Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

In p. Tolbazy (Bashkiria) opened a surgical block CRH

September 5 opening ceremony of the surgical case Tolbazinskoy central hospital.

Currently, the hospital has a 139-night-patient beds and 29 day care beds. A new surgical building designed for 35 beds. Total for the construction of a building intended order of 173 million rubles.

Photo

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s); } })(window, document);

Was — was: the General Staff Building in St. Petersburg

It is useful to recall how the city passed its Defense:

After:

In St. Petersburg, completed restoration of the General Staff Building

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h

Continue reading Was — was: the General Staff Building in St. Petersburg

Overview kindergartens, were not included in the news over the past week

In Astrakhan, after the cap. Repair opened a kindergarten for 320 places

5 September in the city of Astrakhan, in the district of shipyard named 3-International, was opened after reconstruction kindergarten number 44. Thus, all in this village was reduced to 320 preschoolers.

Built 40 years ago, kindergarten obsolete, in need of major repairs. What was done. The two-story modern building has become a second home for local children. Increase in the number of groups instead of the previous ten they became the object dvenadtsat.Snaruzhi stoned metal siding, inside is insulated floor, completely replaced the

Continue reading Overview kindergartens, were not included in the news over the past week

Made another milestone in the substation 110 kV Naro-Fominsk

in the west suburbs

Ltd. "Vympelsetstroy" (GC "Vympel") during the reconstruction works of 110/35/10 kV "Naro-Fominsk" has mounted skeleton of a building of Substation Control (GTC) and the closed distribution system (ISG) 10 kV.

Customer construction works — OJSC "Moscow United Electric Grid."

According to the Technical Director of "Vympelsetstroy" Alexander Skopintseva, "metal construction — this is a constructive element of the building, which is a strong and reliable design that performs the role of the basis for the floor elements and cladding sandwich panels. All installation of sandwich panels will be completed by the

Continue reading Made another milestone in the substation 110 kV Naro-Fominsk

In p.Tazovsky (Yamal) opened a boarding school for 420 places

By the beginning of the school year, residents of the village of Taz in the Yamal-Nenets Autonomous District, and got a nice welcome gift. September 2, the Day of Knowledge is the grand opening of a boarding school for 420 places in the building and attended by GSK "VIS". The new building is designed for students from fifth to eleventh grades. 

The school building is a structure of complex configuration with a variable number of floors (2nd and 3rd floors). The main building is divided into four blocks. Within the walls of the

Continue reading In p.Tazovsky (Yamal) opened a boarding school for 420 places

The first water park in the Arkhangelsk region is being built in the Peace

Socially significant object is constructed in the framework of the federal program "Development of the Russian space centers." 

In particular, the plan to place the building on the four bowling lanes, billiards room, sauna, several cafes, and of course, the water park, which will be the center of the entire structure.

Total area of the water park will exceed 860 square meters. The pool will consist of two bowls with a depth of 42 to 160 centimeters, so enjoy the water slides and attractions, and will be able to kids from three years old

Continue reading The first water park in the Arkhangelsk region is being built in the Peace

A new academic building of the Orenburg State University

http://onlineon.ru/static/filebrowser/img_sent2013/osukorpus20.jpg

The new building, which cost 399 million rubles, built on time: OSU was the winner of the Ministry of Education and Science of the Russian Federation "Personnel for the regions." 70 million rubles from the federal budget will be allocated for its implementation.

At the moment it is the largest academic building of the Orenburg State University. In the long term — the construction of educational buildings of 19 and 38 thousand square meters. m

Construction of nine-storey building area of 13.19 thousand square meters. m started in 2008 under the federal target

Continue reading A new academic building of the Orenburg State University

In p. Uzyanbash (Bashkiria) opened a school with a kindergarten

September 2 in the village of Uzyanbash Beloretskogo district inaugurated the new building of secondary school Uzyanbashskoy.

Under one roof, two-storey school building except for 108 seats housed kindergarten with 30 seats and the medical and health post. Construction began in 2011, a cost of 125 million rubles.

Photo

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s);
}
})(window, document);

In Omsk opened a kindergarten for 110 places

Today in Omsk commissioned a new kindergarten. Modern compact two-storey building has grown in dense residential development of Omsk left bank in less than a year.

Construction of the facility and equipping it with all the necessary cost of the regional treasury of 150 million rubles. Pre-school is designed for 110 seats.

In the new building, which consists of two interconnected buildings, has received a registration inclusive preschool center "ABVGDeyka." On a par with normal children here will be trained children with disabilities.

Photo

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt

Continue reading In Omsk opened a kindergarten for 110 places

In St. Petersburg, the school opened a new building for 550 seats

In a new residential neighborhood in the street opticians opened a second school building number 655. Capacity of the new building is 550 people — starting this school year, there will be watching high school students.

The new school has the most modern equipment: interactive whiteboards, multi-projectors, sound system and switching, document cameras, and interactive tutorials, digital lab that give the teacher used to feed the entire arsenal of modern software products, as well as create original lessons combine the techniques and training methods.

Established in classes TV panels can be used as a

Continue reading In St. Petersburg, the school opened a new building for 550 seats

SQL - 6 | 1,393 сек. | 8.47 МБ