Calendar

Июль 2018
MTWTFSS
« Dec  
 1
2345678
9101112131415
16171819202122
23242526272829
3031 

In Yakutia running fiber optic length of about 1 thousand km

In the Republic of Yakutia (Sakha) launched the first in Yakutia area fiber-optic trunk "Tynda-Yakutsk" length of about one thousand kilometers and a capacity of 40 Gbit / s.

Highway built by "TransTeleKom" (TTC) under an agreement with the Government of the Republic of Sakha (Yakutia), signed in March 2012. Currently, the TTC is building broadband networks in Yakutsk and Neryungri. The first connection in these cities will be implemented in early 2013. Launched today, the backbone area will be the basis for the communication infrastructure as a service, and electronic gossuslug.

According to the President of TTK

Continue reading In Yakutia running fiber optic length of about 1 thousand km

The building compressor Novovoronezh NPP-2 started installation of equipment

Novovoronezh NPP-2 (general designer and general contractor — JSC "AEP" Moscow) started the installation of equipment in general compressor. The building has a compressor (area — about 1,500 square feet) is located pneumatic equipment with which the compressed air system will be provided by the auxiliary reactor building, building water treatment, etc. Also, before starting the unit with a compressor unit will be pnevmoispytaniya on the strength of the containment building reactor, during which the inside of the containment air pressure is generated four kilograms per square centimeter.In total, the building of general compressor specialists will assemble more than

Continue reading The building compressor Novovoronezh NPP-2 started installation of equipment

In Novosibirsk, a kindergarten The Mansion

Kindergarten № 451 "The Mansion" was built in 1983. In April 2012 it was decided to carry out repair work in the building as part of the departmental target program "Ensuring access to early childhood services in the city of Novosibirsk." In addition to reconstruction, the building was built on the third floor, and now instead of 180 kindergarten children can take 360. For the reconstruction of the kindergarten of urban and regional budget was sent to more than 150 million rubles.

This year, in the Novosibirsk region will be introduced 8200 places in kindergartens, 3,700 of them in the

Continue reading In Novosibirsk, a kindergarten The Mansion

In Petropavlovsk-Kamchatsky built the first home for young professionals

December 21, keys to new apartments in a new building for the youth got the first 13 young families Kamchatka. Doctors, cultural workers, teachers, social workers, athletes have become residents of a modern, comfortable apartments.

Total ownership of Kamchatka in the two houses for the youth purchased 100 apartments with a total area of more than 5 thousand square meters, which will be used as office accommodation for young professionals who need to improve their living conditions. Acquisition of property was part of the regional target program "Youth of Kamchatka 2010 — 2012 years."

The first stone of the new

Continue reading In Petropavlovsk-Kamchatsky built the first home for young professionals

In Voronezh, opened a factory for the production of building structures

December 19 in Voronezh industrial park "Maslowski" the launch of the first phase of production and logistics complex holding "Armax Group" — a factory for production of walling — modern wall and roof insulation panels. They are used for pre-fabricated buildings for industrial, civil and residential applications, as well as protective screens, roads and railways.

Construction of production and logistics center in the industrial park is being supported by the Government of the Voronezh region since 2009. The project is included in the program of socio-economic development of the region in 2010-2014. The aim of the project is

Continue reading In Voronezh, opened a factory for the production of building structures

In St. Petersburg, Children’s Hospital of osteoarticular tuberculosis received a new building

Dec. 18 in St. Petersburg opened a truly unique clinic, its basic function — helping sick children suffering from osteo-articular tuberculosis. Patients are willing to accept from today and from all over Russia.

Hospital before existed in the city, but the conditions in which doctors had to work, can not be called human. Vintage two-story mansion on the second Murinsky Avenue literally crumbling before our eyes, not to mention the fact that the medical equipment is hopelessly outdated.

The old building on 2nd Avenue Murinsky

For the first time the plight of the clinics started talking

Continue reading In St. Petersburg, Children’s Hospital of osteoarticular tuberculosis received a new building

In the Chelyabinsk region built AGROKHOLDING Ariant logistics terminal pork half-carcasses

Polyfloor performed high-Resuthane TG 69 floors in the building, "Logistic Terminal Pork side" Agroholding "Ariant"

In the Chelyabinsk region, LLC "Poliflor" has contributed to the construction of the largest in Europe, Russia and the meat processing plant. Agricultural holding "Ariant" in the village Fedorivka builds a high-tech meat processing plant. The principal activities of the company are the production, processing and marketing of agricultural products and food products. The Company’s range includes more than 150 kinds of high quality meat, sausage and delicatessen products produced from its own resources.

Poliflor company in July 2012 took part

Continue reading In the Chelyabinsk region built AGROKHOLDING Ariant logistics terminal pork half-carcasses

In Yekaterinburg opened its 334 th in a row kindergarten

In Yekaterinburg, after the reconstruction of a kindergarten number 408 has a capacity of 120 seats. Preschool building was built in 1965. Until 1998, it housed the Department of Education district administration of October. From 1998 to 2012 the building was occupied by a municipal institution "Center of Education number 190."

In January 2012, went on to contractors and 11 months completed redevelopment of the building, repaired the roof, facade, replaced windows and doors, completed building facing work. In addition, experts have replaced the power supply system, water supply, drainage, outdoor lighting and outdoor networks. It was purchased and

Continue reading In Yekaterinburg opened its 334 th in a row kindergarten

In Ugra built a new hospital, factory and housing

 

In Rainbow finally commissioned a new building of the hospital infection, which was built more than 10 years. During this time the design of the building several times because of faults corrected with financing, and was replaced by several contractors. However, the two-storey building of infectious department built with all the requirements of the medical institutions of this kind. Ward is designed for 40 people. With the move of the infectious department to a new building in the Rainbow solved the problem of housing for health professionals. Sergey Baskakov, the head of administration of the Rainbow:

Continue reading In Ugra built a new hospital, factory and housing

Kindergartens were opened in Petrozavodsk, Tomsk, Mari El and the Volgograd region

In Petrozavodsk, after the reconstruction of a kindergarten number 99. Directions in the "Blue Vazhenkov" were 260 children aged 2.5 to 3 years. Conversion of building an orphanage for preschool began in June of this year. All work took almost 77 million rubles.

Now in Petrozavodsk solved the problem of providing places for children who are 3 years old or more. In addition, a half months starting preschool on Green Street, and in June of the following year should be completed a new garden in the neighborhood Drevlyanka-8.

After a major renovation in the Volgograd region Surovikino opened kindergarten

Continue reading Kindergartens were opened in Petrozavodsk, Tomsk, Mari El and the Volgograd region

SQL - 6 | 3,992 сек. | 8.49 МБ