The roof of the Bolshoi Theatre is protected from icing system Teploskat

Engineering company "SSTenergomontazh" carried out an installation of electrical heating of the roof and gutters of the main building of the Bolshoi Theater and the House SA Homjakova.

Restoration and reconstruction of the main building of the Bolshoi Theatre, which lasted six years, has become a colossal world-class project. The theater building has long been accepted as one of the symbols of Russia. The reconstruction project involved a scientific restoration of the theater and the audience’s pivotal stage of the reconstruction with the deepening of underground space. This work should be preserved historic character of the building

Continue reading The roof of the Bolshoi Theatre is protected from icing system Teploskat

Novovoronezh NPP-2 completed assembly building blocks of the dome of the building unit number 1

At the construction site of Novovoronezh NPP-2 (general designer and general contractor — JSC "AEP") completed assembly of metal domes inside the reactor containment building unit number 1.

Pre-assembled before further installation of metal structures on a regular place to ensure a high quality of works.

Installation of the dome, which weighs more than 400 tons, is scheduled for the second quarter of this year. Steel structures will be installed in two phases — the sixth tier (with a mark of 44.1 to reach 51.7 meters) and seventh-eighth floor (with a mark of 51.7 to 61.7 meters).

Containment

Continue reading Novovoronezh NPP-2 completed assembly building blocks of the dome of the building unit number 1

The new building of the puppet theater opened in Kazan

Construction of the new theater building "Ekiyat" began in October 2008. The cost of the building amounted to 1.3 billion rubles was allocated from the budget of Tatarstan.

The building is reminiscent of a fairytale castle, there are two halls — for 258 and 100 people — children‘s cafe, play area. First get their own site Russian and Tatar theater troupe "Ekiyat." In addition to the theater in the building will house a children’s center "Ekiyat." This will move a small academy of arts and Kazan Art School.

At the Great Hall of the puppet theater, the first performance

Continue reading The new building of the puppet theater opened in Kazan

In the village. Nizhny Odes (Rep. Komi) Refurbished opened clinic

In Nizhny Odes opening ceremony of the renovated building clinics. Overhaul nizhneodeskoy district hospital number 1 lasted for several years. The total amount of funds spent more than 20 million rubles.

As part of the municipality of social cooperation with the oil company Lukoil fully renovated three-storey clinic, replaced the roof of the building, restored hot water system inpatient hospital renovated catering department in a hospital acquired modern medical equipment.

The new clinic will open in the villages of Nenets Autonomous Okrug

In the eastern district town on the coast of the Kara Sea has opened a new health care facility. Earlier clinic was located in an area of 100 square meters. The new one-story building in the wooden performance — is 640 square meters, on which the specialists’ offices, pharmacy, laboratory. For almost 700 residents of Ust-Kara is a good gift in the Year of Health, announced in the Nenets Autonomous District in 2012.

— This is not the first such facility built recently in the area, — commented on the event Deputy Chief of Staff for Social Affairs NAO Olga

Continue reading The new clinic will open in the villages of Nenets Autonomous Okrug

In Perm, completed the construction of a new building of Pediatric Surgery

Construction of the new building of pediatric surgery in Perm completed. The process of acceptance.

The new six-story housing Pediatric Surgery urban children’s hospital number 15 has 250 beds. It will be provided surgical care for the young people of Perm and the Perm region. Last childrens hospital of this magnitude were erected in Perm about 30 years ago.

The new building has two elevators installed, built an underground passage to the adjacent housing. Thus, children who are in it for the treatment can be quickly delivered to the examination or surgery. The clinic is equipped with modern appliances, medical

Continue reading In Perm, completed the construction of a new building of Pediatric Surgery

In the village. Birch (Kemerovo region) has opened a new outpatient clinic

In August last year, in celebration of 385th anniversary of the village was flooded with a symbolic pile construction began in the autumn. And today the grand event — launched a new clinic. Until that day health facility housed in adapted premises, built 60 years ago. The seats are not enough for either patients or for doctors. It was decided to construct a new building with an area of 300 sq.m. For the construction and equipment clinics aimed 12.3 million rub. The new building meets all modern requirements and standards. Separate rooms: a pediatrician, internist, gynecologist, functional diagnostics, which

Continue reading In the village. Birch (Kemerovo region) has opened a new outpatient clinic

Ivanovo region: the clinic number 3 Vichugskaya CRH delivered modern equipment

Polyclinic № 3 Vichugskaya central hospital serves more than 11,000 people. The building houses a branch clinic number 3 children’s clinic, where are receiving 2 pediatrician, fixed in 1614 children.

In the framework of the modernization of health care Ivanovo region underwent a major renovation of the building cost 21.2 million rubles, and put a new and modern equipment worth 16.3 million rubles:

X-ray machine is stationary on 3 workstations, a system for digitizing film images for mammography and ultrasound scanner is stationary with color Doppler echocardiography. In addition, the modern system of fire safety, purchased new furniture,

Continue reading Ivanovo region: the clinic number 3 Vichugskaya CRH delivered modern equipment

In Wagga (Tyumen region) opened the new House of Culture

The new House of Culture are placed: a dance hall, classrooms for lessons in circles, an auditorium with 500 seats, which is several times more than in the same building. It should be noted that the construction of the House of Culture in Wagga began in 2008. The former was located in a wooden building, built in the first half of the last century, and no longer meet modern requirements.

Area of the new two-storey building is nearly 5,000 square meters. m There are 20 creative teams to work — only 437 people between the ages of 5 to 75

Continue reading In Wagga (Tyumen region) opened the new House of Culture

In Orenburg after reconstruction opened a kindergarten for 115 places

In the industrial area of Orenburg after reconstruction of a kindergarten number 49 on the street. Kaliningrad, 17. Since 1998, the kindergarten building was not used for its intended purpose. In 2010 the building was returned to the pre-school education and delivered for reconstruction.

In preschool educational institution 6 group rooms equipped with modern facilities: musical-equipped gym with new equipment and supplies, catering department meets the highest standards, a medical unit. Playgrounds installed safely and multifunction devices.

The costs of the city’s budget for the object accounted for 32 million rubles. Kindergarten is designed for 115 seats.

Continue reading In Orenburg after reconstruction opened a kindergarten for 115 places

SQL - 17 | 0,936 сек. | 7.74 МБ