Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

In p. Kinel-Cherkassy Samara region opened a kindergarten for 100

places

January 18 opening ceremony of the third stage of kindergarten "cornflower", which is a structural unit of SEI school № 1 "OC" with. Kinel-Cherkassy.

The building of the kindergarten was opened after a complete renovation, which took place from the beginning of 2011.

During this time the building was made of 2-storey building for being there 100 preschoolers. Kindergarten building is equipped with four groups, two game rooms, sports (music) room and nutrition units, equipped with modern equipment. All groups are equipped with new furniture, gaming and developing equipment.

For the reconstruction

Continue reading In p. Kinel-Cherkassy Samara region opened a kindergarten for 100

Overview kindergartens, were not included in the news over the past week

In Nakhodka after conversion opened the first phase of a kindergarten for 90 seats

The building was transferred to the municipality and a half years ago — Administration Finds bought it from Primorsk Shipping Corporation. Former preschool idle for a long time, for a time was used as a shopping mall. Local authorities have to balance it with the sole purpose — to return the child and turn it into a modern educational and development center.

Purchase cost the city budget of 22 million rubles. Still about 30 million spent on major maintenance, which allowed

Continue reading Overview kindergartens, were not included in the news over the past week

Life under the dome: in the Crimean mountains built a house-hemisphere

Life under the dome: in the Crimean mountains built a house-hemisphere House-hemisphere

The structure resembles the dome of the observatory, and similar in design to the needle — Eskimo ice hut.

The dirt road to the village of High makes a loop, coming down from the mountain, and the first thing we see at the bottom — an unusual house. The structure resembles the dome of the observatory, and similar in design to the needle — Eskimo ice hut. But this is not exactly the ice — covered tent standard soft tile dark green, almost black

Continue reading Life under the dome: in the Crimean mountains built a house-hemisphere

In Kaliningrad, opened the new building of the Regional Court

January 15, 2012 Kaliningrad reporters revealed a new building at the Regional Court on the banks of the Lower Lake. Construction of a 4-storey building was conducted for almost 4 years, the federal budget has allocated 586 million rubles work. Facade in the style of Konigsberg has developed a workshop Oleg Kuperdyaeva, former chief architect of Kaliningrad.

Before moving to the Regional Court of 10 years, housed in a building on the street. Leonova, the staff were sitting in the offices of two by two, and meeting halls were only six. The new building them? 13,

Continue reading In Kaliningrad, opened the new building of the Regional Court

In Irkutsk, has opened a new kindergarten for 220 places

January 16th was the grand opening of a new kindergarten N95, located in the street Michurina in the Leninsky district of the city of Irkutsk. Construction of the kindergarten was started in October 2011.

The building has separate bedrooms, swimming pool, sports and music halls, a computer lab, a room for meals staff, a sports field. On the territory of the establishment of the lot for the study of the rules of the road.

During construction, the building of the garden was let down by hot water, heat extend new networks and communications. On

Continue reading In Irkutsk, has opened a new kindergarten for 220 places

In Novomoskovsk district of Moscow has opened two kindergartens

On January 15, joined the second building of the kindergarten № 1086 "Snow White", located in the urban settlement of Moscow at st. Rainbow, 12.

It is now operating two groups of short days (before lunch). On February 1, in the new building will be organized supply system and a group will move to full activity for the day. In the future work of 11 groups in the amount of 330 children.

 

In the process of construction:

January 15 started working the second building of the kindergarten № 1088

Continue reading In Novomoskovsk district of Moscow has opened two kindergartens

The modern library built in NTU KPI

This fall at the National Technical University "Kharkiv Polytechnic Institute" a new building scientific and technical library.

Urban Watch In Polytech built a new library

The idea to build a new building the library, the construction of which began in 2004, belongs to the rector of the university Leonid Tovazhnyansky. The works are made mostly borrowed funds. For example, some funds have listed former graduates — members of the Association of Polytechnics and organizations that are working successfully politehovtsy.

According to Library Director Larisa Semenenko, in a six-story building will house the library

Continue reading The modern library built in NTU KPI

In Barnaul, opened-the-art Federal Center of Traumatology, Orthopaedics and Prosthetics

In the children’s ward patients meet the Dragon, three heroes, rabbits, bears and tigers. Previously, this could be seen except in American cinema: a super-modern hospital equipment, comfortable house. In general, the dream has come into reality. The other day in full force started Federal Center of Traumatology, Orthopaedics and Prosthetics.

Specialized agency of the trauma and orthopedic patients in the province was not. There were only the branches of medical institutions, including the Novosibirsk Research Institute — said the head doctor Lyudmila Grigoricheva institutions. — And because federal quotas for residents of the region operations issued irregularly.

Continue reading In Barnaul, opened-the-art Federal Center of Traumatology, Orthopaedics and Prosthetics

In the suburban town of Ruza and Artesian (Kalmykia) after the cap.

repair of schools opened

Today, in the village of Artesian after reconstruction, the federal program "emergency measures in state and municipal educational establishments" opened built more than 70 years ago, high school number 2. Now the children will learn to virtually re-constructed building.

After the Christmas holidays school students Ruzskaja number two returned to his home institution, which was overhauled in 2012.

On September 1, students were trained in the second shift at the two other schools of Ruza. But this is a temporary inconvenience offset by a fully renovated building.

Continue reading In the suburban town of Ruza and Artesian (Kalmykia) after the cap.

In Bilohirsk Amur Region has opened a kindergarten for 100 places

January 16 Bilohirsk opened a kindergarten for 100 places. The building was built in 1987 and for 10 years was in charge of the Ministry of Defence. In 1997 it was closed and handed over to the municipality. After the house is located in a building of children’s creativity. The decision on the reconstruction of the building for a kindergarten was adopted in 2012. "The Return" at a cost of nearly 40 million. Funds were allocated from the regional long-term target program "Development of Education Amur Region for 2011-2015" and the city budget.

Reconstructed kindergarten for

Continue reading In Bilohirsk Amur Region has opened a kindergarten for 100 places

SQL - 6 | 3,848 сек. | 8.52 МБ