Calendar

Январь 2018
MTWTFSS
« Dec  
1234567
891011121314
15161718192021
22232425262728
293031 

In Ulyanovsk region opened first Agribusiness Park

Now the Ulyanovsk agricultural producers the opportunity to sell locally grown produce residents of the regional center, bypassing intermediaries. In the first phase of the project to establish a regional agro-industrial park in Ulyanovsk is commissioned modern vegetable storage for 12 thousand tons, and an indoor market with a playground out of 48 retail locations.

The construction of the first phase has been spent over 200 million rubles of private investment, and further the implementation of the project is planned to invest more than 1 billion rubles.

 

The implementation of the project to

Continue reading In Ulyanovsk region opened first Agribusiness Park

There are the first photos of promising Russian armored personnel

APC Boomerang

The first photos of prospective ROC "Boomerang" in anticipation of the exhibition RAE 2013. The project is a modular armored personnel carriers (APCs). Development of a modular armored "Boomerang" on the basis of the average wheel unified platform commissioned by the Ministry of Defense of Russian BTR-90 instead of mid-2011   The development is the Military-Industrial Company together with the Arzamas Machine-Building Plant.

On the basis of the new APC by replacing the module will create a SAM launcher, reconnaissance vehicle, ambulance, car anti-tank systems, infantry fighting vehicles in the wheel

Continue reading There are the first photos of promising Russian armored personnel

Ukraine is preparing a second batch of SD P-27 class air-to-air for

transmission of the Indian Air Force

Ukraine handed over the first batch of the Indian Air Force missiles "air-air" medium-range R-27 (AA-10 ‘Alamo’). Currently preparing to send the second batch of missiles (two-thirds of the party’s missiles are already assembled on the basis of snaryazhatelnoy).

 Earlier SJSHC "Artem" (Kyiv) has provided delivery to India of the first batch of aircraft guided missiles of medium-range air-to-air, made by order of the Ministry of Defence of India, reported the press service of the State Concern "Ukroboronprom" referring to the director general of the State Concern Sergei Gromov.

Continue reading Ukraine is preparing a second batch of SD P-27 class air-to-air for

In Komi, launched the first phase of production woodworking

On 24 September a ceremony launching the first phase of the industrial complex, LLC "PechoraEnergoResurs" in the Trinity-Pechora region.

The first phase of the enterprise includes sorting line logs, lumber shops line sorting plants, the production of wood pellets (pellets), the boiler room, the complex dryers for wood, pine oil production.

The annual volume of sawmill will be 150 thousand m3 of sawnwood, wood-processing for the production of laminated veneer lumber — 41 thousand m3, furniture board — 12 thousand m3, molded products — 4.2 million m3. Power plant for the production of wood fuel

Continue reading In Komi, launched the first phase of production woodworking

The first female pilot of civil aviation CR

If you are still on board the aircraft "Grozny Avia" of women worked only stewardesses, then more recently, this fact has changed radically.

Surprisingly, for the first time in civil aviation at the controls of the aircraft Chechnya young girl. Call our heroine Evmurzaeva Larina, she’s only 21. 

Here everything is quiet and peaceful. Passengers need not worry. Larina graduated from flight school and are now being trained to pilot civilian airliner. Aircraft fragile girl manages skillfully. While she was manned by a simple stretches of the river, but it is ready at any

Continue reading The first female pilot of civil aviation CR

Resort Golden Ring

Construction of the first phase began in May 2010 and will end in the first quarter of 2012. The resort will be fully commissioned in 2017.

Resort "Golden Ring" — Infrastructure is a tourist complex international tourists by 3000, the territory of which will create all conditions for comfortable rest, recreation, sports, business events. The resort is located near the town of Pereslavl, in the heart of the tourist route "Golden Ring": 130 km from Moscow, 120 km from Yaroslavl and 100 km from Vladimir.

Photo report for the construction of "Resort" Golden Ring "

Continue reading Resort Golden Ring

Restyled Lada Priora

Became available to the first images of the updated Lada Priora, the official premiere will take place on September 27 in Togliatti.

Restyled Lada Priora: first official pictures — Image 1

Exterior car almost pomenyalsya.Ot its predecessor restyled Lada Priora differs only slightly different rear bumper, LED tail lights and headlights with daytime running lights.

Restyled Lada Priora: first official pictures — Image 2

Restyled Lada Priora: first official pictures — Image 3

Changes to the exterior are minimal and limited to one rear bumper and other

Continue reading Restyled Lada Priora

Shell drilled its first shale wells in Ukraine (corrected)

Shell has just completed the drilling of the first well in the East of Ukraine, reportsUNNwith reference to the company.

 

At Shell confirmed that the drilling of the first exploration well "Belyaevskaya-400" is really complete.

The well belongs to the project and Shell joint venture "Ukrgasdobycha" and, contrary to reports in the media, does not apply to the Hughes site, the company added.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

Feodosiyske shipbuilders increased its net profit by 22 times

In the first half of 2013 net profit of "Feodosia shipbuilding company" Sea ", which is part of the Civil Code" Ukroboronprom "amounted to 184.8 mln., Which is 22 times more than in the entire period of 2012 (8.4 mln.). This UNN to the press service of the Civil Code "Ukroboronprom."

 Net income for the first six months of this year amounted to 608.5 mln., Which is 5 times more than in the entire period of 2012 (120.4 million USD).

The volume of output in the first half of 2013 amounted to 552.6 mln., Which

Continue reading Feodosiyske shipbuilders increased its net profit by 22 times

In Smolensk opened after reconstruction Puppet Theatre

The reconstruction of the theater began six years ago in preparation for the 1150th anniversary of Smolensk. The works, worth about 120 million rubles were financed from the regional budget.

http://www.smol-news.ru/wp-content/uploads/2013/07/D7T_1279.jpg

On Thursday in Smolensk ended long reconstruction of the building of the regional puppet theater named after Dmitry Svetilnikova, and his first audience — adults and children — with great pleasure seeing the play "Hello Bonjour! Hallow".

http://lh4.googleusercontent.com/-YnDC72S3-Ug/T5AB1CqXV8I/AAAAAAAABRQ/_dH4b42dMFY/s800/P4190057.JPG

 

Unremarkable until recently the building to date has found a brand new, "fabulous" appearance, the theater appeared large and small stage, the troupe,

Continue reading In Smolensk opened after reconstruction Puppet Theatre

SQL - 6 | 2,419 сек. | 8.44 МБ