In the capital of Tatarstan, this year will open the fourth isolation

The labor movement in isolation ul.Chistopolskaya — pr.Amirhana scheduled to open by the end of October this year. This was announced today during the retreat, which was held at the headquarters on a construction site and reported to the Mayor of Kazan Ilsur Metshin.

 Photo source:metshin.ru

As recalled by the chief engineer of the Capital Construction and reconstruction of the Executive Committee of Kazan Yuri Petrenko, following eight months of work at the facilities of the road network of the city was recorded behind schedule. President of Tatarstan Rustam Minnikhanov set the task — in September, the backlog

Continue reading In the capital of Tatarstan, this year will open the fourth isolation

In the capital of Adygea has opened a new kindergarten for 240 places

December 26 in the capital of Adygea Maikop the grand opening of a new kindergarten for 240 places.

 Photo source:adygheya.ru

For groups provided bedrooms, game rooms, music and sports halls, catering department, laundry, medical office, all set new children's furniture. Total building area 2976 sq.m. etc. Do not forget about the builders and landscaping of the adjacent territory.

 Photo source:adygheya.ru

The construction of the kindergarten was spent 190 million rubles from the city budget, the next kindergarten is already under construction and will be completed next year.

 Photo source:adygheya.ru

After the red ribbon was

Continue reading In the capital of Adygea has opened a new kindergarten for 240 places

In Stary Oskol area restored church of the Nativity of the Blessed Virgin Mary

The church was erected in the village Shatalovka twice and twice collapsing to the ground. Today is the first service in the new church was restored to the fund "Generation", held by Archbishop John of Belgorod and Stary Oskol.

The first wooden church was built in Shatalovke 80 years after the founding of the village — in 1768, but burned down in the 1820 m. The second time the temple was erected in stone for 12 years, until 1838, at the donations. Temple turned unique to the region — three-altar. The walls of the church were painted with images

Continue reading In Stary Oskol area restored church of the Nativity of the Blessed Virgin Mary

In the Stavropol region launched the first boiler that runs on biofuel

December 23 the launch of the first in the Stavropol boiler running on biofuel — straw pellets.

 Photo source:bezformata.ru

The new company emerged on the basis of the boiler house in the village SNIISKH (Shpakovsky district). Redesign to cost the budget more than 24 million rubles. However, as assured CEO SUE SC "Krayteploenergo" Alexander Smaguine, the costs will pay off quickly.

 Photo source:bezformata.ru

benefits of the new facility: — The pellet boilers high efficiency — 80-90%; — The necessary fuel has a low enough cost — pressed pellets from straw, which in the fields of Stavropol

Continue reading In the Stavropol region launched the first boiler that runs on biofuel

In Stavropol opened diving training facility

On the basis of the Stavropol search and rescue team opened the diving training complex "Baikal" Pre-diving in the field of the implementation of underwater engineering and rescue diving.

 Photo source:gov.ru

Analogues of this complex in Russia yet. Stavropol search-and-rescue team was first fitted to the simulator.

 Photo source:gov.ru

This is no accident: the search and rescue team is a multiple winner of the regional and All-Russian competitions in Russia Emergency Rescue decathlon. This year's open national competitions in Kamchatka our rescuers took the lead in the overall standings. Team squad also became the best and

Continue reading In Stavropol opened diving training facility

In Sochi spent sboyka first tunnel road Stand Holiday Avenue

 Photo source:sc-os.ru

Builders completed sboyka tunnel number 1 on the first line doubler Resort avenue of the city of Sochi. Told a news agency Sochi-24 reported in the press service of "Transstoy."

Excavation was carried out in two faces. On the north portal was passed 642 meters, 830 meters from the south.

The main efforts of the builders now will focus on the development of the lower part of the tunnel and the device permanent lining. It is planned that the first phase of "stand-ins" will be completed by the end of 2011.

 Photo source:sc-os.ru

The

Continue reading In Sochi spent sboyka first tunnel road Stand Holiday Avenue

Sochi has opened a new school

November 21, 2011 in the construction in accordance with the program of construction of Olympic facilities district merry-Psou a solemn ceremony of opening a new school for 1000.

 Photo source:privetsochi.ru

Area schools and open spaces around it — it's not all its features. While it is indeed impressive: the territory — almost four acres, in the school — more than 21 thousand square meters. Huge gym inside the stadium outdoors — with a football field, running track. Spacious halls, dressing rooms, offices for staff, space for leisure activities of students and teachers, too dazzling. And all this is

Continue reading Sochi has opened a new school

In Sochi, the construction of Russia’s largest hotel complex

September 20th at the Olympic Park was laid the foundation stone of a hotel complex on 3600 numbers.

 Photo source:sc-os.ru

In 2014, the hotel complex will be living representatives of the CIS, journalists and Partners Winter Games in 2014. In the post-Olympic period, the complex will be a place for relaxation and comfort Russian and foreign tourists.

 Photo source:sc-os.ru

"This is one of the most important objects of Olympic construction program — from the point of view of the formation in the Imereti lowland areas of international hospitality, attracting the attention of the guests who will

Continue reading In Sochi, the construction of Russia’s largest hotel complex

In Sochi completed structure of the central part of the roof of the Bolshoi Ice Palace

 Photo source:sc-os.ru

For the nine months mounted uppermost part — "top" of the roof of the dome, which is located above the main field of large ice hockey arena. Started assembling the side surfaces of the dome. Now an area of almost 11,000 square meters laid several layers of high-tech roof "pie." They provide warmth, waterproofing, sound insulation and good acoustics.

 Photo source:sc-os.ru

Now we have to perform the installation of a roof on the area for about 11 thousand square meters. This is the side surface of the dome, beneath which are placed lobbies arena. Volume

Continue reading In Sochi completed structure of the central part of the roof of the Bolshoi Ice Palace

The composition of the Baltic fleet includes two new tug project 90600

Leningrad Shipyard JSC "Pella" has passed to the customer tugs "RB-27" (building number 930), and "RB-42" (building number 931) of the project 90600.

 Photo source:pellaship.ru

December 23, 2011 after the successful completion of tests the State Acceptance Commission signed an acceptance of the tugboat "RB-27" page number 90600 930 Ave. Tug introduced in the Russian Baltic Fleet.

 Photo source:pellaship.ru

December 30, 2011 after the successful completion of tests the State Acceptance Commission signed an acceptance of the tugboat "RB-42" page number 90600 931 Ave. Tug introduced in the Russian Baltic Fleet.

The main technical

Continue reading The composition of the Baltic fleet includes two new tug project 90600

SQL - 16 | 0,856 сек. | 7.28 МБ