The first casting of a new installation has been repeatedly punched in the jet — two blasting clear bite, there are striped! Yes, bigger, for two hundred grams. This, comrades, is the theme! You can not very overnice wiring undermine higher knock louder on the bottom. Despite the fact that this test is the top of my «Yamaga» — jig absolutely complete, no «failures», and casting and wiring — confident, adequate. Now I see a long range — and, finally, I pay attention to suvod the opposite shore. I completely forgot about it — because in the morning, with a strong side wind, catching at a distance of 35-40 meters was impossible in principle. A powerful jet of the center channel required a straight section of the cord, which would pass over it in the air, giving the opportunity to make at least two or three steps without demolition. The wind killed a catch unconditionally. But he s verse I easily shoots a jig to the opposite shore, where before sboyka main stream and tributary of the left duct formed a tempting patch of calm water. And not so penny — suvod stretches twelve meters. And what about the depth?

Hooray, the depth is. Six grams of drowning three seconds — and that at least two and a half meters. It is enough for meaningful jig — and, perhaps, enough for a predator? Broads! Undercuts, double-clutch squeal in response to a double-leap at the far end of the cord, and an instant gathering!

This is the game seriously. Very nice long-range light-jig of the jet, and an immediate response worthy of a predator. Pike? Perhaps. Clear, shot her an evil spirit — and nothing that is past. I think that in this «return pipe» should fit not one rybeha —

Continue reading The first casting of a new installation has been repeatedly punched in the jet — two blasting clear bite, there are striped! Yes, bigger, for two hundred grams. This, comrades, is the theme! You can not very overnice wiring undermine higher knock louder on the bottom. Despite the fact that this test is the top of my «Yamaga» — jig absolutely complete, no «failures», and casting and wiring — confident, adequate. Now I see a long range — and, finally, I pay attention to suvod the opposite shore. I completely forgot about it — because in the morning, with a strong side wind, catching at a distance of 35-40 meters was impossible in principle. A powerful jet of the center channel required a straight section of the cord, which would pass over it in the air, giving the opportunity to make at least two or three steps without demolition. The wind killed a catch unconditionally. But he s verse I easily shoots a jig to the opposite shore, where before sboyka main stream and tributary of the left duct formed a tempting patch of calm water. And not so penny — suvod stretches twelve meters. And what about the depth?

In Tuva, the construction of the railway Kyzyl — Kuragino

In Tuva, will be built railway length 411.7 km, which will link to Tuva and Krasnoyarsk Territory Russian railway network.

The first set of blasting construction of the railway Kyzyl — Tuvan Kuragino on its site. Work has started on the site of the future station "Kyzyl-truck" near the village of Eerbe

For the second week here are works by dumping ballast fabric of the future road. Station for about two kilometers and a width of 100 meters is designed for throughput of 15 million tons of cargo a year, including 12 million tons of coal Elegest. In case

Continue reading In Tuva, the construction of the railway Kyzyl — Kuragino

Explosions in the Kuzbass

Earthquake

Photo: aif.ru

15.11.11.Iznachalno complete disposal of obsolete ammunition scheduled until October 21. Later the military promised to stop bombings on November 15. But rumbles so far. — All blasting will be terminated on November 18, — said Yuri Sivokhin, employee information management team of the Central Military District. — Finish the disposal in time prevented weather — subzero temperature and wind. Besides the light day was much shorter. In this regard, security measures, which affected the timing of the completion of blasting.

Military took into account complaints and yurgintsev kemerovchan a strong thunder and tremors. Therefore, reduce the

Continue reading Explosions in the Kuzbass

The earthquake cracked walls in Sedelnikovo kindergarten. Video

Earthquake

13.12.12.Zhiteli station Sedelnikovo (Sverdlovsk region) complained about the earthquakes that occur because of explosions at an abandoned quarry new lens to which a straight line is only 3 km. Seismic activity has led to the fact that the roads and the buildings there are cracks, reports "News 41."

Suffered even a single kindergarten, which will be put in two weeks: on its walls have cracks. The hardest workers have the boiler room, which is located close to the quarry. Firemen go to work, as in war. Surviving window crosswise taped with duct tape, and already broken glass did

Continue reading The earthquake cracked walls in Sedelnikovo kindergarten. Video

In Krivoy Rog earthquake

Earthquakes have been recorded on Thursday, January 13, at 7.10. According to witnesses, they were felt in the city center. Residents of Krivoy Rog reported small earthquakes that occurred in the city. This writes "Today."

Earthquakes have been recorded on Thursday, January 13, at 7.10. According to witnesses, they were felt in the central part of the city — on the Square. Artem and Evening Boulevard.

One version of events began to reason blasting in mine enterprises.

Now terupravleniya Gosgorpromnadzora inspects area to identify possible shift of soil and determine the cause of the earthquake.

The version that the earthquake

Continue reading In Krivoy Rog earthquake

In Tuva, the construction of the railway Kyzyl — Kuragino

In Tuva, will be built railway length 411.7 km, which will link to Tuva and Krasnoyarsk Territory Russian railway network.

The first set of blasting construction of the railway Kyzyl — Tuvan Kuragino on its site. Work has started on the site of the future station "Kyzyl-truck" near the village of Eerbe

For the second week here are works by dumping ballast fabric of the future road. Station for about two kilometers and a width of 100 meters is designed for throughput of 15 million tons of cargo a year, including 12 million tons of coal Elegest. In case

Continue reading In Tuva, the construction of the railway Kyzyl — Kuragino

SQL - 19 | 0,802 сек. | 7.13 МБ