Production of flat glass in Russia for 10 months of 2012 increased by 5%

Production of flat glass in Russia in January-October 2012 increased by 5.0% to the same period last year to 204.9 million m2 (January-October 2011: 195.2 million cu m2). Release of raw glass sheet increased by 5.2% to 183.3 million m2, sheet processed glass — 4.5% to 21.6 million m2.

Among all other types of sheet glass to maximize the raw for 10 months in 2012 was observed in the production of sheet glass thermally polished +8.8%. In the category of processed glass sheet production showed the highest growth segment of sheet glass curved, faceted and engraved 17.0%.

Continue reading Production of flat glass in Russia for 10 months of 2012 increased by 5%

The new production line for eggs cassettes launched in Izhevsk

The new production line for cartridges for eggs at the company launched "Sputnik" Society for the Blind in IzhevskIt provides all the basic cassettes poultry Udmurtia, as well as neighboring regions.Today at the Izhevsk training and production enterprise "Sputnik" All-Russian Society for the Blind was inaugurated a new line of limp-2400 for the production of full-knobby cells — more familiar to consumers as cassettes for eggs.

The event was attended by Deputy Prime Minister Ildar Bikbulatov Udmurtia, Minister of Industry and Energy of the Republic Oleg Radzivonau. They familiarized themselves with the company as a whole, looked

Continue reading The new production line for eggs cassettes launched in Izhevsk

The construction of the LNG plant on the Yamal Peninsula is ahead of schedule

"Novatek" and «Total» report an acceleration of the pace of construction of the plant for liquefied natural gas on the Yamal Peninsula, which will ultimately contribute to the growth of freight traffic along the Northern Sea Route.

Sabetta port will be one of the largest in the Arctic (Fig.: presentation of the project of "Novatek")

According to the regional authorities, the construction is proceeding ahead of schedule, which is of great importance for the development of the Arctic region. In 2012, the construction was removed 1.5 million cubic meters of seabed in waters of the projected sea port of Sabetta,

Continue reading The construction of the LNG plant on the Yamal Peninsula is ahead of schedule

In Orenburg, upgraded children’s Regional Hospital

To update the image of the region’s leading children‘s hospitals in the healthcare modernization program was directed 62 million. By December 1, 2012 overhauled outpatient housing and almost all hospital services.

As chief medical officer says CSTO Natalia Smolyagin, over forty-six years old children’s hospital did not know such a great work to strengthen the material and technical base.

The works in the receiving-diagnostics, cardiology, endocrinology, ophthalmology, intensive care, ENT, gastroenterology, Nephrology Unit.

In general, the modernization program repaired 95 percent of the total area. On the additionally allocated from the regional budget of 7 million rubles repaired

Continue reading In Orenburg, upgraded children’s Regional Hospital

The village Mayma Altai Republic has opened a kindergarten

November 29 in the village of Mayma was the opening of a kindergarten "KOLOSOK." Now it is renovated preschool with comfortable, bright rooms with modern bathrooms and food unit. Full cost of the project — 61 million 281.3 thousand rubles, of which more than 300 thousand rubles — municipal funds.

This kindergarten is the second in a row returned in the area. The building was commissioned in 1984, has been in office OPH "Chui", — the press service of the government of the republic.In "spikelets" There are six groups — two junior, middle panel, two senior and preparatory group. In

Continue reading The village Mayma Altai Republic has opened a kindergarten

After the reconstruction of kindergartens were opened in Tyumen and the Arkhangelsk region and an orphanage in Orenburzhskoy

In Tyumen opened after reconstruction kindergarten number 14. Kindergarten was chetyrnadtsytym account opened in the Tyumen region this year.

Photo: phototyumen.ru

Preschool in the village Sidorovskaya Arkhangelsk region will attend the 50 kids. In his update was allocated nearly 25.7 million. Kindergarten will visit children who live not only in Sidorovsk, but other localities situated on the left bank of the river Vileda, as well as in the regional center — the village Ilyinsko-Podomskoe.

In the Orenburg region was opened after an overhaul of state fiscal educational institutions for orphans and children left without parental care, "Children’s House g.Sol-Iletska."

Continue reading After the reconstruction of kindergartens were opened in Tyumen and the Arkhangelsk region and an orphanage in Orenburzhskoy

Renewal of road engineering in Cheboksary and Kostroma

In Cheboksary on Red Square has passed demonstration of the new road machinery. Over the past few years is the biggest update the machine park of the municipal road maintenance companies "Doreks." The technique has been purchased with the support of the city under the lease agreement.

This year purchased 19 units of road maintenance vehicles (2011 — six units of special equipment, just for the enterprise — 97 units of specialized equipment). The total cost — 30.5 million rubles, a down payment of 20% — 6.1 million rubles, the monthly payment — 844.5 thousand rubles. Under the agreement, the

Continue reading Renewal of road engineering in Cheboksary and Kostroma

Ust-Luga extended for the construction of a new terminal

The Russian government has decided to expand the boundaries of the port of Ust-Luga to include land designated for the construction of a terminal for transshipment of liquefied petroleum gas (LPG) with a capacity of up to 4 million tons of base and providing fleet.

The company "Sibur-Portenergo" started construction of a terminal for transshipment of LPG in the port of Ust-Luga in May 2010. Its design capacity is 1.5 million tons of liquefied petroleum gas and 2.5 million tons of light oil per year.

Also in the village of Ust-Luga launched a pilot project in the Leningrad Oblast

Continue reading Ust-Luga extended for the construction of a new terminal

In the Tula State Pedagogical University has opened a new swimming pool

Building on the program "500 pools for high schools" began in the Chair for them. LN Tolstoy, in May of this year. In record time, the unique building has been erected.

Every week there will be able to deal with 3,500 students and residents of Tula.

The technological equipment of the pool allows you to set strict requirements for water temperature and air. Water passes through several stages of mechanical and chemical treatment, oxygenated and requires no chlorination. Pool deck is made of special durable stainless steel. The length of each of four lanes — 25 meters. The

Continue reading In the Tula State Pedagogical University has opened a new swimming pool

In the village of Severoonezhsk (Arkhangelsk Oblast) opened fitness center

December 1 in the village Severoonezhsk Plesetsk District of the Arkhangelsk region inaugurated a fitness center.

Construction of sports facilities began in 2011 as part of the regional program "Sport of the White Sea." Sports facility includes a multi-purpose hall for team sports 36 m ≤ 18 m and two gyms. In addition, the building is equipped with auxiliary facilities: locker rooms, massage and medical rooms, coaching rooms, etc.

On the construction of the object from the regional budget allocated about 36 million rubles from the local — more than 10 million rubles. Also within the framework of the Federal

Continue reading In the village of Severoonezhsk (Arkhangelsk Oblast) opened fitness center

SQL - 16 | 1,831 сек. | 7.3 МБ