Regular supply of KrAZ-7140H6 in Azerbaijan

Last week, "KrAZ" made a shipment to Azerbaijan next batch of KrAZ vehicles custom of "Azneftemash" ."Azneftemash" — one of the leaders in Azerbaijan manufacturers of various oil and gas equipment, lifting devices, special equipment and tools for the oil and gas industry, long-term partner of PJSC "KrAZ".

Shipped cars — four-axle chassis KrAZ-7140H6 wheel formula 8×6 carrying capacity of 30 tons, equipped with 400-horsepower engine JAMZ Yaroslavl-6581.10 (Euro 3)

Will be installed on the chassis of heavy lifting equipment UP-80/UP-100 "Ruslan", intended for maintenance and major repairs of oil and gas wells to 5000

Continue reading Regular supply of KrAZ-7140H6 in Azerbaijan

A new terminal of the airport Kiev

May 17 opening of the international terminal of the airport "Kiev". The total cost of the new international terminal at the airport "Kiev" was 340 million USD. This was stated by Director of "MasterAvia" Alex Yakovets. "The total investment is about 400 million USD. Estimated cost of the terminal, the improvement of the neighborhood, boiler and internal networks — 340 million USD., And about 60 million USD worth arrangement for aircraft parking apron type Boeing-737" — said Yakovets. We note, today is the opening of the international terminal. Of the 14 thousand square meters. of the total area of

Continue reading A new terminal of the airport Kiev

A new container terminal in the Moscow region

In the Moscow region have commissioned a new container terminal — LLC "Container Terminal Orekhovo-'. Terminal capacity of 2.3 million TEU, a design capacity — 120 TEU per year, reported the press service of the operating company.

At the moment, only completed the first phase of the project. The present paper introduces a container platform number 1, 2 hectares, the capacity of 1,300 TEU, sockets for connection of refrigerated containers 60., Front discharge of 1100 m (one-time processing of SAR 71 USD), handling equipment — 2 reachstacker carrying capacity of 45 tons, 2 front stacker for empty containers. Construction of

Continue reading A new container terminal in the Moscow region

Selhozmashinostroiteli increasing domestic production capacity

JSC "Rosagroleasing" interacts effectively with domestic producers of agricultural machinery in the large-scale program of technical and technological modernization of agriculture.

Through close cooperation with "Rosagroleasing" under the Program update the machine and tractor farms expand production capacity of manufacturers.

For instance, JSC "Petersburg Tractor Plant" successfully completed the first half of this year, increasing the volume of products sold and issued by 82%. Labour productivity increased by 100% and the number of jobs — 20%. This result is now largely achieved through active participation in the program implemented by the update.

Total program updates for six months to agricultural

Continue reading Selhozmashinostroiteli increasing domestic production capacity

Shipping on the third turn Yurkharovskoye fishing

PJSC «Sumy Frunze NPO" has started shipping the equipment to Yurkharovskoye oil and gas field, which is operated by a subsidiary of "NOVATEK" — "NOVATEK-Yurkharovneftegaz." 

In general, under this contract Sumy machine builders need to put 5 of complete pumping units (GPU) with a unit capacity of 25 MW in individual shelters. The equipment used high-yielding six-speed centrifugal compressors with plain bearings and seals with face gazodinamicheskimi production brand FRUNZE.

In addition, the order allows the chassis 7 sets of replaceable flow parts previously supplied aggregates.

"For the third consecutive year, our

Continue reading Shipping on the third turn Yurkharovskoye fishing

Expert: 50 wind farms can be built in Russia in the coming years

About fifty wind turbines with a total capacity of up to 5 GW can be built in Russia in the coming years, the vice-president of the Russian Association of Wind Power Industry (RVCA) Anatoly Kopylov.

"The total number of development companies that are working on the construction of wind farms in various stages of readiness, today 13 sites for future wind farms today almost fifty, the total capacity of the projects that the developers are approaching the 5 thousand MW," — said Kopylov RIA Novosti on the sidelines of a round table on renewable energy, which held the Friedrich Ebert

Continue reading Expert: 50 wind farms can be built in Russia in the coming years

USC has formed a portfolio to 1 trillion rubles

United Shipbuilding Corporation (USC) has received orders for the $ 1 trillion rubles, while 200 billion rubles will be allocated for the production of civil vessels, the chief of the department of civil shipbuilding USC Dmitry Sapov speaking at the plenary session of the 4th World Maritime Technology Conference.

She began work on Tuesday in St. Petersburg, gathering experts of world maritime community, scientists, shipbuilders, makers of components of systems and equipment from 20 countries, reports ITAR-TASS.

"The Corporation, now consisting of 45 companies, 14 bureaus, research institutes, design bureaus, implements production concept with the" Maritime Strategy of

Continue reading USC has formed a portfolio to 1 trillion rubles

USC and Rosmorport entered into contracts for the construction of four icebreakers

JSC "United Shipbuilding Corporation" (USC) and the Federal State Unitary Enterprise (FSUE) "Rosmorport" signed a contract to build four icebreakers worth a total of 19.5 billion rubles. The customer is the Ministry of Transport (MoT).

 Photo source:svali.ru

In particular, the parties have signed the contract for the construction of an icebreaker capacity of 25 MW with an expiration date of construction in October 2015. The contract amount — 7.5 billion rubles. Also signed three contracts for the construction of icebreakers capacity of 16 MW with an expiration date in May, August and October 2015. The amount of each contract

Continue reading USC and Rosmorport entered into contracts for the construction of four icebreakers

LTD MH Tonar (Moscow region). Developed dumper

This year, the Ministry of Health, LLC "Tonar" developed dumper TONAR-4525 End Dump

 

Brief specifications

Body capacity — 25 cubic meters Load capacity — 45 t Net weight — 22 t Engine WEICHAI WD 12.375 Engine output 375 hp The maximum torque of 1500 Nm Transmission 9JSD180 9 forward, 1 — back. Wheelbase 1450 mm 3650 + 6×4 14R24 tires The front bar HANDLE 13T Rear Axle HANDLE 25T Manual Transmission The gear ratio rear axle 12.87 The maximum speed of 41 km /

Continue reading LTD MH Tonar (Moscow region). Developed dumper

Omsk Electromechanical Works has invested in the modernization of its more than 180 million rubles

OJSC "Omsk Electromechanical Plant" specializes in the manufacture of steel structures, steel structures of power transmission poles, floodlight towers, antenna towers, equipment for energy industry and the oil and gas industry.

The Omsk Electromechanical Plant is completed the next stage of deep modernization of production facilities. In the period from 2009 to 2011 in the re-equipment of enterprises have invested more than 180 million rubles.

The plant was equipped with modern metalworking equipment of world leaders: a line for processing metal corner Vernet Behringer, shot-blasting plant Rosier, thermal cutting machine MG 6001.20 PGB.

In addition,

Continue reading Omsk Electromechanical Works has invested in the modernization of its more than 180 million rubles

SQL - 16 | 1,208 сек. | 7.29 МБ