Calendar

Май 2018
MTWTFSS
« Dec  
 123456
78910111213
14151617181920
21222324252627
28293031 

In the Guards (Kaliningrad region) open water treatment plant

Built facility — an important link in the system to ensure residents Gardeyska quality drinking water. Its equipment allows the cleaning and disinfection of water with the latest technologies.

 Photo source:gov39.ru

Power station is designed for the future development of the district center and the estimated volume of cleaning and a half times the current consumption. Of 225.5 million rubles spent on its construction, more than 172 million — money the federal budget, and about 33 million — the regional.

 Photo source:gov39.ru

After the symbolic ribbon cutting head of the region and the head of Nicholas

Continue reading In the Guards (Kaliningrad region) open water treatment plant

90 playgrounds appeared in Pskov in 2011

Play structures appeared through three sources: 10 — at the expense of the city budget, as many more — in a public-private partnership, and 70 smaller sites for the People program.

 Photo source:informpskov.ru

The work will continue, and the next, in 2012, will be stressed.

 Photo source:informpskov.ru

 Photo source:informpskov.ru

 Photo source:informpskov.ru

 Photo source:informpskov.ru

 Photo source:informpskov.ru

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’; s.async = true; s.src = (‘https:’ == w.location.protocol ? ‘https’

Continue reading 90 playgrounds appeared in Pskov in 2011

In Vladivostok, opened the first section of the new highway Sedanka-Patroclus’

In Vladivostok, November 25, 2011 was officially opened by the movement of the first portion of the road "Novy — Peninsula de Vries — Sedanka — Bay Patroclus (with a low bridge)" — From the "Sedanka" to the Bay of Patroclus.

 Photo source:primamedia.ru

New high-speed line to unload the transport network Vladivostok, will cut the travel time from Pershamaiski district in the suburbs and back. It will be easier to get in the airport: highway shortens the route is about three times.

 Photo source:primamedia.ru

The track "Novy — Peninsula de Vries — Sedanka — Bay Patroclus‘

Continue reading In Vladivostok, opened the first section of the new highway Sedanka-Patroclus’

In Yekaterinburg opened the world’s northernmost skyscraper

In Yekaterinburg opened the tallest building in the Ural-Siberian and Central Asian regions — the business center "Vysotsky".

 Photo source:amisharin.ru

Construction of the building began in 2005. During this period, the owners have invested more than 6 billion rubles in the construction work. The building consists of 54 floors with a total height of 198 meters. Floor area of more than 117,000 square meters. Structural design of the building does not provide load-bearing walls. From inside the room is limited to only the outer walls and pillars. The building provides a large 8-storey covered parking for 670 cars

Continue reading In Yekaterinburg opened the world’s northernmost skyscraper

How to build a toll highway Moscow-Peter

After three years in Russia will open the first part of the new federal toll road on the route Moscow — St. Petersburg. The entire track length of 669 kilometers will run parallel to the Leningrad highway. The main plot builds a Franco-Russian company. Avto.Vesti.Ru studied the technology of laying road pie.

During the construction of the most important section of the new route took specially created for this purpose in 2007, "North-West Concession Company." But such a complicated name actually combines the construction of the French group Vinci and a group of Russian investors, each party holds a

Continue reading How to build a toll highway Moscow-Peter

In September, the URALVAGONZAVOD launched a new line of wheelsets

September 9 You know who visited the shop wheel sets URALVAGONZAVOD, where part of a major reconstruction of the production, which is held in the company ended the upgrade.

 Photo source:amisharin.ru

In the workshop of the Prime Minister launched a new automated line for the production of 45,000 wheelset axles per year, as well as his signature on the diagram of the first wheel set — a sort of passport of the product. The total investment amounted to about 38.5 million euros. Of these, more than 35 million — the cost of new equipment. Interview chief engineer railway

Continue reading In September, the URALVAGONZAVOD launched a new line of wheelsets

Modern domestic heavy machinery: photo-excursion on the Izhora plants

 Photo source:slon.ru

The theater begins with a hanger, plant — with a pass … Fortunately, we can avoid uninteresting places. "Izhora Plants" have their own steel-making unit DSP-120 (electric arc furnace with a capacity of 120 tons) at a cost of 5 billion rubles. — Almost half of long-term investment "Izhora Plants" at 11 billion rubles. The furnace was launched in June 2009. And now here begins the production of any mainstream products, which manufactures factory:

* Equipment for the oil and gas industry; * Equipment ("Izhora Plants" — a monopolist producing cases for nuclear reactors); *

Continue reading Modern domestic heavy machinery: photo-excursion on the Izhora plants

Photo essay: Uralkali

 Photo source:slon.ru

The journey begins. At a depth of over 400 meters from the mine shaft directly to the workings of miners delivers "Mole". It is a 24-seater vehicle designed and manufactured by the Nizhny Novgorod "Technoservice" based on a shortened chassis PAZ-3205. Engine — four-aspirated diesel Toyota-5L. The remaining parts of the domestic cars. In mines operating speed limit of 20 km / h and only by special permission — 40 km / h

 Photo source:slon.ru

Sami potash mines — insanely beautiful. And it’s a great business. The whole world has less than a dozen significant potash

Continue reading Photo essay: Uralkali

On the Diamond was launched on the Diamond and laid the ice-class patrol vessel project 22120

Solemn ceremony of launching the border patrol ship "Brilliant" Project 22460 was held on November 25 Of Marine Yard "Diamond" (St. Petersburg). The ship rolled out of the hangar at the floating dock PD-455 companies.

 Photo source:spb.ru

The lead ship of the series — PSKR "Ruby" (serial number 501) — laid the boathouse OAO "MZ" Diamond "September 3, 2007, launched on 26 June 2009. The first production PSKR (serial number 502), which was given the traditional name for the border guard ship "Brilliant", founded May 12, 2010. In building on the "Diamond" is the second serial ship "Pearl"

Continue reading On the Diamond was launched on the Diamond and laid the ice-class patrol vessel project 22120

In the Pine Forest (Leningrad region). Opened a new children’s clinic MSC-38

In the history of MSC-38 (Central medical unit of the Federal Medical and Biological Agency of Russia) has another important date — November 16 — the commissioning of the new building children‘s clinic.

 Photo source:cmsch38.ru

The clinic set the unit to automatically issuing coupons to the doctor, there is a monitor with an electronic schedule, comprehensive information supporting and working online with the registrar, internet schedule on the official website CMSU and installing self-service. On the floors of hospitals, where the signal is received, a children’s play installation, as well as monitors, capable of broadcasting cartoons and entertainment

Continue reading In the Pine Forest (Leningrad region). Opened a new children’s clinic MSC-38

SQL - 6 | 7,735 сек. | 8.52 МБ