Skipping to the elite

[Img = http://www.kommersant.ru/region/rostov-na-donu/pics/rostov/2008/188/b.jpg] FC "Rostov" for five rounds before the end of the championship in the first football league secured place in the Premier League. Athletic performance, "Rostov" added the investment successes: how the "Y", the club successfully places the issue of shares for 700 million rubles., The results of which 25% will receive one share of Administration of Rostov region, 50% +1 share — holding "Estar" 25% -2 shares — LLC "RostovDonDevelopment." The next year, FC can spend another additional issue. [Cut] On Tuesday evening, FC "Rostov" has officially returned to the Premier League after a year’s absence —

Continue reading Skipping to the elite

SIBUR has started to build product pipeline from Pur Plant to Tobolsk

Sibur, Russia’s largest chemical holding company, has started construction of main pipelines for the transport of a broad fraction of hydrocarbons (natural gas liquids) from Pur condensate processing plant (Plant) to the production site in Tobolsk, the company said.

The pipeline is divided into two construction site, "Purovsky Plant — South Balykskaya head pumping station" length of 689 kilometers and the "South Balykskaya SOT -" Tobolsk-Neftehim "long by 417 kilometers.

The planned capacity of the new product pipeline will be more than 4 million tons per year at the site of the Pur Plant to the South Balykskaya SOT, and

Continue reading SIBUR has started to build product pipeline from Pur Plant to Tobolsk

Refurbished opened kindergartens in the Kemerovo region

November 20 Jurga Refurbished opened kindergarten "Harmony" with 100 seats. To renovate the kindergarten allocated 36.5 million rubles.

Kindergarten is for five groups for children from 3 to 7 years. There are all necessary conditions for the stay of students: cozy sleeping and group rooms, halls for music, painting and dancing.

In Anzhero-kindergarten number 10 will visit 70 children. Housewarming is made possible thanks to the action program for the return of former kindergartens to its original purpose. Formerly a center for psychological and special education of children and adolescents, who moved to another room.

For six months

Continue reading Refurbished opened kindergartens in the Kemerovo region

In the Magadan region build new processing plants

In the Magadan region began construction of mining and processing the Yana-Kolyma gold province. Implementation of these projects will lead to the emergence of the all-Russian gold mining complex values. In the long term production of gold in Kolyma may exceed twice the current level of 20 tons per year.

The overall potential of the gold Magadan Yana-Kolyma gold province is about 5,000 tons of gold. Much of the gold resources are concentrated in large facilities with the potential of more than 50 tons and with a gold content of 1.5-2.5 g / t (Natalka, Pavlik, Rodionov, Degdekanskoye, etc.).

Natalka

Continue reading In the Magadan region build new processing plants

Put into operation the first part of the road Old Main-Matveevka-border Ulyanovsk region

The new road is built in a public-private partnership administration Staromaynsky district and one of the commercial companies.

According to specialists to create lines having a width of 4.5 m and a length of 10 km, using a novel technique — a method of soil stabilization. This has reduced the cost of building one kilometer to 1.7 million.

According to experts, the construction of the road will be completed in the spring. Currently, there began the construction of a modern health center worth 150 million rubles, which will create about 80 jobs.

"With the construction of a new road area

Continue reading Put into operation the first part of the road Old Main-Matveevka-border Ulyanovsk region

Total joint replacement using a navigation system implemented in Ulan-Ude

Endoprosthesis

Surgeons Hospital Semashko in Ulan-Ude, together with Moscow and Irkutsk specialists have successfully performed the first operation arthroplasty using a navigation system that allows you to work with microscopic precision.

New technologies in prosthetics can fully restore the lost function of the body and return the person to the full quality of life. Equipment costing more than 10 million rubles, allowing to monitor the progress of the operation on a monitor purchased under the federal program "Modernization of Health", aimed at improving the quality and accessibility of health care. In the navigation system includes sensors, sensors

Continue reading Total joint replacement using a navigation system implemented in Ulan-Ude

In the Komi being built and reconstructed barn a total capacity of 4 900 heads of

Prior to 2011, in the Republic of Komi was administered only one or two farms a year, and now farmers have become much more active in the construction and reconstruction.

The reconstruction of the barn for 200 head of LLC "Agrovid" (Pechora), worth $ 21 million. Subsidies amounted to 9.7 million rubles.

Preparing for the commissioning of the 400 cows on a farm in LLC "Nursery" (p. Nebdino, Kortkerosski district). It only remains to complete the improvement works. The total cost of the project amounted to about 120 million rubles. During the years 2011-2012, in

Continue reading In the Komi being built and reconstructed barn a total capacity of 4 900 heads of

On Energomashspetsstal introduced into operation a new steelmaking complex

At PJSC "EMSS" (EMSS, Kramators’k Donetsk region). Owned by the end of 2010 is the Russian "Atomenergomash" on Nov. 15 planned start of the new steelworks. This should be the final step in the modernization of EMSS, which since the acquisition of the Russian company "Energomashspetsstal" invested over $ 100 million, the head of the supervisory board, general manager of "Atomenergomash" Andrew Nikipelov.

According to him, a new furnace with a modern powerful gas treatment could produce up to 76 tons of steel per hour, and the melting time will decrease from three and a half to less than

Continue reading On Energomashspetsstal introduced into operation a new steelmaking complex

On phosphorus introduced a system to reduce energy costs

In the workshop for the production of sulfuric acid Industrial Group "Fosforit" the work started absorbing heat recovery system (Heat Recovery System), which will help to reduce energy costs. Implementation of the system will produce up to 65 tons per hour of low pressure steam from the heat generated in the production of sulfuric acid. In turn, the increase in steam production capacity will increase the power of the enterprise and in the future will "Fosforit" to move on absolute self-sufficiency. Equipment HRS system is a patented equipment. Its costs totaled 360 million rubles. On the realization of the whole

Continue reading On phosphorus introduced a system to reduce energy costs

In the Ussuri region of Primorsky opened after renovation sports complex

Today is the grand opening of the reconstructed sports complex "Locomotive" in Ussuriysk. Sports Complex was not functioning for almost 20 years.

Sports facilities include a stadium with a football field, running track, hockey box and sector for the long jump, and a versatile game sports hall of more than a thousand square meters for up to 235 seats for spectators.

In addition, it will work four gyms, a large number of changing rooms and showers for athletes.

One-time bandwidth Sports Complex — 109 people.

On the reconstruction of the sports complex "Locomotive" It took two years were spent almost

Continue reading In the Ussuri region of Primorsky opened after renovation sports complex

SQL - 16 | 0,739 сек. | 7.3 МБ