In Dolgoprudnyi (Moscow region). Opened a children’s clinic

June 1st in Dolgoprudnom opened a new building Urban children‘s clinic number 1.

The building has an area of 1,200 square meters will accommodate more than 48 offices of pediatricians, specialists and clinical diagnostic laboratory. They occupied all three floors and the basement housed the administrative and utility rooms and a conference room. In the coming days, their jobs here will take more than thirty physicians. It should be noted that the equipment that is equipped with a new health center, meets all modern requirements. In particular, the state of the art classrooms equipped with an ophthalmologist, surgeon

Continue reading In Dolgoprudnyi (Moscow region). Opened a children’s clinic

In the Kursk region are building a new production facility

Belgorod company "Union of Oil & Gas" is building in the village of Diet Manturovsky Kursk region set for solvents. Total cost of the project is 1.1 billion rubles.

The first phase of the enterprise is planned for the fourth quarter of this year, the second — in the next, the third — in 2014.

Complex with a capacity of 75 thousand tons (with the prospect of increasing to 150,000 tonnes per year) is designed to produce solvents from hydrocarbons by clearly fractionation.

Starting a new business will provide jobs for 250 residents of the village, give impetus to

Continue reading In the Kursk region are building a new production facility

Ishim

Ishim — a city in the south of the Tyumen region, the regional center. Located on the left bank of the Ishim River (a tributary of the Irtysh). Population — about 65,000 people.Founded in 1687 under the name of settlement Korkina exactly 100 years after the laying of Tobolsk. Beginning in 1721 in the settlement was carried out regularly Nicholas Fair. In 1782, by decree of Catherine II Korkin suburb gets the name of the Ishim (named after the river) and the status of the city.

December 30, 2011 at Railway Square appeared a memorial

Continue reading Ishim

In the village. Verhnekalinovsky (Astrakhan region) has opened a kindergarten for 60 seats

May 30 in the village of Verhnekalinovsky opened a new kindergarten "little flowers — Semicvetik."

Earlier garden located in an old building that was in disrepair. In 2011 it was decided to reconstruct the premises of the former school workshops and resettle there preschool. And in February 2012, began repair work. Their execution of the budget was directed seven and a half million rubles.

Kindergarten is designed for 60 students, this three groups, as in the old garden had only 20 seats. Kindergarten building meets the new requirements of the sanitary norms: the bedrooms, a music room, a group,

Continue reading In the village. Verhnekalinovsky (Astrakhan region) has opened a kindergarten for 60 seats

In Rybinsk (Yaroslavl region). After the cap. Repair opened kindergarten

1 June a kindergarten compensating type number 13. The building, built in 1936, is located in the center of Rybinsk. A few months in the building carried out a full overhaul: Replaced roof, facade, easting, updated and became very bright facade, landscaped grounds, in groups, a new furniture and toys. All of this has been spent almost 24 million rubles.

Kindergarten number 13 — the only one in the Yaroslavl region working with children with severe speech disorders. The kids who attend this kindergarten, special needs, so each of the four groups of ten students.

Continue reading In Rybinsk (Yaroslavl region). After the cap. Repair opened kindergarten

In Sochi started a new hospital for infectious diseases

June 1 hospital employees have taken up a job. The first patient enrolled in the "First aid" in two hours. Total for the day in the new hospital have turned 12.

Construction of infectious hospital number 2 in the village of Dagomis was part of the regional target program for the development of Sochi as a mountain resort and spa.

The hospital covers an area of 7.8 hectares. It consists of 11 buildings, seven of them — healing by 300 beds: 150 adults and 150 children. Each building is designed for a single group of

Continue reading In Sochi started a new hospital for infectious diseases

In Sarov (Nizhny Novgorod region). Restored temple Zosima and Savvatii

Temple Zosima and Savvatii before the revolution

May 26 grand opening of the restored Church of St. Zosima and Savvaty.

Recovery plans were announced in the winter of 2008, the fall of 2009 was conducted controlled collapse Old Soviet building, it was finally demolished By February 2010, the spring was approved reconstruction plan (it was assumed that the temple will stand in six months), in the same year was laid the foundation, in the summer of 2011, the church of the saints Zosima and was Savvatii set dome with a cross.

The history of the monastery of Sarov says

Continue reading In Sarov (Nizhny Novgorod region). Restored temple Zosima and Savvatii

Ural Locomotives began construction of a new production facility

LLC "Ural Locomotives" (Upper Pyshma, Sverdlovsk region) has started laying the foundations of a new production facility for the production of electric type Desiro RUS («Swallow").

Was previously carried out a wide range of works on site preparation on the premises. MOVED about 1.5 kilometers of communications within the area of construction, dismantled the old buildings. Designed excavation for foundation of the future plant, a total of exported about 200 thousand cubic meters of soil.

The future production facility will be built on pile foundations. The decision was made chief designer of "Transmashproekt" on the basis of calculations made.

Continue reading Ural Locomotives began construction of a new production facility

Ural Locomotives began construction of a new production facility

LLC "Ural Locomotives" (Upper Pyshma, Sverdlovsk region) has started laying the foundations of a new production facility for the production of electric type Desiro RUS («Swallow").

Was previously carried out a wide range of works on site preparation on the premises. MOVED about 1.5 kilometers of communications within the area of construction, dismantled the old buildings. Designed excavation for foundation of the future plant, a total of exported about 200 thousand cubic meters of soil.

The future production facility will be built on pile foundations. The decision was made chief designer of "Transmashproekt" on the basis of calculations made.

Continue reading Ural Locomotives began construction of a new production facility

In the capital of Ingushetia, opened the first kindergarten

Today in Magas opening of a kindergarten, designed for 75 people.

The facility, built in the third district of the capital. This two-story building with a large basement, the ground floor will house all of the technical rooms, washing and ironing. On the first and second floors of the building are rooms, game rooms, music room. The interior walls of the building are painted based on various fairy tales, all the modern, and comfortable furniture. At the rear of the yard built a swimming pool, also in the yard of a kindergarten and a playground where to set the slides,

Continue reading In the capital of Ingushetia, opened the first kindergarten

SQL - 16 | 3,949 сек. | 7.3 МБ