Calendar

Июль 2018
MTWTFSS
« Dec  
 1
2345678
9101112131415
16171819202122
23242526272829
3031 

Voronezh State University have built a new building

Photo: rg.ru

VSU Campus in North neighborhood filled with academic building number 10 for the Faculty of Economics. A covered walkway connects it with the old building, "steward" and geological faculty, next to erect a comfortable hostel, swimming pool and a housing for the future of IT-cluster.

The three story building is ready to accept students on September 1. 

Spacious auditorium and lobby, room for six chairs, two from the book depository libraries, doctor’s office (with procedural separation), dressing room and dining room — all as it should be. One of the four inline

Continue reading Voronezh State University have built a new building

Airport Ust-Ilimska reopened

This flight can be called historic — the first time in 12 years the airport of Ust-Ilimska takes flight.  «Cessna 208B Grand Caravan» — like cruising in North and South America, now the regional center and back on it will fly residents of Ust-Ilimsk. With a powerful navigation system and a reliable engine, Cessna can carry 9 passengers for short distances — to 1,700-ton kilometers.

— Autopilot is, locator, anti-icing system. The aircraft can fly day and night in adverse conditions. He sits down on the ground and strip. Strip length he needs a minimum —

Continue reading Airport Ust-Ilimska reopened

Completed the zero phase of the construction of the building the Trans-Baikal RDU

Ltd. "Vympelsetstroy" (GC "Vympel") has completed construction of the zero phase of the building control center Transbaikalian RDU. Construction Customer — Open Joint Stock Company "System Operator of the Unified Energy System".

According to the project of construction of Julia Yakupova, "works on removal of utilities from the construction site, as well as lightning protection, vibration protection, underground part of the building. Routed outside the utilities (water, sewer). In accordance with the schedule of works, work began on the construction of the ground part of the RDU. The works on the concrete frame of the building of

Continue reading Completed the zero phase of the construction of the building the Trans-Baikal RDU

A new kindergarten opened in Udmurtia region Malopurginskogo

The old building was designed for kids 90 and entered kindergarten to accommodate 240 children. That expansion to solve the problem with the order. Now turn to kindergarten from 3 to 7 years in Malaya Purga not.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s); } })(window, document);

Continue reading A new kindergarten opened in Udmurtia region Malopurginskogo

The new school opened in Ingushetia

In the rural community Kantyshevo Nazran district of Ingushetia opened a new school for 704 pupils.

The contract value of the school — 229 million rubles. The building consists of four blocks in a separate two-story building is a workshop equipped with modern milling machines and lathes. There are a large gym area 18h38, showers, locker rooms. Dining room seats 300 people. Assembly hall for up to 400 people can hold conferences, events national scale.

Only in an area of 3 hectares built about 400 different rooms, self-contained sewage treatment capacity of 1,500 cubic meters per

Continue reading The new school opened in Ingushetia

In Solnechnogorsky district of Moscow region opened a new clinic

August 20 in the village of Lunevo Solnechnogorsky district clinic was inaugurated — the structural unit Mendeleev city hospital.

In recent years the area of health care have changed dramatically: the modernization program with co-financing from the regional and municipal budgets managed to repair clinics, health centers, most of the offices STSRB. The newly constructed building — the second after the children’s clinic in Solnechnogorsk — built in two years thanks to the joint efforts of the district administration and the rural settlement Lunevskoe and help local businesses.

The value of the new clinic

Continue reading In Solnechnogorsky district of Moscow region opened a new clinic

Information Centre Yew and boxwood trees

Yew-tree grove is part of the Caucasian State Nature Reserve. She is not only one of the most beautiful places in the Black Sea coast of the Caucasus, but also a rare monument of nature, which has relict vegetation and climate. That is why the grove chosen as the object of the show for a Winter Games in 2014 with the introduction of a program of construction of Olympic facilities and development of Sochi as a mountain resort.

This status has imposed certain requirements of the natural complex arrangement to ensure the safety and accessibility for all

Continue reading Information Centre Yew and boxwood trees

In the Pskov region launched the construction of a plant for deep processing of timber

August 15, the district of the Pskov region Dedovicheskom the ceremony of laying the foundation stone of the new high-tech enterprise for deep processing of timber — timber "court". This is the first such production in the North-West. 

Plant a "court" — part of a major investment project of the holding GS Group, implemented in the Pskov region in two stages. In the first division created by logging, as well as the construction of forest nursery technology closed root system. In the nursery annually will grow to 2 million seedlings, of which 500 million will

Continue reading In the Pskov region launched the construction of a plant for deep processing of timber

In the Kemerovo region is building Breeding Center

Agricultural holding "Kuzbass" Krapivinsk district is building a new breeding complex for 400 head of cattle.

In the spring construction team began the construction of the walls of the new complex. They are made of brick two feet in width. Part of the walls are plastered. Now workers pour concrete mix technology passages and feed tables. After that, workers will begin installation of the roof. It will make the new technology — ready-combined. The central part of the roof along the entire room will be almost transparent. It is made out of polycarbonate — a modern material

Continue reading In the Kemerovo region is building Breeding Center

In the Ryazan region opened a new building of the Alexander Nevsky CRH

The new building of the central hospital of St. Alexander Nevsky district, a total area — 5.1 thousand square meters. m, a capacity of 80 beds. The building housed the emergency room, emergency room care, medical ward of 34 beds with an intensive care nursing center by 50 per shift, as well as physical therapy, pediatric and surgical departments.

Photo: 7info.ru

In the CRB will be not only the usual operations, but also provide assistance to victims of road accidents (near trail passes M6).

Photo: 7info.ru

The work was done as part of a long-term target program

Continue reading In the Ryazan region opened a new building of the Alexander Nevsky CRH

SQL - 11 | 5,102 сек. | 8.5 МБ