JZ completed the reconstruction of the overpass Lazouski worth 40 million USD

 Photo source:com.ua

Statutory territorial trade association "Southern Railway" (JZ) completed the reconstruction of the overpass Lazouski six months earlier than planned, the press service of the Southern Railway. Vehicular traffic on the overpass over the railroad tracks Lozovaja station was opened December 30, 2011 "This is actually a new facility worth 40 million USD. From here there were only the old foundations and intermediate supports, which have been repeatedly stressed, everything else — spans, roadway design, and so on — the new "- are reported words of the Southern Railway Victor Ostapchuk. The reconstructed overpass was almost six times

Continue reading JZ completed the reconstruction of the overpass Lazouski worth 40 million USD

The expedition to St. Petersburg 23-25 maya.Idet set of participants!

In late May, we go to the next exciting journey to study the industrial and high-tech industries in Russia. At this time in the Rostov region! If you or your friends — undergraduates, graduate students and young scientists, economists, managers, or even anti-crisis managers, employees of enterprises, businessmen and technicians — all who are passionate about industrial production or working in it. Get involved!

I would like to see the innovation? Learn how interesting ideas put into practice and create a unique production sites? — Then you just us.

If you've always wanted to visit on this

Continue reading The expedition to St. Petersburg 23-25 maya.Idet set of participants!

CTZ completed the development of a new modification loader PK-46

 Photo source:i-mash.ru

In design and technology department wheel technology Chelyabinsk Tractor Plant has completed the creation of a new modification of the front loader middle-class PC-46 with six-cylinder in-line diesel engine series T 6T370.

The first two prototypes of the new front-end loaders CTZ will be collected in the first half of 2011

6T370 engine was developed under government contract and complies with the European standard for road construction engineering machinery Tier-2 (similar to Euro-4). The engine is equipped with:

* Electronic fuel injection «Common Rail», * Particulate filter * Afterburner in the exhaust system

Continue reading CTZ completed the development of a new modification loader PK-46

The Khrunichev Center has completed production of the first Angara

The first light booster "Angara" will be sent from the factory to the launch site at the end of May.

Inform us about it to journalists on Wednesday, Deputy Director General of the Khrunichev Space Center Vladimir Petric.

"On the night of May 28, the first and second stages of the rocket" Angara "will be sent to the Plesetsk Cosmodrome", — said V.Petrik.

He noted that the center SCRMC completed production of the first rocket stages, and in the days to immerse them in a special railway containers for shipment to the launch

Continue reading The Khrunichev Center has completed production of the first Angara

The doctrine of sappers: mined from the air, on land cleared

The aviation range of Army Aviation, located in Leningrad region, was completed teaching engineering battalion combining air and air defense of the Western Military District.

As of Friday, 19 October, BelTA 47News, the press service of the cooling zone, in the course of the exercise military sappers marched on automotive technology, reflecting the sudden attack conventional enemy sabotage groups, overcoming the natural and artificial barriers, and in due time arrived at the training ground.

At the landfill, military engineering battalion to work out issues antipersonnel mine minefield, staged combat helicopters Mi-8 and Mi-24 helicopters from the

Continue reading The doctrine of sappers: mined from the air, on land cleared

Successfully completed environmental testing cars RIC dimension of TIZ

For five days the new RIC car manufactured by Siemens and Tver Carriage Works, visited the conditions and the Far North and equatorial Africa.

In Vienna (Austria) completed environmental testing of the first car of the international dimension RIC, built by Siemens in cooperation with the Tver Carriage Works (part of ZAO "Transmashholding"). The test results confirmed the compliance of the car to the specs and safe operation at high and low temperatures.

The tests were carried out of the car model 61-4476 in a climate chamber "Vienna-Arsenal" — the only one in Europe test facility of this type.

Continue reading Successfully completed environmental testing cars RIC dimension of TIZ

Successfully completed sea trials tug state Pomorie

June 14, 2011 were successfully completed sea trials tug state "Pomerania" project 90600, built on Leningrad shipyard "Pella". In 2011, the tug was commissioned in the Northern Fleet.

Pella has a leading position in the Russian market buksirostroeniya. Tugs "PELLA" — a new generation of tugs successfully exploited in all major Russian ports. High quality and modern technical equipment of ships PELLA appreciated by customers from Norway, Italy and many other countries.

TNK-BP completed the next stage of modernization of the Saratov Refinery

TNK-BP has completed the next phase of the planned renovation and reconstruction of equipment installations at the Saratov Oil Refinery (SNPZ) (part of the TNK-BP).

As part of the modernization program of technical re-equipment of the Company held reforming units "L-35-11/300" and "LCH-35-11/600" and completed the major work on the reconstruction of a diesel hydrotreater.

TNK-BP is implementing a long-term investment program aimed at improving the quality of oil products. SNPZ the end of this year, plans to complete the reconstruction of the hydrotreating unit and the construction of an isomerization unit and move to production of fuel, "Euro 5".

Continue reading TNK-BP completed the next stage of modernization of the Saratov Refinery

Su-35s flew from Komsomolsk-on-Amur in Ahtubinsk

The prototype model of a new multi-purpose fighter Su-35s, built in Komsomolsk-on-Amur Aircraft Production Association of the company "Sukhoi" under a contract with the Ministry of Defense of Russia arrived in the State Flight Test Center at the Ministry of Defense Akhtubinsk.

The flight from Komsomolsk-on-Amur in Ahtubinsk completed test pilot Colonel Alexei Pestrikov glycerol. In Akhtubinsk first copy of the Su-35s will soon begin to fly on the program state joint tests.

The contract for the development and delivery of 48 Russian Air Force Su-35s in 2015 was signed between the company "Sukhoi" and

Continue reading Su-35s flew from Komsomolsk-on-Amur in Ahtubinsk

STC has completed factory testing of two types of multicopter

Ltd. "Special Technology Centre" (STC) has completed factory flight tests of two types of complexes multicopter aerial reconnaissance and surveillance, said "AviaPort" a source in the aviation industry. Factory tests were multicopter with four and six rotors. Both types of multicopter tested together with their target loads. Quadrocopter has a launch weight of 2.5 kg, geksakopter — 4.5 kg. The first deliveries of the complexes with multicopter expected in the second quarter of this year. Multicopter development of STC can be DEMAND security forces, as well as some civilian customers, the source said. As previously reported, in the

Continue reading STC has completed factory testing of two types of multicopter

SQL - 16 | 1,355 сек. | 7.35 МБ