Likinskiy bus plant started assembling the new model

"Likinskiy Bus Plant" started proizvodstvonovyh low-floor buses LiAZ 5292.30. "Likinskiy Bus Plant" (part of "GAS") invested in the modernization of the enterprise 120 million rubles.

"The design of the body has increased the seating capacity of up to 112 people, which is the best in the class of large buses," — said the group "GAS".

  The bus is equipped with

engine Scania DC 09 91A output 275 horsepower ecological standard Euro-4 6-speed automatic transmission ZF, which reduces fuel consumption by 5-10% new aggregate base LiAZ 5292.30, which provides bus running over a

Continue reading Likinskiy bus plant started assembling the new model

NKMZ roadheader shipped to the customer

As part of the investment program, "Krasnodonugol" Metinvest Group has acquired a new roadheader P-110 reloader to mine them. N.P.Barakova. The press-service of the company.

Roadheader will be operated in a promising direction — conducting excavations for opening the reservoir supplies i3. The cost of the acquisition was 6.5 million hryvnia.

 

Drifters will take the production cross section of 15.9 square meters in rocks of medium strength. Harvester equipped with an automatic control system of a new technological level. Portable control panel allows the operator to control the machine underground installations from a

Continue reading NKMZ roadheader shipped to the customer

In the Tomsk region opened the second phase of the greenhouse complex Trubacheva

In the new greenhouse complex plan to grow to 2.7 million tons of vegetables. The total cost of the two bursts of the complex was about 1.2 billion rubles.

Under the Tomsk launched the second phase of a modern greenhouse complex, which will close more than half of the region’s vegetables.

In November 2011, JSC "Tomskzelenstroy" in the village Trubacheva supported by regional and federal budgets launched the first phase of the complex value of about 420 million rubles. Area — about three acres. In the complex for growing vegetables (cucumbers and tomatoes) and herbs.

Continue reading In the Tomsk region opened the second phase of the greenhouse complex Trubacheva

The Dnipropetrovsk production figures were up 7%

The Dnipropetrovsk in 8 months of 2013 produced 7.8 million tons of steel, which is 107% over the same period of 2012. Also demonstrates the high region for the production of sinter (111.3%), iron ore (105.3%), products (102.2%) and concentrate (102%). It is reported production — business association of metallurgical enterprises of Ukraine "Metallurgprom." 

In particular, in the Dnipropetrovsk region after 8 months of 2013 produced 1.5 million tons of sinter, which is 11.3% more than the same period in 2012, iron ore — 6.5 million tons, which is 5.3% more last year’s figures, rolled —

Continue reading The Dnipropetrovsk production figures were up 7%

Innovators NTMK increase competitiveness

March 3, 2011

At JSC "Nizhny Tagil Iron and Steel Works" (included in "Evraz") started to produce new products — spetspolimerov (semi-finished, going to the production of truck tires and wheel tractors). At the same time in the shop kolesobandazhnom enterprise mastered innovations that reduce the cost of production of railway wheels while maintaining high product quality. All this — the result of the introduction of the shop floor plant offers innovators within the existing facilities at the "Eurasia" Program "operating system improvements" (SDAs). Thanks to the suggestions of metallurgists waste coke production, previously disposed of in coke ovens,

Continue reading Innovators NTMK increase competitiveness

In the Voronezh region completing the construction of the plant macaroni

products

The company "Productions groups-m" will finish in November 2013 the construction of the factory pasta with an investment of 290 million rubles and a capacity of more than 1 million tons of products per month.

The construction of the plant pasta in Pavlovsk district of Voronezh region in 2012. Currently the company employs only one line.

The second line will end mounted in November. At full capacity will be more than 1 million tons of short and long pasta in a month.

Continue reading In the Voronezh region completing the construction of the plant macaroni

Harvest of 2013: the Stavropol harvested 6.2 million tons of grain.

In the Stavropol region harvested 6.2 million tons of grain yield more than 30 tons per hectare.

Edge reaffirmed his title barns Russia!

They say his hands are black plowman, but white bread Stavropol born: 82 percent received this year in the province of grain — high, the quality of the food.

The best cleaning results showed Novoaleksandrovsky district, rural workers who harvested more than 415 million tons of grain. More than 360,000 tons produced in Budennovsk area, more than 350 thousand tons in Ipatovsk and Soviet areas. First of yield — Kochubeevsky

Continue reading Harvest of 2013: the Stavropol harvested 6.2 million tons of grain.

In a remote area of the Stavropol Territory Red Plowman school was opened in 1269 on the seats

On the Day of Knowledge in the hamlet Red Plowman Mineralovodsky District inaugurated the new secondary school number 14.

The new school is designed for 1,269 students. This year it will be taught about 300 children, of which 50 — first-graders.

Construction of the farmhouse of the school was started in 2002 and dragged on for years — to become protracted. Only in 2013, his "back to life". The volume of utilized investments amounted to 160 million rubles, of which 51 million rubles — the federal budget and 109 million rubles — from marginal

Continue reading In a remote area of the Stavropol Territory Red Plowman school was opened in 1269 on the seats

In Ulan-Ude, the opening of the first facilities development program

network of urban roads

Street Collective, which until recently was the most broken in Shishkovki, now one of the most well-kept. This is one of the most important objects of the program of development of the network of urban roads — said at the opening ceremony. The repair cost more than 15 million rubles.

And opened the road to block 111. It has become a boon for the local residents. After all, before many had to get to the bus stop by an abandoned building. Construction of the road lasted almost a year and cost the city

Continue reading In Ulan-Ude, the opening of the first facilities development program

Kharkov airmen have a new simulator of military aircraft L-39C Albatros (TCS-L39)

In Kharkiv in the 203rd Training aviation brigade enacted stationary integrated simulator pilot of the A-39C "Albatross" (TCR-L39). The new facility will improve the technical sessions on specific training of pilots, instructors and students, will raise the level of safety and to promote conservation of material resources of a military unit.

Simulator TKS-L39 is designed and built entirely in the Lviv region by OOO "Market-Mats". Under the terms of the contract with the manufacturer of the defense department was responsible for the delivery of the simulator in Chuguyiv, its assembly and training of military personnel in the

Continue reading Kharkov airmen have a new simulator of military aircraft L-39C Albatros (TCS-L39)

SQL - 17 | 0,623 сек. | 7.74 МБ