Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

In the Moscow region opened a new building Dolgoprudny central city hospital

The construction of a seven-story surgical building at 230 beds spent 1.5 billion rubles. Operating in the new building equipped with sophisticated medical equipment and according to experts are among the best in the suburbs.

The cost of equipment for surgical cases — more than 500 million rubles.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s); } })(window, document);

Continue reading In the Moscow region opened a new building Dolgoprudny central city hospital

Opened new fire stations. Mini-Review

The building was constructed by the type of production and technology center and is designed for four out of fire trucks. In the fire station will be located Specialized training base, consisting of heat and dymokamery and training tower, necessary for developing the strength and dexterity in the fire department. As described in the Department of Civil Protection of Primorsky Krai, the construction of a new depot will enable firefighters arriving on the scene in the standard time, which will help avoid tragedies. In addition, staff will be increased by the fire department to 45 people. It is planned that

Continue reading Opened new fire stations. Mini-Review

In Khabarovsk, after the reconstruction of the oldest children’s home opened

The renovated building will house the assembly, sports and fitness facilities, dressing room and costume, labor workshop for boys and sewing — for girls, a computer room and a library, a study of psychological relief.

In the neighborhood are equipped with a soccer field, volleyball and sports fields. The cost of the work amounted to 67 million rubles, the full cost of repairs took over the regional budget.

In the Khabarovsk region today more and more families are taking on the education of children from children‘s homes. In the province, the conditions for adoptive parents, they are paid

Continue reading In Khabarovsk, after the reconstruction of the oldest children’s home opened

Oka Shipyard has put into operation the first tanker project RST27 VF Tanker — 19

June 28, shipping company "VF Tanker" has taken into operation built in the ninth Navashino (and nineteenth, considering Sormovskie court) serial tanker "Volga-Don max" class project RST27 deadweight in the sea / river 7030/5428 tons of "VF Tanker — 19 "(building number 02709).

In this case, "VF Tanker — 19" — the first Navashino tanker series RST27. Customer — shipping company "VFTanker" is a holding company VBTH, the majority shareholder of which is the international transport group Universal Cargo Logistics Holding, consolidating a number of Russian shipping, stevedoring and shipping companies.

Contract DWT 6980/5378 tons of

Continue reading Oka Shipyard has put into operation the first tanker project RST27 VF Tanker — 19

Overview kindergartens, were not included in the news over the past week

In Vologda, after the cap. Repair opened a kindergarten for 300 places

In Vologda opened kindergarten "Lenok."

Construction work in a kindergarten in the street Spinner began in January 2013. For six months the facility has done a lot of work: redecoration, double-glazed windows, replaced plumbing, wiring, ventilation system, installed automatic fire alarm and warning system, and a video surveillance system.

The repair of the kindergarten has been allocated more than 50 million rubles. Landscaped grounds and gardens. A special pride — is grounds for walking. There is also a separate playground and

Continue reading Overview kindergartens, were not included in the news over the past week

In Novosibirsk, opened a kindergarten for 220 places

June 28 Zaeltsovsky district of Novosibirsk opened the second building of the kindergarten № 274 "Squirrel".

A three-storey garden on the street. Medkadry 9a built in two special programs at the level of the city and the region. The second building of the kindergarten number 274 for up to 220 children, was the first garden deposited on the program in 2013. He began to build in the middle of 2012.

The construction and design of a three-story garden was worth 143.8 million rubles.

The building has a food processing unit, a laundry

Continue reading In Novosibirsk, opened a kindergarten for 220 places

In Karabulak (Ingushetia) opened a factory for the extraction and processing of non-metallic building materials

In Karabulak ceremony of commissioning of the plant for the extraction and processing of non-metallic building materials. The plant created 50 jobs.

The plant consists of an automated concrete-mixing unit capacity of 20 cubic meters per hour, crushing and screening plant capacity of 90 cubic meters per hour. The total enterprise value — 149 million rubles., Of which about 90 million rubles. spent on the purchase of 17 units of specialized equipment. This heavy-duty trucks for special purposes — KamAZ and KrAZ. All equipment meets current requirements, it is manufactured by domestic enterprises.

Photo

(function

Continue reading In Karabulak (Ingushetia) opened a factory for the extraction and processing of non-metallic building materials

International Center of passenger and cruise shipping is being built in Sochi.

In the second stage of the transformation of Sochi seaport in the passenger port, construction of two berths with a total length of over 700 meters with guards jetties, breakwaters and the protective breakwater, two berths with a total length of 380 meters, fleet berths and an office building and the building across the state border of the Russian Federation .

Builders completed a five-story reinforced concrete frame office building. Ongoing construction of metal structures for the two-story building across the state border of the Russian Federation.

 

General contractor: "Rosmorport"

Continue reading International Center of passenger and cruise shipping is being built in Sochi.

Warm House for newcomer.

Energy efficient housing — a priority in the construction of

The development trend of building complex is obvious: it is necessary first of all to build one-story house with the use of pre-fabricated and heat-saving designs. These homes and cheaper cost to the buyer, and warmer, and pay utility bills in them, as practice shows, is far less than usual. And then it is not necessary to use expensive foreign construction materials. The village Dolgorukovo Lipetsk region for several years successfully running factory-fabricated housing, LLC "Pearl", which is effectively using the advanced European experience and Russian innovative

Continue reading Warm House for newcomer.

The construction of the 110 kV substation Flagman

Ltd. "Vympelenergoproekt" (GC "Vympel") embarked on the design and survey works for construction of 110/10 kV "Flagman", located in the north suburbs.

Construction Customer — GC "flagship".

According to the Deputy General Director of "Vympelenergoproekt" Helena Tayupova, "the complexity of this project is due to the terrain at the site of the future building. Vertical marks — 9 pm Our experts had to deal with a difficult task to place in these conditions of the building and equipment, as well as for the organization of access roads to the substation. "

In

Continue reading The construction of the 110 kV substation Flagman

SQL - 6 | 0,774 сек. | 8.51 МБ