Calendar

Ноябрь 2018
MTWTFSS
« Dec  
 1234
567891011
12131415161718
19202122232425
2627282930 

The new shop opened in the factory building ceramics in Khabarovsk

The new workshop will produce the building blocks "Teplosten" to quickly and efficiently build low-rise houses.

New production capacity — 750 thousand units per year (about 22 million cubic meters). This type of construction materials allows you to build quickly and cheaply without additional finishing facades. Blocks very good geometry can collect house of 200 square meters per day with a prepared foundation.

The factory building ceramics was opened in May this year to the 155th anniversary of Khabarovsk. 

These building blocks can be used in private low-rise buildings, low-rise complex building areas of

Continue reading The new shop opened in the factory building ceramics in Khabarovsk

In p. Noisy Primorye opened a school with a kindergarten on

300 people

September 2, the day of solemn lines indicating the beginning of a new school year in Noisy was given another start — the beginning of a new life of the school building number 5.

Lasted for more than three years of new construction, including a spacious, bright, modern school with 220 students and kindergarten, which is designed for four groups of preschoolers. In addition, the building is a large sports hall, shestiugolny music room, spacious dining room, catering department, bathrooms, library, utility room, offices for the director and teachers, and more.

In the

Continue reading In p. Noisy Primorye opened a school with a kindergarten on

URANIS expanded production capacity

In August 2013, our company has successfully completed the construction of a new production building and moved. The new production facility LLC "URANIS" area of 1,500 sq.m. has all necessary utilities and allows you to expand the production capacity of our company is more than two times.

   To date, Ltd. "URANIS" is the only company producing professional radio communication equipment in Ukraine, who are building new production facilities. Please note: our phones have changed

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type =

Continue reading URANIS expanded production capacity

New fire station opened in Izhevsk

fire station open on Gorky Street in IzhevskIt is at this point at the beginning of XX century there was the first fire tower, which were monitored.

The old building of the fire station fire resistance class III (brick walls, hardwood floors) with an area 1126 sq.m. was built in 1931 and operated until 2005.

 

According to the head of the Main Directorate of the Russian Emergencies Ministry on SD Peter Fomin, under heavy guard personnel of the fire department (number of unit, planned to place a fire station — 91 people)

Continue reading New fire station opened in Izhevsk

INSI has received a new patent for an invention

The patent for the design of the frame building frame was the eighth in the arsenal of inventions holding INSI.

http://www.insi.ru/netcat_files/3403/3666/AgoyAvto__sprint_AT_18h32h5_4.jpg

The experts confirmed the innovative character of the new design of the frame skeleton of the building (building-type "SPRINT-M"). At the time, pre-fabricated buildings of galvanized steel thin-walled structures were new. It turned out that there is still a lot of room for improvement. INSI designers have developed a new frame structure building framework. Due to the proposed technical solutions it has become more stable and increase its carrying capacity.

To understand the changes,

Continue reading INSI has received a new patent for an invention

The construction of the airport in Saburovka can be seen through the webcam

The construction of the airport in the village of Saburovka Saratov region can now be monitored using webcams. One camera is aimed at the future site of the runway, the other — to the storage of building materials and cement factory. 

According to the latest regional government, in the future airfield removed topsoil, held douplotnenie layout and the whole area is being built a runway and two taxiways. Over the entire bandwidth partially prepared subgrade for the installation of geotextile, gravel and concrete. Removed the ground under the patrol road. There are plans to begin installing

Continue reading The construction of the airport in Saburovka can be seen through the webcam

In Abakan opened a kindergarten for 300 places

The building "Kapitoshka" in size (almost 6,000 sq. m.) Is well above any running today in Abakan preschool. It is planned that the project "Kapitoshka" will be the standard, and it is for it to be built in Abakan new kindergartens.

The building of the kindergarten built on new technology using bezrigelnogo frame, giving him a large group, wide hallways, having a mini-clinics, swimming pools, physiotherapy, sensory room and other modern amenities.

Piles of future building started to score in October 2011, its construction cost of 180 million rubles.

Photo

(function

Continue reading In Abakan opened a kindergarten for 300 places

A new academic building of the Orenburg State University

http://onlineon.ru/static/filebrowser/img_sent2013/osukorpus20.jpg

The new building, which cost 399 million rubles, built on time: OSU was the winner of the Ministry of Education and Science of the Russian Federation "Personnel for the regions." 70 million rubles from the federal budget will be allocated for its implementation.

At the moment it is the largest academic building of the Orenburg State University. In the long term — the construction of educational buildings of 19 and 38 thousand square meters. m

Construction of nine-storey building area of 13.19 thousand square meters. m started in 2008 under the federal target

Continue reading A new academic building of the Orenburg State University

In p. Uzyanbash (Bashkiria) opened a school with a kindergarten

September 2 in the village of Uzyanbash Beloretskogo district inaugurated the new building of secondary school Uzyanbashskoy.

Under one roof, two-storey school building except for 108 seats housed kindergarten with 30 seats and the medical and health post. Construction began in 2011, a cost of 125 million rubles.

Photo

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s);
}
})(window, document);

In the Altai Republic opened a new building Gorno-Altai University

http://altai-rep.er.ru/media/userdata/news/2013/09/03/3387e888ad3e37bc9c56fbe2f6fb0277.jpg

September 2, the Day of Knowledge in the Gorno-Altai State University solemnly opened a new teaching laboratory building. The new premises will be taught the students the five faculties of social management, legal, psychological, pedagogical, faculty and Altaic Turkic Studies and Philology.

Faculty of Philology created by combining two previously existing faculties — the Faculty of Philology, and foreign languages.

In the past year, according to the Ministry of Education and Science of the Russian Federation GASU was among the schools with signs of inefficiency. One of the criteria used to evaluate high

Continue reading In the Altai Republic opened a new building Gorno-Altai University

SQL - 6 | 4,222 сек. | 8.45 МБ