Calendar

Июль 2018
MTWTFSS
« Dec  
 1
2345678
9101112131415
16171819202122
23242526272829
3031 

The company SSTenergomontazh established a system of heating of the roof

convention center hotel "Moscow"

Engineering company "SSTenergomontazh" which is a group of companies "Special systems and technologies", as part of a multifunctional complex reconstruction of hotel "Moscow" provides a complete solution for the protection of the roof of the complex of snow and ice. The company "SSTenergomontazh" has significant experience working on objects of cultural value. The company’s specialists have equipped of electrical heating of the roof of the Bolshoi Theatre and State Historical Museum, the building of the Central Bank of the Russian Federation and the Federal Treasury, the Kazan Kremlin and many other architectural sites.

Continue reading The company SSTenergomontazh established a system of heating of the roof

The new building of the kindergarten for the first time in 20 years opened in Nikolsk (Vologda region).

The new building of the kindergarten "Sun" with 80 seats opened in Nikolsk Vologda region on Wednesday, March 20. The opening of the garden will provide a place to preschool for all children older than two years. In the queue for places in the city today 167 children.

The new building of the kindergarten was opened in the city for the first time in 20 years. It is built on pre-fabricated technology. This body was the fourth of the 16 pre-school educational institutions in the region are built in a public-private partnership. 

(function (w, doc) {

Continue reading The new building of the kindergarten for the first time in 20 years opened in Nikolsk (Vologda region).

The new terminal Pulkovo

At the construction site of the new central passenger terminal "Pulkovo" I ended March 14, in the company of two colleagues. In this volume, and angles of the new terminal building still no one showed, so to some extent, this first report, in which the object will be shown on all sides, top and inside. Watch it! The ceremony of laying the first pile of the new passenger terminal was held November 24, 2010, and the planned date of entry of a new terminal complex completed — December 2013 View from the roof of the old terminal Pulkovo-1 (from

Continue reading The new terminal Pulkovo

Overview kindergartens, were not included in the news over the past week

In the village. Rakitino Kaliningrad after the cap. Repair opened a kindergarten for 75 children

In the village of Rakitino Neman district renovated kindergarten opened "asterisk". Reception children started on March 12, the grand opening was held on March 20. Typical two-story building stood empty for several years after the department was closed children’s home, which has taken in the early 90’s empty kindergarten.

Repair lasted five months. During this time, have been updated roof and facade of the building, replaced the floors and windows, made sanitary, electrical and other work, fire alarm system installed.

Continue reading Overview kindergartens, were not included in the news over the past week

ZIO-Podolsk manufactured equipment for the compressor station Nakhodkinsoye

Machine Building Plant "ZIO-Podolsk" (included in the Engineering Division of Rosatom-AtomEnergoMash) has completed and started production of the supply of sets of filters, separators for the booster station Nakhodkinsoye Yamal "Lukoil".

Engineering and engineering documentation for the equipment developed by specialists IR "ZIOMAR" technical project of JSC "RusGazProekt."

The station will be installed three filter separator, two of which are sent to the customer. The complete unit includes filter-separator drain and inlet gas pipeline system, frame, oporyi service platforms, as well as the control and automation of process technology.

Filters are horizontal cylindrical

Continue reading ZIO-Podolsk manufactured equipment for the compressor station Nakhodkinsoye

In Grozny, the opening of the Radio House

Construction of a five-story building began in late 2008, according to the federal target program. The building will be located: the Ministry of the Chechen Republic for National Policy, Press and Information and radio "Terrible".

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s); } })(window, document);

The new office and equipment for firefighters in the Komi and Novosibirsk

Firefighters in the village Seregovo Knyazhpogostsky district of the Komi Republic now carry clock duty in the new building. The building offers a warm box for two tanks and auxiliary facilities, including post gazodymozaschitnoy service, rooms for duty and rest.

Firefighters ensure the safety of the villagers and the village Seregovo cats, as well as local health facilities, education and culture.

With the support of the Republican government control fire service acquired log cabins made of logs. Of these, the depot was built not only in Seregovo, but also in four other villages of Ust-Kulomskiy,

Continue reading The new office and equipment for firefighters in the Komi and Novosibirsk

Overview kindergartens, were not included in the news over the past week

In the Montenegrin (Khakassia) after the conversion and renewal. Repair opened a kindergarten for 200 places

Kindergarten building was constructed in 1977, then there is a children’s home and later Center for Children and Youth Creativity. In 2011, the reconstruction of the "Golden Fish", which cost 51.5 million rubles. Changed the layout, windows have been replaced and the roof completely replaced the heating system and water supply.

The "Golden Fish" for preschoolers will operate studio artistic and aesthetic development, study educational psychologist, speech therapist, teacher’s office and a room of psychological relief. Sports and music

Continue reading Overview kindergartens, were not included in the news over the past week

New medical and obstetric stations built in the Volgograd region

The modern medical facility in the village of Meadow Proleyka Autograph district was built in just 8 months.

New medical and obstetric point — is a separate building, equipped with everything necessary within the framework of the regional target program "Social development of the village," in which individual doctors’ offices will now be able to take up to 30 patients a day.

A few days earlier the same FAP opened in the St. Nicholas area, and just before the end of this year, the region will have the same five points. 

The

Continue reading New medical and obstetric stations built in the Volgograd region

In Pereslavl Yaroslavl region, opened the first phase of the plant VITAFARM

In Pereslavl came into operation another object of Yaroslavl pharmaceutical cluster — plant "VITAFARM." The investment project was launched in 2010. The company has leased the building and land in Pereslavl by signing an agreement with the City.

In December last year he completed the renovation of the first building area of 500 square meters for the production of probiotics.

In February of this year, started the production of products. The new plant will manufacture drugs for the treatment of intestinal dysbiosis and immunomodulators. And soon begin production of a vaccine "Vitagerpavak" against gerpis-viral infections.

Continue reading In Pereslavl Yaroslavl region, opened the first phase of the plant VITAFARM

SQL - 6 | 4,319 сек. | 8.47 МБ