Calendar

Февраль 2018
MTWTFSS
« Dec  
 1234
567891011
12131415161718
19202122232425
262728 

Yaroslavl Shipyard boat delivered to the customer project 14172 Terrier

The contract for the construction of two high-speed pilot boats of the project 14172 "Terrier" concluded between JSC "Yaroslavsky Shipbuilding Plant" and by "Zodiac Invest GmbH" (Germany) May 10, 2012

The designer — JSC "Zelenodolskoye Design Bureau"

The main parameters of the boat:

Overall length, 12.35 mOverall width, 4.14 mDraft amidships at full displacement, m 0.61Maximum (short-term) speedat full displacement at sea state 2 points, however, knots 30Crew 2Passengers (pilots), pers. 4Self-sufficiency of fuel, drinking water,bilge water and waste-sewer system, however, day 2Class KM [2] AUT3 HSCDelivery time — the end of 2012.

Continue reading Yaroslavl Shipyard boat delivered to the customer project 14172 Terrier

Battleship. Survivability of an aircraft carrier

The officer leaned over the mortally wounded Nelson, and at that moment from the lips of the dying admiral flew weak moan «Kiss me» (kiss me). Vice Admiral Hardy was taken aback and twice kissed Nelson. Historians argue to this day about the significance of this episode, one of the versions of the dying Nelson likely Pronunciation «Kismet» (Providence, rock). Combat survivability of ships rather difficult and controversial topic. Maritime history is full of examples of the impending death of class ships previously seemingly unsinkable, and, at once, just as indescribable cases salvation in desperate situations. At first glance,

Continue reading Battleship. Survivability of an aircraft carrier

Ships being built for the Russian Navy, as of Photos from 14.07.2013g.

In Russia there is a large-scale construction of the fleet, not so long unoccupied yard, crammed with orders for the Navy, before our eyes, created our new fleet.

Glory to Russia.  

Warships:

1. Project 955 SSBN "Alexander Nevsky" — displacement of 17000t.

2. Project 955 SSBN "Vladimir Monomakh" — displacement of 17000t.

3. Project 955 SSBN "Prince Vladimir" — displacement of 17000t.

4. SSNs of Project 885 "Severodvinsk" — 13,800 tons displacement

Continue reading Ships being built for the Russian Navy, as of Photos from 14.07.2013g.

Mid-Nevsky Shipyard has laid a second tug Project 81

27/03/13 at JSC "SNSZ" there was a second tab is tug D.81 head. Number 812 in a series of six vessels. And as of 12/03/13 on "SNSZ" started cutting metal for 3 and 4 tugs D.81 Head № № 813,814

 

Pusher Project 81 has a full displacement of 365 tons, length 25 m, width 10 m vessel is designed for pushing and short-term (emergency) towing barges Project 82 full displacement of about 5,200 tons at a speed of 10 knots. The ship is a unique on-board coupling type ARTICOUPLER KVC3545

Continue reading Mid-Nevsky Shipyard has laid a second tug Project 81

SNSZ laid the keel of the fourth pusher for LLC P.TransKo

At the Mid-Nevsky Shipyard (JSC "SNSZ" part of the United Shipbuilding Corporation) carried tab pusher Project 81 (serial number 813).

This is the fourth ship in a series of six pushers Project 81, supplied under a contract with "P.TransKo", concluded in February 2013.  A distinctive feature of the ship is a friction coupling type Articoupler KVC3545 company Taisei Engineering Consultant Inc (Japan), allowing a significant mutual rocking tug and barge, which allows the use of a barge-towing structure in the near-sea area, as well as shortened the procedure coupling-uncoupling of tug-and-barge 30 seconds. As a steering device

Continue reading SNSZ laid the keel of the fourth pusher for LLC P.TransKo

On the Diamond was launched on the ship of Project 10412

April 22, 2011, in the waters of the shipbuilding firm "Almaz" operation took place on the descent of the water of the new ship of the project 10412 (serial number 044), built for the Socialist Republic of Vietnam.

In the previous three days, experts SF "Diamond" carried out the ship’s shifting PD-423 to the docking position to the boathouse, rolling out a new ship on the wall and seaming it in a floating dock, moving back to the pit release and, finally, just walk down to the water. Currently, the ship put out floating dock and moored at

Continue reading On the Diamond was launched on the ship of Project 10412

Popilov Yachts is working on the construction of their first child

 

Model POPILOV-1999 will offer a spacious lounge with dining area for 8 people, located on the main deck and 4 comfortable cabins on the lower deck master stateroom, VIP cabin and two guest cabins, each with a private bathroom. In the stern of the yacht there is another cabin for the crew. The impressive flybridge is equipped with everything needed for a comfortable stay, well-organized storage on the fly bridge tender.

The yacht has the following characteristics: body length — 19.9 m, beam — 5.5 m maximum draft — 1.8 m displacement at full load

Continue reading Popilov Yachts is working on the construction of their first child

AFS was launched on 3 tugs for OMS Shipping

August 14, 2013 at the site of the shipyard head of the "Caspian Energy" — Astrakhan Shipbuilding Production Association (AFS) — held a launch of three tugboats for OMS Shipping (Kazakhstan).

Vessels with a total capacity of two main engines of 880 kWR designed for towing barges displacement of up to 4,000 tons at a speed of up to 5 knots, for the movement of ships in port waters, installations of ships at berth, participate in rescue operations. Intended navigation — the Caspian Sea. Main technical characteristics:

length — 24.5 m, total width — 8 m

Continue reading AFS was launched on 3 tugs for OMS Shipping

On the Admiralty Shipyards laid the fifth diesel-electric submarines for the Navy in Vietnam

July 1 to "Admiralty Shipyards" laid the fifth diesel-electric submarines of Project 636 "Varshavyanka"HQ-186 Khanh Hoa (Serial number 01343) for the Vietnamese Navy.

HQ-183 H? Chi Minh («Ho Chi Minh City") — the second boat is under contract with Vietnam (photo dmirg78)

The performance characteristics of diesel-electric submarines of Project 636:

Surface displacement, ie — 2350; Water displacement, that is — 3950. Speed (surfaced): 17 knots Speed (underwater): 20 knots Operating depth: 240 meters Depth: 350 meters Endurance: 45 days Crew: 57 people On submarines are six 533-mm torpedo tubes, ammunition — torpedoes, mines or

Continue reading On the Admiralty Shipyards laid the fifth diesel-electric submarines for the Navy in Vietnam

Ships being built for the Russian Navy, as of Photos from 14.07.2013g.

In Russia there is a large-scale construction of the fleet, not so long unoccupied yard, crammed with orders for the Navy, before our eyes, created our new fleet.

Glory to Russia.  

Warships:

1. Project 955 SSBN "Alexander Nevsky" — displacement of 17000t.

2. Project 955 SSBN "Vladimir Monomakh" — displacement of 17000t.

3. Project 955 SSBN "Prince Vladimir" — displacement of 17000t.

4. SSNs of Project 885 "Severodvinsk" — 13,800 tons displacement

Continue reading Ships being built for the Russian Navy, as of Photos from 14.07.2013g.

SQL - 8 | 1,075 сек. | 8.39 МБ