. Without extraction meal is still up to ten percent of the oil. Wasteful! Modern technologies allow to squeeze it, it can be said to drop. Yes, and the cake after it is better — less fat and more protein. The animals, which he goes to feed more useful, "- said the founder of" Agro Capital Group

Continue reading In Trinity’s running modern production Oil Extraction

In c. Korkmaskala (Dagestan) opened CRH Kumtorkalinskiy area

On Saturday, September 7, a solemn event dedicated to the commissioning of the Central Hospital Kumtorkalinskiy Korkmaskala area in the village.

Medical facility designed for 50 beds with a polyclinic for 100 visits per shift. At the construction site includes: main building of the hospital and infectious disease ward, commercial housing, health clinics for 100 visits per shift, a transformer and diesel stations, water reservoirs, sewage treatment plants.

The hospital set up great comfort for both patients and the medical staff. Health facility is equipped with modern equipment.

Photo

Continue reading In c. Korkmaskala (Dagestan) opened CRH Kumtorkalinskiy area

SQL - 17 | 3,686 сек. | 7.74 МБ