Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

In Yakutia running fiber optic length of about 1 thousand km

In the Republic of Yakutia (Sakha) launched the first in Yakutia area fiber-optic trunk "Tynda-Yakutsk" length of about one thousand kilometers and a capacity of 40 Gbit / s.

Highway built by "TransTeleKom" (TTC) under an agreement with the Government of the Republic of Sakha (Yakutia), signed in March 2012. Currently, the TTC is building broadband networks in Yakutsk and Neryungri. The first connection in these cities will be implemented in early 2013. Launched today, the backbone area will be the basis for the communication infrastructure as a service, and electronic gossuslug.

According to the President of TTK

Continue reading In Yakutia running fiber optic length of about 1 thousand km

The building compressor Novovoronezh NPP-2 started installation of equipment

Novovoronezh NPP-2 (general designer and general contractor — JSC "AEP" Moscow) started the installation of equipment in general compressor. The building has a compressor (area — about 1,500 square feet) is located pneumatic equipment with which the compressed air system will be provided by the auxiliary reactor building, building water treatment, etc. Also, before starting the unit with a compressor unit will be pnevmoispytaniya on the strength of the containment building reactor, during which the inside of the containment air pressure is generated four kilograms per square centimeter.In total, the building of general compressor specialists will assemble more than

Continue reading The building compressor Novovoronezh NPP-2 started installation of equipment

In Novosibirsk, a kindergarten The Mansion

Kindergarten № 451 "The Mansion" was built in 1983. In April 2012 it was decided to carry out repair work in the building as part of the departmental target program "Ensuring access to early childhood services in the city of Novosibirsk." In addition to reconstruction, the building was built on the third floor, and now instead of 180 kindergarten children can take 360. For the reconstruction of the kindergarten of urban and regional budget was sent to more than 150 million rubles.

This year, in the Novosibirsk region will be introduced 8200 places in kindergartens, 3,700 of them in the

Continue reading In Novosibirsk, a kindergarten The Mansion

In Petropavlovsk-Kamchatsky built the first home for young professionals

December 21, keys to new apartments in a new building for the youth got the first 13 young families Kamchatka. Doctors, cultural workers, teachers, social workers, athletes have become residents of a modern, comfortable apartments.

Total ownership of Kamchatka in the two houses for the youth purchased 100 apartments with a total area of more than 5 thousand square meters, which will be used as office accommodation for young professionals who need to improve their living conditions. Acquisition of property was part of the regional target program "Youth of Kamchatka 2010 — 2012 years."

The first stone of the new

Continue reading In Petropavlovsk-Kamchatsky built the first home for young professionals

On Sosnovskoye factory ship is based on two environmental projects RT29

December 20, 2012 at Sosnovskoye Shipyard (CEO Murat Duguzhev) hosted a ceremony of laying the first two vessels of environmental RT29 (building numbers 10601 and 10602).

 Customer — PKU "Rechvodput" Federal Agency of Maritime and River Transport of the Russian Federation.

RT29 project designed by the Marine Engineering Bureau (Odessa).

Environmental vessel is intended for reception and delivery of sewage Sewage-and bilge waters and waters with a flashpoint below 60 ° C and dry garbage.

Navigation area — inland waterways of Russia and the appropriate navigation area about 2.0.

Continue reading On Sosnovskoye factory ship is based on two environmental projects RT29

The new library building them. I.I.Molchanova Siberian opened in Irkutsk

The solemn ceremony of putting into operation of the new building of the Irkutsk Oblast State Universal Scientific Library. II Molchanov-Siberian was held on Wednesday, December 19. At a ceremony attended by Governor Sergei Eroschenko, who said that he had signed an order to that in 2013 in the Irkutsk region declared the Year of libraries.The new building is equipped with modern equipment. According to Library Director Olga Stasyulevich, it is the only building in Siberia modern library.Sergei Eroschenko said that on the basis of libraries in each district of the region will create a modern cultural and educational

Continue reading The new library building them. I.I.Molchanova Siberian opened in Irkutsk

A new building CRH Pavlovo in the Nizhny Novgorod region

In Nizhny Novgorod region on December 22 opened a new building Pavlov central hospital. Construction of new housing facilities were built in the framework of the program of social and physical infrastructure of the region.

Primary vascular compartment, multi-surgical hospital with 250 seats, purulent surgery on 59 seats, oncology department with 26 beds, a laboratory and an operating unit, intensive care unit and intensive care hospital located on the base of the case.

Chief Doctor of the hospital said Alexander Maslagin conditions created for patients and staff facilities. "We go out on a completely different level and, figuratively

Continue reading A new building CRH Pavlovo in the Nizhny Novgorod region

In Surgut opened fitness center

On the territory of the Lyceum № 1 Surgut December 19-fabricated opened a modern sports complex. The building was built in 5.5 months.

In addition to the 1,130 students of the Lyceum № 1 in the new building will be able to engage in sports and other Surgut. The authorities have promised to have here the city circles and sections. The cost of construction amounted to 60 million rubles.

Photo

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’;
s.async = true;
s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

In Orel modernize the fire service

The town opened a new fire station building FC-1. The new building of the fire station was the fifth in a row, which is built in the Orel region in the last three years.

During the period from 2010 to 2012 Chief Technology Park Emergency Management Russia Orel and subordinated institutions added 59 units of new equipment, which was purchased by the federal and regional budgets.

Most of the received equipment is designed to equip fire departments field as well as regional search and rescue service. New equipment, equipped with all the necessary tools to enhance the readiness of the

Continue reading In Orel modernize the fire service

In Yekaterinburg, after the cap. Repair opened three kindergartens

At Thursday, December 20, 2012, in Yekaterinburg solemnly opened after a major renovation just three kindergartens.

First preschool educational institution number 202, located in a side street Suvorov, 21, will take 80 young citizens. The building built in 1960. Before the renovation, it was located in the HCS number 7 and the police station. Contractors went to the facility in early 2012, and for a short time led the kindergarten in order.

Second kindergarten number 246 is located on the boulevard of Culture, 7. The building built in 1958. Earlier, it also housed ZHKO and PSO. Now updated kindergarten

Continue reading In Yekaterinburg, after the cap. Repair opened three kindergartens

SQL - 6 | 2,999 сек. | 8.49 МБ