Throughput of the port of Vysotsk in January-March rose by 15% to 3.7 million

tons

Throughput of the port of Vysotsk made in January-March 2013 3,723,000 tons, up 15% from the same period in 2012. This was reported in the media Seaport Authority "Big Port of St. Petersburg", the area of responsibility that includes the Vysotsk.

 Thus the volume of oil products increase compared to January-March last year by 4% and amounted to 2.706 million tons, the volume of coal and coke increased by 60% to 1.017 million tons. Throughput of the port of Vysotsk in March was 1,301,000 tonnes (an increase of 21% compared to March 2012), including the port

Continue reading Throughput of the port of Vysotsk in January-March rose by 15% to 3.7 million

110th anniversary of the first plant in Russia White Coal was celebrated in Yessentuki

In Essentuky held celebrations to mark the anniversary launch HPP "White Coal". The festival organizers made the administration of the city.

All residents were invited to the first hydroelectric plant in Russia "White Coal", which is on the branch of JSC "MRSC of North Caucasus" — "Stavropol" and declared a World Heritage Site. Today is a museum, which in 1997 received the status of the memorial. The Mayor of Larissa Pisarenko in his greeting drew attention to the fact that today’s holiday — this is only part of the planned commemorative events, prepared in honor of

Continue reading 110th anniversary of the first plant in Russia White Coal was celebrated in Yessentuki

Intaugol purchase equipment for 856 million rubles

"Mine" Intaugol "(Komi Republic) has signed a contract with JSC" Stark "to supply equipment worth 856 million rubles, the press service of the company. According to the agreement, by 2014 the mine will face conveyor, hydraulic power for the complex KM-700, the pilot control system, roadheader, 70 roof supports for cutting the 300-meter lava and shearer KSW-460. Purchase of the equipment will allow the company to increase production by 30% — from 2.7 million tons of coal in 2013 to 3.5 million tons in 2015. The penetration will increase to 8 km of mine workings. "The modernization of

Continue reading Intaugol purchase equipment for 856 million rubles

Cargo turnover at the port of East Primorye in March exceeded 1.7 million tons

According to the operative data of "East Port" (Primorsky Krai) for January — March 2013 stevedoring company was handled 4 million 314.4 thousand tons of cargo, which is 2% higher than the results of the same period in 2012. In March, the company has passed through the piers 1 million 722.3 thousand tons of cargo. Compared to last year, growth — 8.8%.

"The first quarter of 2013 shows a positive trend turnover — said the managing director of" East Port "Anatoly Lazarev. — Systematic growth — the result of renovation and modernization program of equipment approved by

Continue reading Cargo turnover at the port of East Primorye in March exceeded 1.7 million tons

Throughput of the Port Vysotsky for 3 months in 2013 increased by

59.5% — to 1.01 million tonnes

Gruzoperevalki of "Port Vysotsky" for January-March 2013 amounted to 1 million 016 thousand 762.9 tonnes of Russian coal, up 59.5% from the same period last year. The press service of the stevedoring company.

Gruzoperevalki in March 2013 amounted to 313 328.6 tonnes of Russian coal.

It is noted that the coal terminal seaport Visotsk for the first time in its history, in the three months shipped over 1 million tons of export coal. The record was made possible thanks to regular work with the courts Panamax. Since November last

Continue reading Throughput of the Port Vysotsky for 3 months in 2013 increased by

Uralmashplant shipped modern career tracked excavator EKG-18 to the Criminal Code Southern Kuzbass

Uralmashplant completed shipment of EKG-18 for Coal Company "Southern Kuzbass". The machine is made in the contract terms with a high quality. The total weight of the equipment supplied — more than 700 tons. Customer sent 25 pieces of rolling stock, including 20 railway platforms and 5 specialized conveyors for bulk cargoes.

Excavator will be used for overburden strata of coal on the Krasnogorsk section in the Kemerovo region. Installation of the excavator will begin shortly.

ECG-18 — a new development plant designers, modern reliable career tracked vehicle with a bucket capacity of 18

Continue reading Uralmashplant shipped modern career tracked excavator EKG-18 to the Criminal Code Southern Kuzbass

Throughput of the port of Vysotsk (Leningrad region). In January and February increased by 12% — up to 2.4 million tonnes

Throughput of the port of Vysotsk made in January and February 2013 2,422,000 tons, an increase of 12% over the same period in 2012. This was reported in the media administration seaport "Big Port of St. Petersburg", the area of responsibility that includes the Vysotsk.

 

Thus the volume of oil products fell against the figure in January-February of last year by 1 percent and amounted to 1.718 million tons, the volume of coal and coke increased by 67 percent to 703.5 thousand tons.

Throughput of the port of Vysotsk in February

Continue reading Throughput of the port of Vysotsk (Leningrad region). In January and February increased by 12% — up to 2.4 million tonnes

Two shafts of Belon commissioned the new lava

Lava number 561, prepared for working in the mine "chertinskaja-Coke" on the coal seam number 5, can be called the primary for the next one and a half — two years. Its reserves are about 1 million 350 thousand tons of coal over the past few years, this is the largest lava in the enterprise. Length of lava 203 meters, power — within two meters. Given the monthly burden on the face (on average 65-70 tons), to complete the testing of lava is scheduled for November 2014.

When commissioning the lava number 561 were prepared adjacent

Continue reading Two shafts of Belon commissioned the new lava

Two shafts of Belon commissioned the new lava

Lava number 561, prepared for working in the mine "chertinskaja-Coke" on the coal seam number 5, can be called the primary for the next one and a half — two years. Its reserves are about 1 million 350 thousand tons of coal over the past few years, this is the largest lava in the enterprise. Length of lava 203 meters, power — within two meters. Given the monthly burden on the face (on average 65-70 tons), to complete the testing of lava is scheduled for November 2014.

When commissioning the lava number 561 were prepared adjacent

Continue reading Two shafts of Belon commissioned the new lava

Siberian Anthracite. Kolyvansky coal mine in the Novosibirsk region (photo)

Report of Fame Stepanova (Gelio)

 

Kolyvansky coal mine located on the right bank of the Ob River in the administrative boundaries of the Novosibirsk region, 100 km south of Novosibirsk. Included in the Horlivka coalfield. As of 2011, proved reserves at the site is about 97 million tons of useful species that predicts operating area for 48 years. Developer — "Siberian Anthracite".

"Siberian Anthracite" — the only coal producer in the Novosibirsk region.

C 2007 JSC "Siberian Anthracite" develops Krutihinsky Kolyvansky portion of the deposit.

Continue reading Siberian Anthracite. Kolyvansky coal mine in the Novosibirsk region (photo)

SQL - 16 | 3,526 сек. | 7.27 МБ