In Ulan-Ude, the opening of the first facilities development program

network of urban roads

Street Collective, which until recently was the most broken in Shishkovki, now one of the most well-kept. This is one of the most important objects of the program of development of the network of urban roads — said at the opening ceremony. The repair cost more than 15 million rubles.

And opened the road to block 111. It has become a boon for the local residents. After all, before many had to get to the bus stop by an abandoned building. Construction of the road lasted almost a year and cost the city

Continue reading In Ulan-Ude, the opening of the first facilities development program

Kharkov airmen have a new simulator of military aircraft L-39C Albatros (TCS-L39)

In Kharkiv in the 203rd Training aviation brigade enacted stationary integrated simulator pilot of the A-39C "Albatross" (TCR-L39). The new facility will improve the technical sessions on specific training of pilots, instructors and students, will raise the level of safety and to promote conservation of material resources of a military unit.

Simulator TKS-L39 is designed and built entirely in the Lviv region by OOO "Market-Mats". Under the terms of the contract with the manufacturer of the defense department was responsible for the delivery of the simulator in Chuguyiv, its assembly and training of military personnel in the

Continue reading Kharkov airmen have a new simulator of military aircraft L-39C Albatros (TCS-L39)

In Almetyevsk (Tatarstan) school was opened in 1224 on the site

School № 25 named after the 70th anniversary of the Tatarstan oil erected in the neighborhood "Yashlek." The construction was financed by additional contributions of "Tatneft" in the State Housing Fund. The cost of construction — 727.5 million rubles. 40 million of which was aimed at equipping schools increased demands for learning.

The exhibition area of 16,000 square meters located 51 classroom, swimming pool with two bowls, dance and two sports halls, conference hall for 540 seats, a medical unit, a dining room for 430 seats and other objects of educational infrastructure.

Photo

Continue reading In Almetyevsk (Tatarstan) school was opened in 1224 on the site

In p. Bulusa Irkutsk region opened a school for 100 people

The village Bulusa Ekhirit-Bulagat area Ust-Orda Buryat district school was opened on September 1.

The new building was built in record time — within 118 days. The old wooden school, built in 1928, burned down on April 30 of this year.

The school is equipped with a gymnasium with locker rooms and showers, three medical offices equipped workshops.

Total for construction of the facility spent about 150 million rubles, of which more than 140 million rubles — the regional budget, and another 7-8 million allocated municipality.

Photo

Continue reading In p. Bulusa Irkutsk region opened a school for 100 people

The new operational body built for a children’s hospital in Irkutsk

In Irkutsk, the grand opening of the new operational body Ivano-Matreninskoy Children’s Hospital, the construction of which cost more than 916 million rubles.

In the four-storey building will house 10 operating rooms, three intensive care units, diagnostic units, central sterilization station, a CT scanner.

It is planned that each year in the new building will be about 14 thousand operations, including newborns. 

Construction of the operating unit started in 2007, on its construction and equipment cost over 916 million rubles, including almost 226 million — for the purchase of modern medical equipment.

Continue reading The new operational body built for a children’s hospital in Irkutsk

In Krasnoyarsk, opened a kindergarten for 140 children and a school for 1000

Kindergarten number 71 was built as part of a long-term target program "Development of pre-school educational institutions." This institution will be engaged 140 kids from 1.5 to 7 years.

In kindergarten, a swimming pool, a large medical units and food, music and gymnastic halls.

On the construction of a new pre-school has been spent 112, 5 million rubles, 102 million rubles of which have been allocated from the budget of the Krasnoyarsk Territory.

Photo

School number 152 today opened its doors to 1,000 students. It was built to the standard

Continue reading In Krasnoyarsk, opened a kindergarten for 140 children and a school for 1000

Svjatogor purchased a new bucket crane production MOEZ

Leading enterprise of metallurgical holding UMMC, JSC "Svjatogor", launched on the areas new clamshell crane bridge type. The crane will be used for feeding and discharging of the charge. Acquisition of equipment was made possible by the implementation of a comprehensive program of modernization of production capacity of the enterprise.

Grapple for crane, , characterized by the capacity of 3 cubic meters and a load capacity of 16 tons. The crane can lift grapple with the load to a height of 14 meters.

Sam crane equipped with sensors that prevent a collision with a

Continue reading Svjatogor purchased a new bucket crane production MOEZ

In Moscow, a new item of postal exchange

"Mail of Russia" in conjunction with the Federal Customs Service of Russia opened in Moscow today in Kazan station a new item of postal exchange area of 5.4 thousand square meters It will specialize in the processing of international parcels.

"We expect growth in the number of incoming shipments from abroad twice," — told reporters at the opening paragraph of "Mail of Russia" Dmitry scary. According to him, in the summer load on postal operator equals the peak period of the end of last year. According to the "Mail of Russia", now the average time that elapses

Continue reading In Moscow, a new item of postal exchange

The modernization of Admiral Nakhimov

OAO "PO" Sevmash "placed on the official Online procurement of certain types of legal entities interesting data on repair and modernization of the heavy nuclear-powered missile cruiser Project 11442 serial number 802 ("Admiral Nakhimov" — former "Kalinin"). According posted June 27, 2013 information (links to pages with data procurement here and here), A government contract to perform these works was signed between the Ministry of Defense of Russia and the "Sevmash" on April 17 of this year, with the number R/1/1/0122/GK-13-DGOZ. In support of its execution a prime contractor was signed two contracts with JSC "Northern Design Bureau"

Continue reading The modernization of Admiral Nakhimov

Open Kamchatka Regional Vascular Center

A breakthrough in health care Kamchatka called the opening of a regional vascular center Governor Vladimir Ilyukhin after visiting the hospital.

 As reported in the government of Kamchatka, the head of the region familiarized himself with the unique medical equipment, talked to doctors and patients who have had surgery or was examined.

As the center’s specialists assured, if earlier for passing examinations or surgery beyond the limits of Kamchatka — a vascular centers located in Khabarovsk and Novosibirsk — went to 800 inhabitants of the peninsula, now this figure should be significantly reduced: most

Continue reading Open Kamchatka Regional Vascular Center

SQL - 16 | 4,043 сек. | 7.28 МБ