Calendar

Июль 2018
MTWTFSS
« Dec  
 1
2345678
9101112131415
16171819202122
23242526272829
3031 

U.S. disappointed by the decision of the UN in relation to Belarus

U.S. State Department spokesman Sean McCormack said that "Belarus and Cuba are among the more active offenders Human Rights in the world. "McCormack criticized the Council’s decision to suspend the mandate of the Special Rapporteur on Belarus and Cuba. U.S., which previously expressed their apprehension regarding the Board Human Rights UN do not belong to her and have only observer status.• The Council terminated the UN special rapporteur positions Belarus and Cuba, 19.06.2007 • A.Belyatsky "Cancel rapporteur — a result of the political contract", 19.06.2007 • Gaiduchevici and Protko — exclusion of Belarus from the blacklist UN 19.06.2007

(function (w, doc) {
if (!w.__utlWdgt) {
w.__utlWdgt = true;
var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’;
s.type = ‘text/javascript’;
s.charset = ‘UTF-8’;
s.async = true;
s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

Yu.Turonak Alliance Belarusian youth I studied for four years

By Dr. Yuri Turonka books in Belarus in the near future there is special attention. According to a survey of "Nasha Niva", his "modern history of Belarus" recognized as the best book of 2006. A part of the circulation of the second study — "People GMS" — was This year KGB confiscated stock IPO Belarusians of the World "Fatherland." About this confiscated, book and we talk with Yuri Turonku in his Warsaw apartment on the street Tamkovay.Michas Scoble: "The Emperor Yuri, how long did it take you to research topics of the Belarusian Union of Youth?"Yuri Turonok: "History of the

Continue reading Yu.Turonak Alliance Belarusian youth I studied for four years

Environmental problem with the 80-year-old decide in Irkutsk region

Remains of arsenic in plant Svirsk will show any local resident. This extensive brick ruins, situated between the modern and the ancient village of Svir Makarievo on the banks of the Angara. They take up more than a dozen acres, and its height is 17 meters around the imposing ruins lies a huge black spot, virtually devoid of vegetation greens are only small islands shining gently through the thick layer of dead ash …  However, arsenic plant became known recently. Its developers have been more considerate — appeared in 1934, a secret facility was officially named the Angarsk Steel

Continue reading Environmental problem with the 80-year-old decide in Irkutsk region

Ukraine increases gas production offshore in the Black Sea

In January-September 2012, the GAO Chernomorneftegaz increased production of natural gas compared to the same period last year by 14.7%, or 108 million cubic meters.

As the press service of the company, in just nine months were produced 843 million cubic meters. The main increase was obtained in the third quarter — after due to active work on the shelf company crossed the historic peak daily production of oil fields in the Black Sea — 3 million cubic meters. In July-September Chernomorneftegaz extracted 300.9 million cubic meters, up 18.2%, or 46 million cubic meters more than the

Continue reading Ukraine increases gas production offshore in the Black Sea

Ukraine in January-July, has reduced gas consumption by 7.5%

KIEV, August 30 — RIA Novosti, Alain Mate.Ukraine in January-July this year consumed 30.5 billion cubic meters of gas, which is 2.5 billion cubic meters (7.5%) less than in the same period last year, said Friday the information-analytical bulletin government, referring to the Ministry of Energy of Ukraine.

In particular, in January-July imports of gas was 12.5 billion cubic meters, up 33.6% (6.3 billion cubic meters) of less than seven months of 2012. In this case, the transit of gas through Ukraine for seven months also declined — by 6.8% (3.5 billion cubic meters) compared to the

Continue reading Ukraine in January-July, has reduced gas consumption by 7.5%

Jack-Up Peter Godovanets completed the drilling of the first well

In early July 2012 jack-up rig "Peter Godovanets" — so-called "tower Boyko" — has completed drilling of number 11 in 1170 m depth and the beginning of the well number 21 at the Odessa gas field. On Wednesday, July 4, the press service of "Naftogaz of Ukraine". In general, this field jack-up rig "Peter Godovanets" raskonserviruet one and will drill five wells.

According to the NAC, the continued resettlement of Odessa and the Nameless fields using two modern jack-up will make it possible in 2013 to produce deposits of more than 600 million cubic meters. m, and in 2014

Continue reading Jack-Up Peter Godovanets completed the drilling of the first well

The laying of the keel of LNG Sibur Tobol

The shipyard Hyundai Mipo Dockyard Co.Ltd. (South Korea), the laying of the keel of the second LNG carrier ordered by SCF Group to work on the contract with the petrochemical holding Sibur.

In March last year, a leading Russian shipping company and a leader of the Russian petrochemical industry have signed a long-term agreement on the chartering of two polurefrizheratornyh of gas carriers for regular year-round transportation of liquefied petroleum gas (LPG). Vessels built under the supervision of two societies — Lloyd's Register (LR) and the Russian Maritime Register of Shipping (RS).

Continue reading The laying of the keel of LNG Sibur Tobol

Segezhsky LDK started production of a new product

On August 1 лесодеревоперерабатывающем plant "Segezhsky" industrial production of special pallets for transport of paper bags. The new products are designed for a different group companies — "Segezhskaya Packaging." It is planned that by the beginning of next year, LDK will provide at least half of the needs of "Segezhskaya Packaging", producing up to five thousand pallets per month.

Transport containers made of dry lumber low, but sufficient to produce this kind of product quality. Before these lumber sold to other local producers, who are then "Segezhskaya Package" gets ready pallets. However, after analyzing the economic

Continue reading Segezhsky LDK started production of a new product

Seversky Tube Works implemented a joint project to build a concrete-and-mortar site

Seversky Tube Works, which is part of TMK, launched into commercial operation a new concrete-and-mortar unit (BRU) for the production of building materials. The project was implemented in cooperation with the company "Remstroygrupp."

New concrete and mortar unit — a modern plant for the production of concrete and mortar with high efficiency (up to 60 cubic meters per hour). Unit is equipped with computer numerically controlled and can produce a day to one thousand cubic meters of construction materials.

 

The presence of three receiving hoppers new BRU allows a ready-mixed concrete

Continue reading Seversky Tube Works implemented a joint project to build a concrete-and-mortar site

Northern Wastewater Treatment Plant Vladivostok ready to work at full capacity

Northern Wastewater Treatment Plant in Vladivostok for the third month running in test mode. Now they received 12,000 cubic meters of wastewater per day. This is the first treatment in Russia, launched in beta in the winter. At full strength, they will begin to work closer to the summer. At night the northern wastewater treatment plant will be able to pass 50,000 cubic meters of waste water.

Photo: Anton Balashov, RIA PrimaMedia

The total capacity of all treatment Vladivostok: the northern, central and southern — is 370 thousand cubic meters of waste water per day when applying to

Continue reading Northern Wastewater Treatment Plant Vladivostok ready to work at full capacity

SQL - 8 | 2,658 сек. | 8.44 МБ