Calendar

Июль 2018
MTWTFSS
« Dec  
 1
2345678
9101112131415
16171819202122
23242526272829
3031 

In Ulyanovsk region are building pig

The village average Yakushka Novomalyklinsky district of Ulyanovsk region is building the third portion of the complex on 25,000 pigs.

The company will begin its work in the summer of 2013. It is planned that with the beginning of a new pig farm in the regional budget will come 8 million a year.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

At the National Student construction Pomerania construction crew came from across the country

In the village Bereznik Ustyansky District of the Arkhangelsk region gathered 125 men from St. Petersburg, Komi Republic, South Ossetia, the Perm Region, Arkhangelsk, Astrakhan, Sverdlovsk regions — a total of eight construction teams.

Another summary group "Arctic" of 20 students Safa and MSU began work on the construction of another object-Russia student construction "Pomorie" — Research Library NArFU them. MV University in Arkhangelsk.

Girls in Ustyanah will be mainly engaged in finishing work, and young people — the renovation of the premises in the village of College October, building enclosures for the animals, work

Continue reading At the National Student construction Pomerania construction crew came from across the country

Community center was opened in the village Aishevo resp.Tatarstan

The village Aishevo Aktanyshsky municipal district of Tajikistan opened a new building of the House of Culture. This facility, which is also referred to as a community center, gathered under one roof all socially significant facilities and services available in the locality: medical and health post, post office, library, place of district militia. Here is located directly to the House of Culture auditorium with 150 seats, as well as the office of the head of the rural settlement.

For Aishevo a population of less than 500 people, the opening of the community center — a very significant event. Previously,

Continue reading Community center was opened in the village Aishevo resp.Tatarstan

In p. Lipin Bor (Vologda region). Opened a kindergarten for 80 seats

June 29 in the village of Lipin Bor ceremony of putting into operation of a new kindergarten for 80 seats. Construction of prefabricated kindergarten through modular system completed of "SKDM" — the first in the Russian company, employing innovative block-modular technology for the construction of pre-school educational institutions. It allows you to build a kindergarten for 80, 120 or 160 people in a short time, in any climate and under any weather conditions.

The use of modern materials and lightly loaded the bases cheapen the cost of building a garden in comparison with the traditional capital construction techniques. The

Continue reading In p. Lipin Bor (Vologda region). Opened a kindergarten for 80 seats

On the Baltic nuclear power plant started to develop a pit for the unit number 2

On the construction of the first power of the Baltic NPP started the main period of construction of the "nuclear island". It works on the device facing the base plate of the reactor building at the level of 8.7 meters, the reinforcement of the walls of the building security and building management foundation plates and auxiliary building.

June 20 at the site of the Baltic nuclear plant began work on the formation of excavation for the construction of major buildings construction of the second unit. The depth of excavation of the future should reach 14 m, which

Continue reading On the Baltic nuclear power plant started to develop a pit for the unit number 2

The village Kostenkova (Kemerovo region). After the cap. Repair opened a kindergarten for 55 seats

To renovate the former building, LLC "Sibenergougol" and arrangement of the neighborhood from the municipal budget allocated 38 million rubles. In the new building appeared ten additional seats for children from 1.5 to seven years (now it will be 55 seats). This will satisfy the needs of the residents of the village Kostenkova. In addition, in the 2012-13 school year in the children‘s garden will be organized by a group of pre-school education for children living in remote Indigenous communities Kostenki rural areas. Construction work is performed with the use of modern materials and technology. There are all conditions

Continue reading The village Kostenkova (Kemerovo region). After the cap. Repair opened a kindergarten for 55 seats

In Tyumen, opened a factory for the production of magnesium cement

In Tyumen, opened a unique plant — production magnesia cement and building materials from metallurgical wastes. Author and developer of ideas — a resident of the Tyumen Technopark Sergey Workshops.Innovative Product of the company — magnesia binder. This component is an alternative to cement and other building materials.

In particular, the waste from steel production with the addition of various elements and magnesia binder, a mixture that becomes the basis for the floors, panels, sheets and artificial stone. The material has a high thermal and sound insulation, does not burn and does not pass water. The cost of

Continue reading In Tyumen, opened a factory for the production of magnesium cement

In p. Ilyinka (Khabarovsk Territory) after the cap. repair clinic opened

July 3 was the opening ceremony of the updated medical ambulance, sad dilapidated building was transformed into a modern, light and airy room. And the neighborhood ennoble not forgotten. Housewarming villagers waited for a long time: overhaul of the building did not do more than 25 years, and redecorating a quarter of a century spent only once. Patients crowded into a narrow dark hallways, in doctors’ offices had the old furniture.

Of the original building, in fact, not a trace remained. First, the appearance has changed dramatically — updated roof, facade, windows and doors replaced, repaired porch, built

Continue reading In p. Ilyinka (Khabarovsk Territory) after the cap. repair clinic opened

Refurbished opened a kindergarten in the village of Big Yards Moscow region

In the working village of Big Yards Pavlovsky Posad district opened a renovated kindergarten number 24 "Gingerbread Man".

The building and all utility systems are fully updated. In addition, the landscaped area adjacent to Sadiku, organized entrances to the building, prepared by a comfortable pram playground.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’; var h = d[g](‘body’)[0]; h.appendChild(s); } })(window, document);

Eye Microsurgery Center of Ulyanovsk bureau opened in a new building

Eye Microsurgery Center of Ulyanovsk Oblast Hospital moved into a three-story surgical building Departmental hospital at the station. Ulyanovsk JSC "Russian Railways".

Now the total area is 830.61 m2 of offices. On the ground floor there is a laser and glaucoma centers, two diagnostic study, study ultrasound, emergency operating room, training room chair USU. On the third floor is a round the clock hospital ophthalmology department with 60 beds.

The building, which so far is the center, is in poor condition and can not be restored.

In order to further separation of Eye Microsurgery in the

Continue reading Eye Microsurgery Center of Ulyanovsk bureau opened in a new building

SQL - 6 | 2,810 сек. | 8.46 МБ