A new kindergarten for 250 places open to children and the closed section Uzhur Sunny (Krasnoyarsk Territory)

Built to the latest standards and meets all modern requirements of kindergarten "Star" is designed for 250 children.

On three floors of the building are rooms for groups of 12, the offices of the medical staff and administration, a music room, a gym and even a computer lab. Ready to work easting and laundry room, lift facilities. And that babies do not feel cold feet, the floors on the first floor are heated. [

In Yekaterinburg opened a school for 875 seats

August 16, 2013 in a solemn ceremony opened a school-new building in the Leninsky district of Yekaterinburg.

In the new building will be able to study 875 children. At this point in the class have already enrolled 733 people, reception pupils will continue until September 1.

The complex architecture of the building by a variable number of floors with total area of 19,250 square meters will be able to comfortably accommodate almost a thousand people. In addition to the spacious classrooms in the school dining room located, accommodating 325 students in one shift, bunk

Continue reading In Yekaterinburg opened a school for 875 seats

In Tobolsk district of the Tyumen region opens a new poultry farm

Adjacent to the foxes and foxes settled Africans. In Tobolsk district started breeding ostriches. The first Siberian winter new lodgers moved well. In fur farms "Barguzinskaya" flightless birds moved last year from a nearby ostrich farm. Wintering for them was successful, although the Africans themselves — the real picky. "They need at least 20 degrees in the winter temperatures. They are also very fond of the will, that is, they can not live in a zagonchike, they necessarily need here such cages. Nutrition also great because they eat both herbivores. They eat hay , freshly cut grass and grain,

Continue reading In Tobolsk district of the Tyumen region opens a new poultry farm

GEVIT: our equipment produced more than 1.5 million sq.m.

slatted floors.

"Ideas and machine work"

The correct approach to the selection of equipment — the key to high profitability. Is no exception — the sphere of animal husbandry, where an important foundation of business success is to equip the production slatted floors.

Slatted floors for Europe and America is the same rate as energy saving equipment, with over 90% of households use the technology. The economic effect is obvious: the use of slatted floors can reduce the cost of water in five, and electricity — twice. There has been a trend and ours: assessing

Continue reading GEVIT: our equipment produced more than 1.5 million sq.m.

In the Chelyabinsk region built AGROKHOLDING Ariant logistics terminal pork half-carcasses

Polyfloor performed high-Resuthane TG 69 floors in the building, "Logistic Terminal Pork side" Agroholding "Ariant"

In the Chelyabinsk region, LLC "Poliflor" has contributed to the construction of the largest in Europe, Russia and the meat processing plant. Agricultural holding "Ariant" in the village Fedorivka builds a high-tech meat processing plant. The principal activities of the company are the production, processing and marketing of agricultural products and food products. The Company’s range includes more than 150 kinds of high quality meat, sausage and delicatessen products produced from its own resources.

Poliflor company in July 2012 took part

Continue reading In the Chelyabinsk region built AGROKHOLDING Ariant logistics terminal pork half-carcasses

New architectural character I Tall dominant Russian Yekaterinburg Part 1

Ekaterinburg City — being built business district in the center of Yekaterinburg. According to the draft, he must unite more than 400 thousand square meters. m of commercial and retail space, offices, hotels, entertainment centers, cafes and restaurants. It is planned to build 12 sites: four high-rise office, business park, with a focus on small and medium-sized businesses, the so-called shopping mall and two hotels. Area of the quarter will be five acres. The following discussion focuses on objects Ekaterinburg City as being built and planned.

The draft of the new business district, owned by the French

Continue reading New architectural character I Tall dominant Russian Yekaterinburg Part 1

Types of Ekaterinburg from a height. Summer 2012. Part 1

Report of Fame Stepanova

Ekaterinburg — the fourth largest population (after Moscow, St. Petersburg and Novosibirsk) city in Russia — 1.35 million. Thermal Springs, cultural, scientific and educational center of the Ural region, endowed with the status of the center of the Urals Federal District ("the capital of the Urals").

October Square

More? Th Chrysostom — Orthodox church bell tower.

It was destroyed by the Soviet regime in 1930 and re-established 80 years later.

Ural Bank of Sberbank of the Russian Federation and BC "Onegin"

Mayor of Yekaterinburg

The central street of the

Continue reading Types of Ekaterinburg from a height. Summer 2012. Part 1

Types of Ekaterinburg from a height. Summer 2012. Part 1

Report of Fame Stepanova

Ekaterinburg — the fourth largest population (after Moscow, St. Petersburg and Novosibirsk) city in Russia — 1.35 million. Thermal Springs, cultural, scientific and educational center of the Ural region, endowed with the status of the center of the Urals Federal District ("the capital of the Urals").

October Square

More? Th Chrysostom — Orthodox church bell tower.

It was destroyed by the Soviet regime in 1930 and re-established 80 years later.

Ural Bank of Sberbank of the Russian Federation and BC "Onegin"

Mayor of Yekaterinburg

The central street of the

Continue reading Types of Ekaterinburg from a height. Summer 2012. Part 1

In the village. Lenin Hills (Moscow reg.) After the cap. Repair opened kindergarten

In the four months from January 15 to May 15, 2012 has been updated building of the middle group of kindergarten number 26 number 52096 military unit of the Ministry of Defence of the Russian Federation (the military camp of Peter).

During the overhaul replaced roof, floors, ceilings, internal walls, all communications, insulated floors, reinforced foundation porch, replaced kitchen equipment, installed fire alarm system. Significant changes have occurred in the territory: flower beds, a children’s swing set is installed, being installed new fencing of the area, ordered furniture.

In Bronnitsy explosion occurred in a 5-storey building

Factors

17.10.11.Moschny explosion in suburban Bronnitsy afternoon of October 17. — In at number 42 on the street in Moskvoretskaya 15.26 exploded gas. From the flash fire started — told Life News in the MOE.

— The blast collapsed ceilings between the third and fourth floors and the collapse of the outer walls of the 4th and 5th floors. According to preliminary data, the debris can be people. From the state of emergency in the hospital Bronnitskaya delivered three wounded.

According to witnesses, the windows came the cry of the people, but rescuers still can not find them. At the

Continue reading In Bronnitsy explosion occurred in a 5-storey building

SQL - 16 | 1,699 сек. | 7.28 МБ