«Serna» — a high-speed landing craft project 11770 is ready to transition to the Caspian Sea

Municipal selection committee composed of the officers of the Caspian flotilla graduated from the municipal test speed landing boat project 11770 «Serna» at a shipyard in Nizhny Novgorod.   Specialists Commission checked the boat driving characteristics when performing different maneuvers largest travel speeds — more than 30 knots (about 60 km / h), the characteristics of all the ship’s systems and devices in combat exercises.   Tested readiness to receive and boats unloading landing on unequipped coast, also on its independent refloating.   This said the press service of the Southern Military Area.   Currently, the boat is ready to

Continue reading «Serna» — a high-speed landing craft project 11770 is ready to transition to the Caspian Sea

What to put on the Mistral? Boats and other equipment

The issue with the French amphibious assault ship (UDC) project Mistral can be considered solved. At least two such ships in the coming years will join the combat strength of the Russian Navy. But even in this case, the next question is still open. French "Mistral", as well as other UDC, created to fit the horizon landing. This means that the ship itself during the landing of troops and equipment kept at significant distance from the shore. Delivery personnel and armored vehicles in this case is special landing craft that during the campaign are located in the docking camera ship.

Continue reading What to put on the Mistral? Boats and other equipment

«Serna» — a high-speed landing craft project 11770 is ready to transition to the Caspian Sea

Municipal selection committee composed of the officers of the Caspian flotilla graduated from the municipal test speed landing boat project 11770 «Serna» at a shipyard in Nizhny Novgorod.   Specialists Commission checked the boat driving characteristics when performing different maneuvers largest travel speeds — more than 30 knots (about 60 km / h), the characteristics of all the ship’s systems and devices in combat exercises.   Tested readiness to receive and boats unloading landing on unequipped coast, also on its independent refloating.   This said the press service of the Southern Military Area.   Currently, the boat is ready to

Continue reading «Serna» — a high-speed landing craft project 11770 is ready to transition to the Caspian Sea

Laid boat landing Lieutenant Rimsky-Korsakov

The mortgage on board amphibious assault hovercraft project 21820 "Lieutenant Rimsky-Korsakov" (serial number 702) (c) of OAO "Yaroslavl Shipyard"

June 21, 2012 at JSC "Yaroslavsky Shipbuilding Plant "(managing company" VP FINSUDPROM ") in Yaroslavl accomplished festive ceremony of the second under construction at the enterprise landing craft air-cavity design 21820 (code" Dugong "), received the title of" Lieutenant Rimsky-Korsakov "(serial number 702).

The contract for the construction of a series of 3 boats of this project was signed "Yaroslavsky Shipbuilding plant "and the Ministry of Defence of the Russian Federation June 23, 2011. To mark the 200th anniversary of

Continue reading Laid boat landing Lieutenant Rimsky-Korsakov

Landings of the first roll

The story of Hero of Russian Union of Makar A. Babikova about fighting squad special purpose Pacific Fleet, the spies-leonovtsah, in broad day or captured berths 4 large ports in a deep rear of the enemy and thus to facilitate the liberation of North Korea from the Japanese invaders.

The troops … the 25th Army, commanded by Colonel-General IM Chistyakov, breaking through the defensive area of the Kwantung Army, is rapidly advancing towards the south and south-east on the terrain of Manchuria and Korea.

In this situation the command of the Pacific Fleet has decided to seize

Continue reading Landings of the first roll

Landing craft project 21820 Dugong

Landing craft project 21820 code "dugong" (NATO — Dyugon) — a series of recent Russian landing craft air cavity, the lead ship of the series is the boat — D-105, "Ataman Platov." At the current time, he is the only one built on the project and the ship comes in the Caspian Flotilla. Now the building is still two boats of this project — one built by JSC "East Wharf" in Vladivostok, the second on "Shipbuilding Plant" Volga "in Nizhny Novgorod. Also in 2011, a contract was signed for the construction of a series of 3 landing craft project at

Continue reading Landing craft project 21820 Dugong

SQL - 17 | 0,808 сек. | 7.59 МБ