Made in Saratov — a set of diagnostic and monitoring gaps railway ways

As a result of fruitful cooperation with the Volga railway, in the Saratov NPP "Inter" is designed to ensure the safety of trains and for the first time in Russia successfully tested as early as 2000. Hardware and software system for controlling the ignition gaps railways, with the identification of races, "cutting" and insecure areas. 

Designed for automated measurement of the gaps in the movement of rail joints, races and "cutting" with the preparation of a computer card gap and bind to Puteiskiy coordinate. Self-contained, mounted on a trolley-car flaw, matrise.

Stand-alone software package for monitoring

Continue reading Made in Saratov — a set of diagnostic and monitoring gaps railway ways

Rybinsk NPO Saturn has completed the delivery of GTE to the JSC INTER RAO UES

 Photo source:yarreg.ru

JSC "NPO" Saturn "has fully complied with the plan of supply of gas turbine engines of heavy-duty 2011 for JSC" INTER RAO UES ". The company has shipped to the customer GTD-110 number 7 110 MW. This is the second high-power industrial engine, designed for the assembly of block number 2 Ivanovskikh 325 MW CCGT (branch of JSC "INTER RAO UES"). Shipment of GTD-110 number 6 for the second unit took place in July of this year. Currently, there are three commercial operation of high power gas turbines produced by JSC "NPO" Saturn "- two GTD-110 number

Continue reading Rybinsk NPO Saturn has completed the delivery of GTE to the JSC INTER RAO UES

The outlook for gas turbines at the Rybinsk

September 16, 2011 in the presence of Russian Prime Minister Vladimir Putin at the X International Investment Forum "Sochi-2011" tripartite agreement signed between the global company "General Electric", JSC "INTER RAO UES" and "United Engine Building Corporation" (MC "UEC") .

Among the most important provisions of the document — the decision to create a Rybinsk joint venture to produce gas turbines.

 Photo source:yarreg.ru

Start of construction of the new production is scheduled for the end of 2011, ending — for 2013. Funding will be provided at the expense of own funds of the project participants, and possibly

Continue reading The outlook for gas turbines at the Rybinsk

Russian Cardiology won the prestigious European competition

«Primus inter pares»

Annual Congress of the European Society of Cardiology — the world’s largest congress, which is held since 1952. This year’s congress was held in Amsterdam (the Netherlands). It was attended by more than 30,000 cardiologists and physicians related disciplines from 121 countries of the world.

http://www.rosvesty.ru/images/articles/00009133/2123-02-01.jpg

The team of Cardiology Clinical Diagnostic Department of Scientific Center for Cardiovascular Surgery. AN Bakuleva RAMS won the competition «Primus inter pares» («The first among equals"), which is part of the Congress of the European Society of Cardiology.

«Primus inter pares» — one of the most

Continue reading Russian Cardiology won the prestigious European competition

Made in Saratov — a set of diagnostic and monitoring gaps railway ways

As a result of fruitful cooperation with the Volga railway, in the Saratov NPP "Inter" is designed to ensure the safety of trains and for the first time in Russia successfully tested as early as 2000. Hardware and software system for controlling the ignition gaps railways, with the identification of races, "cutting" and insecure areas. 

Designed for automated measurement of the gaps in the movement of rail joints, races and "cutting" with the preparation of a computer card gap and bind to Puteiskiy coordinate. Self-contained, mounted on a trolley-car flaw, matrise.

Stand-alone software package for monitoring

Continue reading Made in Saratov — a set of diagnostic and monitoring gaps railway ways

The second power Ivanovskikh PSU commissioned

Power unit number 2 PGU-325 Ivanovskikh PSU in the group "INTER RAO UES" has successfully passed comprehensive testing (after working for 72 hours at rated load with the issue of electricity to the grid), as well as testing for certification of power in the framework of the program agreed with the System Operator EEC.

Currently, the Department of Energy being coordinated process of assigning the second power equipment Ivanovskikh PSU status of "innovative equipment". This status was approved by the Commission, the Scientific and Technical Council of the Ministry of Energy in April 2012.

The project for

Continue reading The second power Ivanovskikh PSU commissioned

Rybinsk Saturn has completed the delivery of GTE to the JSC INTER RAO UES

 Photo source:yarreg.ru

JSC "NPO" Saturn "has fully complied with the plan of supply of gas turbine engines of heavy-duty 2011 for JSC" INTER RAO UES ". The company has shipped to the customer GTD-110 number 7 110 MW. This is the second high-power industrial engine, designed for the assembly of block number 2 Ivanovskikh 325 MW CCGT (branch of JSC "INTER RAO UES"). Shipment of GTD-110 number 6 for the second unit took place in July of this year. Currently, there are three commercial operation of high power gas turbines produced by JSC "NPO" Saturn "- two GTD-110 number

Continue reading Rybinsk Saturn has completed the delivery of GTE to the JSC INTER RAO UES

Russian Cardiology won the prestigious European competition «Primus inter pares»

Annual Congress of the European Society of Cardiology — the world's largest congress, which is held since 1952. This year's congress was held in Amsterdam (the Netherlands). It was attended by more than 30,000 cardiologists and physicians related disciplines from 121 countries of the world.

http://www.rosvesty.ru/images/articles/00009133/2123-02-01.jpg

The team of Cardiology Clinical Diagnostic Department of Scientific Center for Cardiovascular Surgery. AN Bakuleva RAMS won the competition «Primus inter pares» («The first among equals"), which is part of the Congress of the European Society of Cardiology.

«Primus inter pares» — one of the most prestigious and important

Continue reading Russian Cardiology won the prestigious European competition «Primus inter pares»

The outlook for gas turbines at the Rybinsk

September 16, 2011 in the presence of Russian Prime Minister Vladimir Putin at the X International Investment Forum "Sochi-2011" tripartite agreement signed between the global company "General Electric", JSC "INTER RAO UES" and "United Engine Building Corporation" (MC "UEC") .

Among the most important provisions of the document — the decision to create a Rybinsk joint venture to produce gas turbines.

 Photo source:yarreg.ru

Start of construction of the new production is scheduled for the end of 2011, ending — for 2013. Funding will be provided at the expense of own funds of the project participants, and possibly

Continue reading The outlook for gas turbines at the Rybinsk

Russia has restored the old volumes of electricity supplies to Belarus

Society June 13 Russia's OAO "Inter RAO UES" has resumed shipments of electricity to Belarus. The share of Russian electricity has risen from 7% to 12% in the previous balance daily energaspazhyvannya Belarus.

June 9 "Inter RAO UES" has reduced the supply of electricity, as Belarus is not repaid 1.5 billion Russian rubles.

June 10 representatives of the "Belenergo" and "Inter RAO UES" discussed the schedule for the payment of debt. Following the talks in Moscow signed a payment schedule, according to which Belarusian side to repay the debt before July 5, BelTA informs.

Continue reading Russia has restored the old volumes of electricity supplies to Belarus

  • Page 1 of 2
  • 1
  • 2
  • >
SQL - 16 | 1,310 сек. | 7.26 МБ