Calendar

Июль 2018
MTWTFSS
« Dec  
 1
2345678
9101112131415
16171819202122
23242526272829
3031 

Views of Kazan from a height. Summer 2012

Photo report of Fame Stepanova

Kazan — the capital of the Republic of Tatarstan, a population of 1.2 million people. The city is situated on the left bank of the Volga River, at the confluence of the rivers Kazanki. In 2005 was celebrated the millennium of Kazan. In 2013, Kazan will host XXVII World Summer Universiade in 2015 — World Aquatics Championships.

Center of KazanArea Tukaya

New Savinovsky areaRiver Kazanka

Nikolai Yershov street, passing in the street of Karl Marx

Kazan Kremlin

Left Theater. The Kamal, center, Tatar State University of

Continue reading Views of Kazan from a height. Summer 2012

The renovation of the hospital to hospital. Wasp Irkutsk region.

To receive its first patients preparing an updated medical hospital Osinski central district bolnitsy.Bez overhaul of the building were about thirty years old and decayed order. Reconstruction carried out in the framework of the regional healthcare modernization program. At it from the federal and regional budgets were sent 34 million rubles.

Modern materials, complete replacement of communications, updated furniture and fixtures. For the convenience of doctors and patients — sensory doors and elevators. The hospital is designed for 60 beds. In the year here will be able to accept up to 2,500 patients. The new building will be provided to

Continue reading The renovation of the hospital to hospital. Wasp Irkutsk region.

In Samara opened after reconstruction kindergarten number 30

June 9, at the Kirov district of Samara opened after reconstruction kindergarten number 30 "Classics". The building was constructed in 1975 in a long time, it housed a kindergarten for 230 places. Since 1993, however, he was not functioning, and the premises leased.

For the reconstruction of the building, which has become a large-scale as new construction, equipping, bringing order to the neighborhood sent 140 million rubles from the city and regional budgets.

In pre-school education to have returned in the past year. At that time, there were no windows, and the premises were littered with debris.

Continue reading In Samara opened after reconstruction kindergarten number 30

Red Sormovo deposited fourth in this year’s tanker RST27

June 9, 2012 Shipping Company "VFTanker" (Managing Director Sergey Bryzgalov) took fourth in the operation of the project RST27 serial tanker with a deadweight in the sea / river 7022/5420 tons of "VF Tanker — 4" (building number 02004).

Works — builder — "Plant" Red Sormovo "(General Director Nikolai Zharkov, the plant is included in the JSC" United Shipbuilding Corporation "). Whole Plant to be built ten tankers project RST27. Judging by the pace of work, the Red Sormovo pass the entire series this year (contract — five in 2012, five — in 2013). Company "VFTanker" is a holding

Continue reading Red Sormovo deposited fourth in this year’s tanker RST27

A day in the life of the central office of Gazprom

In early April, I was filming a report from the central office "Gazprom" for their website. The official version is lined with 129 photographs they, and here I will show you a short with his comments.

8:34. Spring is in full swing — April 3, and in the street of zero degrees and a cold breeze. Employees of companies are rushing to their offices through a central checkpoint.

8:55. Near the conference hall constantly copyrights held exhibitions of paintings and other art.

8:57. Workplace engineer conference room.

9:04. This person manages the screen in the lobby. But the most important

Continue reading A day in the life of the central office of Gazprom

In Malaya Serva (Perm region) has opened a dairy farm

Dairy farm with 192 head of cattle M. Servais was built in just one year. Area of the building is more than 1,500 square meters, the walls and ceiling of the barn made of composite panels and metaloprofilya.

And the milk tank — cooler for 5 cubic meters purchased and installed by specialists of the company, "DeLaval". The building is almost all mechanized for livestock have rest rooms and showers. The project cost is 20 million rubles, of which 30% — own funds SKHPK "Russia."

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var

Continue reading In Malaya Serva (Perm region) has opened a dairy farm

In the region of Buryatia Khorinsky opened the new building of the kindergarten

In Tegda Horinsky Ulus district inaugurated the third building of the kindergarten "Squirrel", which will take 40 young people in Ulus.

The new building capacity for the two age groups. For each of them equipped with private gaming rooms, spacious bedrooms, bathrooms and showers. Gambling halls are equipped with a special coating with floor heating and a full set of equipment for the development of cognitive abilities of children. Until that time, Ulus Tegda felt a great need for additional space for preschool children.

According to the head Tegdinskim kindergarten "Squirrel" LN Lineytsevoy, about 180 children registered

Continue reading In the region of Buryatia Khorinsky opened the new building of the kindergarten

In the capital of BAM started the resettlement of slum dwellings

In Tynda (Amur region). Fully completed the construction of 32 apartment buildings, builders are busy landscaping of adjacent territory. Now the paperwork is completed, it is expected that the residents will be able to move into their new apartment in July.

Delivery of a seven-story building, located at the address. Upper Quay, is scheduled for August of this year. This home is currently connected to the heat -, water -, electro — and sewage networks. Besides mounted lift and laid roof. Builders are busy in finishing and improvement works.

Large-scale construction of housing estate is on the construction site neighborhood

Continue reading In the capital of BAM started the resettlement of slum dwellings

Construction of a new power unit at Kola nuclear power plant (Sverdlovsk region.) Is a unique method

Installation of reactor internals is made simultaneously with the construction of the walls of the reactor compartment. Currently, building construction reactor compartment reached the level of 45 meters. Submit a construction site, free of dirt and dust is difficult, but within the structure set up so-called free area.

The first new energy unit are scheduled to be reached at the beginning of 2014.

BN-800

— The reactor vessel is already installed. And around it mounted a temporary dome, which is free from dust, but has heating, ventilation, and is constantly cleaning. It also let down by

Continue reading Construction of a new power unit at Kola nuclear power plant (Sverdlovsk region.) Is a unique method

In Dolgoprudnyi (Moscow region). Opened a children’s clinic

June 1st in Dolgoprudnom opened a new building Urban children‘s clinic number 1.

The building has an area of 1,200 square meters will accommodate more than 48 offices of pediatricians, specialists and clinical diagnostic laboratory. They occupied all three floors and the basement housed the administrative and utility rooms and a conference room. In the coming days, their jobs here will take more than thirty physicians. It should be noted that the equipment that is equipped with a new health center, meets all modern requirements. In particular, the state of the art classrooms equipped with an ophthalmologist, surgeon

Continue reading In Dolgoprudnyi (Moscow region). Opened a children’s clinic

SQL - 6 | 3,178 сек. | 8.48 МБ