In Russia grows cod

Russian fishermen caught 89.7 tons of cod from the beginning of the year, an increase of 14.33 million tons, or 19% more than the amount of fish caught during the same period last year.

In the Far East basin produced: in the Sea of Okhotsk — 4.17 tonnes of cod, in the Sea of Japan — 0.01 million tons in the Bering Sea — 4.5 thousand tons. In the area of North and South Kuril caught 3.87 million tons of this kind of living aquatic resources, which is 86% higher than last year‘s figures.

In the Baltic Sea catch of

Continue reading In Russia grows cod

In Kazan factory Arakchinsky gypsum launched a new line of

March 14, at the "Arakchinsky plaster" launched a new production line for the production of gypsum binder capacity of 60,000 tons per year. The inauguration ceremony was attended by President of Tatarstan Rustam Minnikhanov. The latest equipment will not only increase production, but also improve the quality of our products.

Plant for the production of gypsum in Arakchino was built in 1947. In recent years, production has been seriously upgraded, was launched workshop for production of gypsum board. In 2011, the plant was released 89,000 tons of gypsum binder and nearly 5 million square meters of plasterboard.

Continue reading In Kazan factory Arakchinsky gypsum launched a new line of

Batch of new agricultural equipment arrived in Buryatia

More than 30 pieces of high-performance agricultural machinery in the amount of 19.22 million rubles came to Buryatia, until the end of the year the region’s farmers receive equipment worth more than 305 million rubles.

Received equipment purchased through leasing contracts and spot deals. This is a 21 MTZ-82.1, designed for a wide range of agricultural activities, as well as four of the baler PR-145c, two rakes GVK-6, six loaders PKU-0, 8.

In the city of Mines (Rostov region). Opened the Ice Palace

The construction of the Ice Palace "Shahtinets" was a joint project for the regional government and the city administration Mines. The total cost of construction "Shakhty" was more than 159 million rubles, of which construction works — more than 147 million rubles.

SHAKHTINSKAYA athletes, young people, lovers of healthy life were complex with an ice field area of over 180 square meters. For the system of training process, this includes a gym and dance halls. For lessons on the ice field in the palace has 260 pairs of skates.

Until recently, winter sports were not popular among the

Continue reading In the city of Mines (Rostov region). Opened the Ice Palace

Teplovsky and Bidzhansky RYBZAVOD (Jewish AO) began mass production of salmon larvae in water bodies

Young salmon reach the required weight of 450 milligrams, so it is released into the warm water of the lake. In the ice reservoir wells, millions of individuals of salmon left on Rearing. With Teplovsko hatchery larvae mature 60 days. After a few days they become full-fledged juveniles, will acquire a dark color and rasplyvutsya under the ice throughout the lake. Released juveniles, while not quite get stronger, powered by the reserves of its yolk sac.

In total this year Teplovsky company plans to release 17 million fish pond salmon. Bidzhansky and a half times more — 26

Continue reading Teplovsky and Bidzhansky RYBZAVOD (Jewish AO) began mass production of salmon larvae in water bodies

In the Gorno-Altaisk opened its first factory in Siberia for processing MSW

The only plant in Siberia for disposal and recycling of municipal solid waste capacity 32.5 million tons per year, which will produce a litter of paving tiles, sewers and other products, opened Wednesday in the Altai Mountains.

The country has not been a single waste treatment plant and waste were either in special landfills or in illegal dumps. New waste treatment plant will partially resolve this situation. Power plant — about 32.5 million tons of garbage a year. It is assumed that with the introduction of the plant problem of illegal dumping will be largely solved.

The cost of the

Continue reading In the Gorno-Altaisk opened its first factory in Siberia for processing MSW

In Ulyanovsk region opened a rural house culture

Repaired open house in the village culture Tetyushskoe Ulyanovsk region Ulyanovsk region. Funds in the amount of 26 million rubles have been allocated for the reconstruction of the regional budget in programs "The main directions of state support of traditional folk culture" and "Culture of the Ulyanovsk region on the 2012 — 2016 years.".

For 2012 it is planned to upgrade light-sound and stage equipment in 23 municipal cultural institutions, for a total of 20 million, the purchase of musical instruments and specialized furniture for 25 municipal children’s art schools by 8 million, the acquisition of specialized

Continue reading In Ulyanovsk region opened a rural house culture

In the peaceful village of Khabarovsk region commissioned treatment plant

Power plants for processing of domestic waste water is 500 cubic meters. meters per day. Sewage built using innovative technologies — UV disinfection is provided, and used a number of developments Khabarovsk professionals. The author of the project was the candidate of technical sciences, professor DVGUPS Sergey Fomin.

As the head of the Khabarovsk region Vladimir Aleshko opening treatment is of great importance not only for the village, but also for the region as a whole. Previous installations of this kind were built in the district in 2004 in the village of SOSNOVKA.

Construction of sewage treatment in a.

Continue reading In the peaceful village of Khabarovsk region commissioned treatment plant

LuganskTeplovoz finished the year with a net profit of 71.8 million hryvnia

PJSC "LuganskTeplovoz" monopoly producer in Ukraine mainline freight locomotives, finished 2011 with a net profit of 71.82 million USD, while in 2010 its net loss amounted to 7,460,000 USD, soobschaetInterfaks-Ukraine.

As published in the press announcement of the General Meeting of Shareholders on April 19 PAO, accumulated losses "LuhanskTeplovoz" to January 1, 2012 exceeded 141,380,000 USD, falling by a third.

The company’s assets at the end of 2011 amounted to 674 168 000 hryvnia, the total receivables — 316 587 000 hryvnia.

Recall that in 2010, "LuganskTeplovoz" a loss 7,457,000 hryvnia, net revenues increased by 64.17% to 859.395 million

Continue reading LuganskTeplovoz finished the year with a net profit of 71.8 million hryvnia

Ivanovo region: new housing Children’s Hospital is equipped with medical equipment

More than 100 million rubles. intended for the purchase of medical equipment for the new building of the regional children’s hospital from the regional budget, another 64 million rubles will proluchit from the federal budget.

Medical building regional children‘s hospital in Ivanovo will be commissioned at the end of 2012. It is planned to place the receiving-ray department, operating theater, intensive care unit and intensive care for 12 beds with children’s intensive care referral center, surgical, orthopedic and traumatology department. For the year treatment in the new building will be able to go more than 3 million children, more

Continue reading Ivanovo region: new housing Children’s Hospital is equipped with medical equipment

SQL - 16 | 1,200 сек. | 7.27 МБ