Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

Ukraine: new housing in the I half of 2012 grew by half

The volume injected in Ukraine in January-June, housing completions totaled 4,241 million square meters. m, which is 55.4% more than the same period in 2011, reported the State Statistics Service.

State Statistics says that this dynamic is caused by the fact that 39.9% of the total housing, or 1.678 million square meters. m have been introduced according to the time of the order for the commissioning of houses built without a permit for construction work.

According to the Statistical Office, the area received commissioned housing in single-family homes increased by 2.3 times.

Excluding this

Continue reading Ukraine: new housing in the I half of 2012 grew by half

Altai farmers have acquired more than 200 cows Aberdeen Angus

In October of animals delivered to Tyumentsevsky area. Ltd. "Altai" Tyumentsevskaya area acquired in the United States more than 200 head of cattle Aberdeen Angus. Their average weight — 450 pounds.

Animals have passed quarantine abroad. "At the end of September — beginning of October on a ship being brought into the city of Novorossiysk, then a week later by car — in Tyumentsevsky area" — explain in the Directorate of Agriculture of the Altai Territory. According to experts, among other breeds of beef cattle Angus stand high fertility, meat quality — it is very tender and has

Continue reading Altai farmers have acquired more than 200 cows Aberdeen Angus

In Perm opened processing plant bee products

September 14 in Perm opened a factory on processing of bee products. This large-scale investment project worth 645 million rubles. implements the Perm Territory company "Tentorium."

The total area of the new factory is 6000 square meters, production area — 3800 sq.m. Especially for Apikombinata, customized company "Tentorium", the German company «Ruland Engineering & Consulting» — a major manufacturer of specialized equipment for the food industry, designed and built a unique equipment.

Opening of the processing plant bee products is of great importance for the development of beekeeping industry in the region. Suppliers of raw materials for the company

Continue reading In Perm opened processing plant bee products

Ortho-Naharinskaya school in Yakutia opened in a new building

One of the oldest schools in Yakutia was presented to his centenary new well-appointed two-story stone building. On Friday in the village of Ortho-Nahar Lena area opening new buildings and the celebration of the 100th anniversary of the school.

In addition to educational institution in the building, which seats 120 people, will be posted on the school-garden 18 children.

The school, celebrating a double celebration, received from the Ministry of Education of equipment for chemistry, biology and physics, from the Commissioner for Human Rights on the PC (I) — a legal library in Russian and Yakut, from alumni living and

Continue reading Ortho-Naharinskaya school in Yakutia opened in a new building

On the way to the North Pole opened a new island

The expedition aboard the nuclear-powered icebreaker "Russia", the following changes to the Arctic drifting station, has found a new island in the archipelago of Franz Josef Land. Thus, the number of islands has increased to 192.

Back in 2006, the captain of the nuclear icebreaker "Yamal" Stanislav Rumyantsev said that the elements has eroded the isthmus between the western and eastern part of the island of Northbrook. But then confirm the hypothesis is not possible because of the weather. "We are now convinced that formed a new Strait, and in the Arctic in the structure of the archipelago of

Continue reading On the way to the North Pole opened a new island

In Yar-Sale (Yamal) opened a new sports complex

September 15 in Yar-Sale, Yamal-Nenets AO opened a new fitness center "Arctic."

In the "Arctic" is a sports hall and swimming pool, two gyms, a cafe. The complex also features an indoor ice rink, which can take up to one hundred visitors a day.

On the basis of the fitness center will operate Children’s and Youth Sports School in three sports: mini football, mini-volleyball and national sports.

Construction of the facility was conducted from November 2007 through targeted investment program for the account of JSC "Gazprom".

In 2012, the Yamal is planned to commission 23 objects of education, health, physical

Continue reading In Yar-Sale (Yamal) opened a new sports complex

In the Tver region open to traffic on three new bridges

Management of the highway Moscow-St.Petersburg opened for traffic in transit to three new bridges. The first bridge is located across the river turns in Oleninskoye area, the second through the river Meza in Nelidovskiy area, and the third — is 391km overpass on highway M-9 "Baltic" is already Zapadnodvinsky area.

Work on the repairs were done ahead of schedule by more than two months. As the road builders, the quality of the repair is not affected! When work had been entirely replaced by beams of the superstructure with a widening of the carriageway, reinforced suspension towers and foundations, arranged a

Continue reading In the Tver region open to traffic on three new bridges

In Nizhnevartovsk (Khanty) opened sports complex

In Nizhnevartovsk the grand opening of the new sports complex "Jubilee." Construction work lasted less than two years, the cost of the project amounted to 166 million rubles.

Total area — 2672 square meters. meters Here are the universal game room and a special room for storage of sports equipment. When conducting training sessions complex game room can be transformed into a playground for mini football, basketball, volleyball and tennis. Capacity of the hall — 200 people. On the second floor of the complex is a gym where you installed the line strength training equipment. In addition, the Center

Continue reading In Nizhnevartovsk (Khanty) opened sports complex

In Krasnoyarsk, has opened a new indoor playground

In Krasnoyarsk, in the Central Stadium built a new sports facility, which is part of the Krasnoyarsk School (college) Olympic reserve.

On the territory of the covered area is located a football field with artificial turf length of 50 meters and a width of 25 meters. Located on the perimeter of the track to warm up. The stands will be able to accommodate 60 fans. The total construction area of 1.8 thousand square meters

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’;
s.charset = ‘UTF-8’;
s.async = true;
s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

In Kabardino-Balkaria, commissioned Akbashsky main canal

In July 2012, the federal target program "Conservation and restoration of soil fertility of agricultural land and agricultural land as a national asset Russia for 2006-2010 and for the period up to 2013" commissioned Akbashsky main canal from outfalls in the Terek region of Kabardino-Balkaria.

The complex structures of the channel is located in the foothills of the Eastern Caucasus on the right bank of the Terek River.

Akbashsky main canal — a major part of the Republican irrigation system. The system has a multi-purpose, other than irrigation canal provides water supply for energy, fisheries,

Continue reading In Kabardino-Balkaria, commissioned Akbashsky main canal

SQL - 6 | 4,409 сек. | 8.47 МБ