In the village. Red Lighthouse Krasnoyarsk region opened a fitness center Pulse

Construction of a sports complex in the Red Lighthouse began in 2011. The cost was more than 76 million rubles, the money was allocated from the regional budget. The Ministry of Education and Science of the edge of supervising the administration of the facility.

Schedule a sports complex "Impulse" is already painted. In the morning there will engage students in the afternoon train boys sports clubs and District Youth and adults in the evening. The capacity of the complex will be up to a thousand people a month.

Photo

Continue reading In the village. Red Lighthouse Krasnoyarsk region opened a fitness center Pulse

Synergy-1 — a new diagnostic system of the Moscow metro (lots of pics)

photo by Alexander Popov Russos

Actively expand the subway network, the extension of existing lines and construction of new necessitated the development and implementation of modern diagnostic facilities underground way to improve the reliability of the main transport system of the city and the safety of passengers. To do this, commissioned by the Moscow Metro was created a unique set of diagnostic laboratory "Synergy-1", which will house all the necessary equipment to diagnose the state of track facilities.

August 8, 2013, the first work of the diagnostic check of the car "Synergy-1", in which

Continue reading Synergy-1 — a new diagnostic system of the Moscow metro (lots of pics)

Photo. Birth engine Vladimir electromotor plant (concern Ruselprom)

"PK" VEMP "- the largest Russian manufacturer of induction motors,part of the Russian electricalconcern "RUSELPROM".

We offer you the eyes to see the process of production of low-voltage electric motor

Sheets rotor

Building packages stator

 

Rotors, filled with aluminum

 

The complex mechanical winding

Winding sections

Welding leads that

Tests of core

Manual winding engines kruponogabaritnyh

Impregnation complex

Vacuum-impregnated cores

Mechanical machining of shafts

Made shaft

Continue reading Photo. Birth engine Vladimir electromotor plant (concern Ruselprom)

At the Natalka GOK (Magadan region). Assembled the world’s largest mill

In the Magadan region Natalka establish the world’s largest mill for processing gold ore. In the near future, and will open the rotational complex for 10,000 workers. This building will be the largest in the Kolyma in the last 20 years.

In the Magadan region explosions have become an ordinary event. Every day on the Matrosov Mine thus conquering the rock. In permafrost other ways to get the ore do not work — a standard excavator hard ground is not able to do. The Kolyma gold-bearing rock is mined so far only, but will soon begin, and

Continue reading At the Natalka GOK (Magadan region). Assembled the world’s largest mill

In Yakutia, completed construction of a new breeding complex

Cattle complex built for the needs of the agricultural consumer cooperative "Manchaary", which is the main organization in the processing Megino-Kangalassky area. APC "Manchaary" specializes mainly in the production of butter, and also engaged in the production of dairy products and breeding of horses.

Livestock complex in the village of Chyuyya includes barn for 200 head of dairy cattle loose housing, housing for young stock on 190 goals milking unit, backyard playground, own transformer substation and autonomous water supply system. 

In the industrial community Alexander Nevsky Ryazan region opened sports complex

August 14 in a working village of Alexander Nevsky in a festive atmosphere features a modern sports complex.

Sports complex is built in the new landscaped neighborhood of the camp. The estimated cost of the project amounted to more than 172 million rubles. Two-thirds of that amount — the regional budget and the rest were obtained from the federal government.

The three-storey building housed a large hall for team sports with bleachers for 500 people, meeting rooms for wrestling, table tennis, gym, children’s and adult pools.

Photo  Photo

On the basis

Continue reading In the industrial community Alexander Nevsky Ryazan region opened sports complex

Console presented in Feodosia home for happiness

The modern and comfortable apartments are located in the climatic pavilions along the waterfront. Klimatopavilon — complex health profile, which is located in a recreational area of Theodosius. Such a project is made by the construction company "Consol" for the first time and sent to rest and treatment. The apartments Klimatopavilon can live like during the summer season and time. 

Just thirty meters separate the body from the Klimatopavilon blue surface of the Black Sea. Out of the house, three minutes and you’re plescheshsya a refreshing and invigorating sea water. Well, do not dream of it?

Continue reading Console presented in Feodosia home for happiness

When the Military-Industrial Commission created a special office

When the Military-Industrial Commission created a special office to monitor the legality of the actions of officials in the performance of the state defense order.

The Deputy Chairman of the Russian Federation, Dmitry Rogozin, the government authorized at a meeting of the MIC. First Deputy MIC Ivan Kharchenko appointed head of the staff. In addition to members of the military-industrial complex of the structure will include heads Rosoboronzakaz, representatives of FAS PCT Rosrezerva, Ministry of Finance, Ministry of Economic Development and RTN, said Dmitry Rogozin.

According to him,

 "headquarters will be parsed for each

Continue reading When the Military-Industrial Commission created a special office

In the Pskov region completing the construction of a new breeding complex

In September of this year in the Pskov region will be put into operation a new dairy farm, the main feature of which — loose housing of cows.

New dairy farm designed for 524 head of dairy cattle. Investment in construction and equipment of the complex was 240 million rubles.

On the new animal farm "Victory" is scheduled to introduce new technologies, feeding and milking cows. These technologies will allow the maximum mechanization and automation of the production process. Through this service the farm will be able to only 31 people.

Continue reading In the Pskov region completing the construction of a new breeding complex

In Tyumen opened ice complex Surf

phototyumen.ru

It was erected at the expense of the regional budget, and equipment (refrigeration equipment, hockey court, bleachers for spectators, sports synthetic surface, ledozalivochnaya machine, fitness equipment) was supplied by the federal budget.

The capacity of the sports complex at the training sessions will be 50 people per shift, and during the conduct of the competition — up to 100 people.

For the young athletes here are special simulators for complex elements of skating, built warm passage to the main building of the sports school, where the dance hall and facilities for physical training.

Continue reading In Tyumen opened ice complex Surf

SQL - 16 | 1,923 сек. | 7.18 МБ