In p. Kyzyl-Ozek Altai Republic has opened a kindergarten for 140 places

.

Today, the village of Kyzyl-Ozek Maiminsky district of the Altai Republic organized a welcoming opening of the kindergarten "Spark".

Kindergarten building — a new, modern building with 140 seats. The estimated cost of construction amounted to more than 20 million rubles, of which 17 were allocated from the national budget, the rest of the local budget. Agencies to provide basic and auxiliary facilities, acquired all the necessary furniture, soft equipment. Head of Works, 12 teachers, senior teacher, teacher-speech therapist, educational psychologist, pathologists, music director, head of physical education.

Continue reading In p. Kyzyl-Ozek Altai Republic has opened a kindergarten for 140 places

Information Centre Yew and boxwood trees

Yew-tree grove is part of the Caucasian State Nature Reserve. She is not only one of the most beautiful places in the Black Sea coast of the Caucasus, but also a rare monument of nature, which has relict vegetation and climate. That is why the grove chosen as the object of the show for a Winter Games in 2014 with the introduction of a program of construction of Olympic facilities and development of Sochi as a mountain resort.

This status has imposed certain requirements of the natural complex arrangement to ensure the safety and accessibility for all

Continue reading Information Centre Yew and boxwood trees

In the Pskov region launched the construction of a plant for deep processing of timber

August 15, the district of the Pskov region Dedovicheskom the ceremony of laying the foundation stone of the new high-tech enterprise for deep processing of timber — timber "court". This is the first such production in the North-West. 

Plant a "court" — part of a major investment project of the holding GS Group, implemented in the Pskov region in two stages. In the first division created by logging, as well as the construction of forest nursery technology closed root system. In the nursery annually will grow to 2 million seedlings, of which 500 million will

Continue reading In the Pskov region launched the construction of a plant for deep processing of timber

In the Kemerovo region is building Breeding Center

Agricultural holding "Kuzbass" Krapivinsk district is building a new breeding complex for 400 head of cattle.

In the spring construction team began the construction of the walls of the new complex. They are made of brick two feet in width. Part of the walls are plastered. Now workers pour concrete mix technology passages and feed tables. After that, workers will begin installation of the roof. It will make the new technology — ready-combined. The central part of the roof along the entire room will be almost transparent. It is made out of polycarbonate — a modern material

Continue reading In the Kemerovo region is building Breeding Center

In the Ryazan region opened a new building of the Alexander Nevsky CRH

The new building of the central hospital of St. Alexander Nevsky district, a total area — 5.1 thousand square meters. m, a capacity of 80 beds. The building housed the emergency room, emergency room care, medical ward of 34 beds with an intensive care nursing center by 50 per shift, as well as physical therapy, pediatric and surgical departments.

Photo: 7info.ru

In the CRB will be not only the usual operations, but also provide assistance to victims of road accidents (near trail passes M6).

Photo: 7info.ru

The work was done as part of a long-term target program

Continue reading In the Ryazan region opened a new building of the Alexander Nevsky CRH

On the basis of the Saratov Collective Security Treaty Organization, opened the first laboratory building

In Saratov Oblast Children’s Hospital has opened a new, meets all modern standards and requirements of the case. The initiator of the reconstruction of "protracted" (the project was implemented over 8 years) was made governor Valery Radaev. For the construction of the region’s budget has been allocated about 20 million rubles. For laboratory building was bought modern equipment worth 5.6 million rubles. At the moment there are 2 offices — infectious and sanitary-bacteriological. The opening of the new building allows several times to increase the volume of research studies to expand the range of different groups of pathogens. Also,

Continue reading On the basis of the Saratov Collective Security Treaty Organization, opened the first laboratory building

Pension Southern in Adler expanded to 200 rooms

 

When entering the Adler district of Sochi built second stage pension "Southern" 4-star, 200 rooms. The current portion of pension and new development divided highway of federal importance — Lenin Street.

© tradeunique.com

Authors: General designer — "Treydyunik SRL" (Italy) Authors stage "Project Documentation", LLC "PTAM Vissarionova" — Arch. YG Vissarionov (Supervisor), KM SAVKIN, SS Voronin, MA Cherniavskyi, DV Ziborov, TA Moskvina, etc.

The original version of the complex is not much different from being implemented.

View from the sea. Searched for a hotel complex tower LCD "Sea

Continue reading Pension Southern in Adler expanded to 200 rooms

In Yekaterinburg opened a school for 875 seats

August 16, 2013 in a solemn ceremony opened a school-new building in the Leninsky district of Yekaterinburg.

In the new building will be able to study 875 children. At this point in the class have already enrolled 733 people, reception pupils will continue until September 1.

The complex architecture of the building by a variable number of floors with total area of 19,250 square meters will be able to comfortably accommodate almost a thousand people. In addition to the spacious classrooms in the school dining room located, accommodating 325 students in one shift, bunk

Continue reading In Yekaterinburg opened a school for 875 seats

Console started the year holiday housewarming party in Yalta

The largest developer of the peninsula gave shareholders a regular apartment building. After completing the last year of the commissioning of the multi-storey building on the street. Kalinin in Simferopol, "Console" a new beginning, in 2013 with a holiday housewarming party in Yalta. Elegant seven-story house adorned one of the oldest streets of the southern capital: 37 families received the keys to the apartments in the second stage of luxury apartments on the street. Tauris 

The house on the street Tauris — in the center of Yalta, in a quiet area, a 5-minute walk from the

Continue reading Console started the year holiday housewarming party in Yalta

For the servicemen of the Russian military base in South Ossetia put into

commissioned a new school building

The Russian military base of the Southern Military District (SOUTH), stationed in the Republic of South Ossetia, the military took on the organization of a new academic building housing a total area of 2.8 thousand square meters. m, which will train personnel in various specialties.

In the 2-storey building designed by 56 classrooms accommodating up to 20 people each. Until the end of this year, classrooms will be equipped with the most modern information technology equipment — the target and tactical simulators, interactive displays and simulators driving armored and wheeled military vehicles,

Continue reading For the servicemen of the Russian military base in South Ossetia put into

SQL - 17 | 1,488 сек. | 7.76 МБ