Alrosa mined diamond weighing 158.2 carats valued at $ 1.5 million

"ALROSA" in September, received at the factory N16 Nyurbinsky GOK produced in Yakutia in the field Nyurba unique diamond weighing 158.2 carats, which is valued in excess of $ 1.5 million, the company said.

Diamond size in millimeters — 35h22h22. This rounded natural crystal, transparent one side faces relief observed. The central part — clean, with no visible defects in the peripheral zone is the inclusion of dark color, cracks and peeling technical.

"According to experts of the center diamond sorting" ALROSA ", the value of this diamond in the sale at the auction may be over 1.5

Continue reading Alrosa mined diamond weighing 158.2 carats valued at $ 1.5 million

Volvo allocated to the new plant in Kaluga $ 119 million

Volvo Group announced its decision to invest 783 million Swedish kronor (3 billion 750 million rubles) In the construction of a new plant for the production of cabs for trucks under the brand names Volvo and Renault in Kaluga. It will be located next door to the factory Volvo Group for the production of commercial vehicles. The new facility capacity of 15 000 units per year will begin its work in 2014.

Recall that the Volvo Group plant for the production of commercial vehicles was opened in Kaluga in January 2009, and currently produces heavy-duty trucks under the Volvo

Continue reading Volvo allocated to the new plant in Kaluga $ 119 million

In Aspen forests (Kemerovo region). Opened shop for the processing of agricultural products

The total project cost 14.5 million rubles. Including 6.5 million rubles. — The means of the State Fund for Entrepreneurship Support of the Kemerovo region, 3.5 million rubles. allocated from the Municipal Fund for Entrepreneurship Support Administration Osinnikovskaya urban district, 4.5 million rubles. Ltd. has invested "Cherry City".

 

In 2012, the Company "shop processing of agricultural products," Cherry City "was the winner in the competition for the provision of loans to small and medium-sized businesses from the State Fund for Small Business of the Kemerovo region.

Every year at harvest time now bought

Continue reading In Aspen forests (Kemerovo region). Opened shop for the processing of agricultural products

Port of Ust-Luga has overtaken the result of last year

Cargo handling in the port of Leningrad region, January-July 2012, with respect, the same period of the previous year, increased by more than 2 times.

Total handled 23.6 million tons of cargo, which is already more than the result of the port for all of last year (22.7 million tons).

In particular, consumers are shipped 7.8 million tons of coal (an increase over the same period last year 33.5%), 194.2 thousand tons of timber (1%). At the universal transshipment complex processed 1.6 million tons of coal and ferrous metal, which is almost 22% more than 7 months a year earlier.

Continue reading Port of Ust-Luga has overtaken the result of last year

Troitsk GRES in August increased electricity production by 42%

Electricity production branch of JSC "OGK-2" — Troitsk GRES in August 2012 totaled 450 million kWh, which is 42% more than the same period last year (317 million kWh).

The significant increase in power production performance due to the commissioning of the equipment, which in the summer of last year was in the repair in order to modernize and improve the reliability of its operation. In particular, after an extensive renovation in the spring of 2012 was put into operation unit number 8 capacity of 485 MW and was completed modernization of management control block number 4 and number 5.

Continue reading Troitsk GRES in August increased electricity production by 42%

Troitsk GRES in August increased electricity production by 42%

Electricity production branch of JSC "OGK-2" — Troitsk GRES in August 2012 totaled 450 million kWh, which is 42% more than the same period last year (317 million kWh).

The significant increase in power production performance due to the commissioning of the equipment, which in the summer of last year was in the repair in order to modernize and improve the reliability of its operation. In particular, after an extensive renovation in the spring of 2012 was put into operation unit number 8 capacity of 485 MW and was completed modernization of management control block number 4 and number 5.

Continue reading Troitsk GRES in August increased electricity production by 42%

Peat: from the fields to the battery

Twelve hundred of the boiler in the Vladimir region in this cold season, will move to the new fuel. Burning in boilers, peat region braces will bring savings in other resources, from which officers will be satisfied, and the business will be able to earn. The correspondent of "Business Navigator" was held on peat fields and visited the halls of the boiler in order to understand how to get the money out of the land which is under our feet.

360 hectares of money

By Vladimir Gusev to the district by car — an hour and a half. We

Continue reading Peat: from the fields to the battery

In Novokuznetsk (Kemerovo region). Opened a new kindergarten

With the opening of the kindergarten "Kapitoshka" which accommodates 240 beds all in Novoiliynskiy near Novokuznetsk reduced by 16%. The kindergarten will create 13 groups. For the construction and equipment of the kindergarten spent from different sources nearly 230 million rubles., Of which 162 million rubles. from the regional budget.

Everything is there for the harmonious development of the child. Optimal conditions have been created for physical training: a gym, playground in the kindergarten with special soft coating that will allow kids a safe exercise. To strengthen the health of babies has a swimming pool with his

Continue reading In Novokuznetsk (Kemerovo region). Opened a new kindergarten

In Ufa, Russia’s largest open Motoshkola

RIA "Bashkiria":

Before the start of a small instruction, the coach gets a motorcycle, seven year old Timothy shows how to properly operate the throttle stick. Training bike less than a bicycle, but is run almost like a sport. The young rider, as his friends Motoshkola idol only one.

Timothy Alexeyev, a student Motoshkola:

— When I grow up I want to be like Kohl KRASNIKOV — champion.

RIA "Bashkiria":

Today, dozens of Ufa boys a real treat. For them, the stadium opened Motoshkola builder with the latest technology. According to the 17 times world champion Nikolai

Continue reading In Ufa, Russia’s largest open Motoshkola

A modernization of the lifting of the mine complex Taimyr

The mine "Taimyr" a modernization — the strategy of development of production of MMC "Norilsk Nickel" in accordance with an increase in productivity of the mine up to 4 million tons per year. Lifting equipment is being modernized complex, the first phase of the project will exceed 1 billion 60 million rubles.

The trunk of the mine, equipped with two lift installations, was commissioned in 1984, its design capacity — 3.5 million tons per year. Project to increase the capacity of the mine will be implemented in two phases: the first modernized "Southern" elevator installation, the second — "Northern".Preparatory work

Continue reading A modernization of the lifting of the mine complex Taimyr

SQL - 16 | 0,801 сек. | 7.24 МБ