Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

The village Belogorsch (Bryansk region). Opened Children’s Creativity Center

In the small village of Belogorsch, with fewer than 100 employees, opened a Center for children’s creativity. Construction of the center took a little less than a year. Here are equipped classrooms for dance and rhythm, workshop, assembly hall.

Now kids from three neighboring villages — Pysarivka, Pavlivka, Rassuha — will be trained here music, dance and arts and crafts. Work in the center of a speech therapist and a psychologist.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true;
s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

In Biysk Altai construction of energy-efficient block

Energy-efficient layout quarter

In Biysk Altai construction of energy-efficient district in the framework of the regional targeted program to resettle people from emergency housing fund financed with the participation of the Fund of assistance to reforming housing and communal services.

All of the building of a new residential complex will be energy efficiency class "A". In new buildings provides for efficient forced-air ventilation with mechanical drive and installing heat recovery systems.

Heating homes will be highly efficient with low water temperature. Indoor climate system is provided with the ability to control the temperature and humidity of the air and

Continue reading In Biysk Altai construction of energy-efficient block

In the Novosibirsk Technopark opened student lab

In Academpark starts independent universal physical-chemical laboratory, ready to tackle a wide range of applied research and policy analysis tasks under the order. "Akademlab" located in the center of prototyping, has become another necessary for innovative companies part of the technological infrastructure of Novosibirsk Technopark.

Her conception of the work was presented to the public as part of the project "Science Café" Eureka "," the site says Academpark.

The laboratory is ready to provide services for the study of the chemical composition of gases, liquids, solids and impurities in them. Also, "non-classical" services — to analyze, explore the

Continue reading In the Novosibirsk Technopark opened student lab

In the village of Pereyaslavka Khabarovsk Krai stadium opened after reconstruction

Stadium was built in 1985. The adjacent building houses the recreational and educational center "Sparta". It involved about 600 children and about as many adults. At the heart of "Sparta" organized classes in 12 sports: karate, basketball, shooting, sports tourism, football, hockey, bodybuilding, athletics, chess, boxing, volleyball, taekwondo. The children and adults are 16 professional trainers.

The estimated cost of reconstruction of the facility amounted to 31.5 million rubles. 20 million allocated regional budget. The rest — the means of regional and municipal authorities. Center for "Sparta" received sports equipment worth 11.8 million rubles. Equipped with a gym, a fitness

Continue reading In the village of Pereyaslavka Khabarovsk Krai stadium opened after reconstruction

New medical facilities built in Krasnoyarsk

May 4 Krasnoyarsk Territory Governor Lev Kuznetsov once again visited the construction sites Center for Positron Emission Tomography (PET Center), Department of radionuclide therapy and four additional buildings of the Krasnoyarsk Regional Oncology Center in Krasnoyarsk.

General Director of Clinical Center of the Siberian FMBA Boris Barankin introduced to Leo Kuznetsov model of future PET Center and Department of radionuclide therapy. The work is going well according to plan, Center will receive its first patients in December this year, Although construction began in February.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc,

Continue reading New medical facilities built in Krasnoyarsk

In St. Petersburg State University opened the Center of genomic bioinformatics

In St. Petersburg State University opened the Center of genomic bioinformatics them. Professor FG Dobrzhansky.

Genomic bioinformatics center will be a platform for topical interdisciplinary research in the field of bioinformatics, genomics, and molecular biology. This work will bring together professionals in many fields — genetics, computer scientists, mathematicians, of different generations, will work both students and post-graduates, and PhDs and doctors, world-renowned scientists from different countries.

Major projects of the Center:The discovery of new human genes. The main purpose — to detect genes of resistance or susceptibility to HIV / AIDS, hepatitis and cancer. Bioinformatic computer algorithms will facilitate

Continue reading In St. Petersburg State University opened the Center of genomic bioinformatics

Report / Yekaterinburg aerial (Spring 2012)

Ekaterinburg — the fourth largest population (after Moscow, St. Petersburg and Novosibirsk) city in Russia — 1.35 million. Thermal Springs, cultural, scientific and educational center of the Ural region, endowed with the status of the center of the Urals Federal District ("the capital of the Urals").

The metro station "Ural". PRIVOKZALNAYA quarters.

City Hall on the square in 1905.

Sverdlov Street

BC "The Summit"

The future presidential center "Demidov"

Karl Liebknecht Street

Multifunctional high-rise complex "Vysotsky".

The first skyscraper in Yekaterinburg — 48

Continue reading Report / Yekaterinburg aerial (Spring 2012)

In Moscow, opened electrosubstation Abramovo and Technology Center Network

Moscow Mayor Sergei Sobyanin, May 3 started a electrical substation "Abramovo" and the Center for Technological Network in the Eastern Administrative District of Moscow.

Abramovo "and the Center for Technological Network JSC" United Energy Company "was commissioned in 2012 at the District passage, ow. 6 HLW.

Construction of facilities was carried out by the investor — of "HST". The cost of building the substation was 7.5 billion rubles TSTUS — 1.5 billion rubles. Technical customer is the Open Society "Moskapstroy", and as a general contractor — JSC "PC" Termoservice. "

As reported to the

Continue reading In Moscow, opened electrosubstation Abramovo and Technology Center Network

The leader of the built-TOWER — the first skyscraper in St. Petersburg (text + many PHOTOS)

In early May, was completed exterior finish first in St. Petersburg and the northernmost in the world skyscraper, its height was 145 meters, 44 floors vutri (2-technical). At last prislavuty zoning laws breached! Let’s see what happened at Petersburg skyscraper builders.

High history

We have the opportunity to witness the landmark event in the history of our city by the end of the year will be completed ambitious project Leader Tower. This building has already entered the history of St. Petersburg as the city’s first skyscraper, the reality is a new stage in the development of the

Continue reading The leader of the built-TOWER — the first skyscraper in St. Petersburg (text + many PHOTOS)

Russian Navy: more than two thousand soldiers will be trained on the survival rates

For military personnel, military service under the contract, based on the 242 training center (for junior professionals) Airborne (Omsk) from May 2012 to January 2013 organized training program of intensive military training. The so-called "survival courses" are designed for one and a half months, and held under a single training programs developed by the Department of Defense.

The main emphasis is on instilling students with skills that will enable them to skillfully operate in extreme conditions, emerging victorious in the most difficult situations that arise in a collision with an opponent. Management reports the press service

Continue reading Russian Navy: more than two thousand soldiers will be trained on the survival rates

SQL - 6 | 0,809 сек. | 8.48 МБ