In Jurga opened a new pontoon bridge

October 1 was put into operation a pontoon bridge across the river Tom.The new bridge consists of 30 floats, which are mounted on 18-anchors. Load capacity pontoon bridge is limited to 50 th tons, required by safety regulations. For the passage of large ships will be divorced two pontoon span (about 50 meters), for small vessels — to climb a ramp at an angle of almost 90 degrees. With the opening of the pontoon bridge at yurgintsev the opportunity to easily and at any time of the day to cross to the other side of the river, to

Continue reading In Jurga opened a new pontoon bridge

In RTSPKB Stapel draft non-propelled floating pontoon for manufacturing operations

2.png

AboutSequence of the project has developed and transferred to the customer of "RTSPKB" Stapel ": self-propelled floating pontoon for manufacturing operations. The pontoon is designed for dredging at depths up to 50 meters in ambient temperatures from 0? C to +40? C in the waters of the category of "P" on the classification of the PPP, inclusive, and is a carrier for the controls and energy complex underwater dredging.

 

The vessel is a collapsible design that allows for its delivery to the work site of the individual modules (central and lateral flow pontoons with

Continue reading In RTSPKB Stapel draft non-propelled floating pontoon for manufacturing operations

At the Lotus (Astrakhan region). Launched the new pontoon

Launching a modern self-propelled pontoon "ARC 10", capacity of 3,000 tonnes — a significant event not only for the plant "Lotus", but also, perhaps, for the entire area. Shipbuilding industry, as scheduled leadership of the region coming out of hibernation.

 

It was built on a pontoon leasing scheme. Lessor — JSC "Gosznak-Leasing", the lessee — LLC "Shipping company ARC." The construction contract was signed in October 2011, and laying took place in March of this year. Intended for the carriage of deck cargo, it may be subjected to ballasting and

Continue reading At the Lotus (Astrakhan region). Launched the new pontoon

Ladoga shipyard produced and handed over to the customer pontoon floating bridge

October 19 for the first time in the history of Ladoga Ltd. shipyard and the p / farm them. Kalinin is built to such a size 50 x 6.5 x 2.0 m pontoon floating bridge in Sortavala rep. Karelia

In contractual terms, pontoon towed across Lake Ladoga delivered to the installation site: Strait Vorssunsalmi lake Lyapiyayarvi Sortavala and delivered to the customer. Now the residents will have a reliable ferry from the mainland to the island

Since the news site with this shipyard was, dare I briefly tell about them made for that

Continue reading Ladoga shipyard produced and handed over to the customer pontoon floating bridge

To the city of Kirov-Chepetsk (Kirov Region) inaugurated a pontoon bridge across the river Cheptsov

Today in the city of Kirov-Chepetsk was inaugurated on a pontoon bridge across the cap, linking the main part of the city with neighborhoods Karintorf.

District Karintorf is 6 kilometers from the city of Kirov-Chepetsk a bonnet across the river. Until recently, the only permanent links with these neighborhoods was supported only by a narrow-gauge railway. Vehicle traffic carried by winter ice crossing in the summer — on the ferry. Within four months of the year there was no road connections.As noted at the opening of NY White, the event is really welcome. According to Nikita Jurevicha, with the opening

Continue reading To the city of Kirov-Chepetsk (Kirov Region) inaugurated a pontoon bridge across the river Cheptsov

Engineers Coastal Forces CF have guided ferry across the water barrier width of more than 400 m

With the company of a single pontoon bridge battalion of Marine Engineers, the Baltic Fleet (BF IIA) held special tactical exercises (TSU) for equipment to overcome the ferry troops and equipment to the water hazard.

As conceived by the teachings of his hypothetical opponents, violating the state border, moved into the territory of the Kaliningrad region. Coastal Forces CF task repel the attack and push the enemy back over the border. Naval engineers was to ensure the smooth progress reinforced infantry battalion with BF fording.

As part of a pontoon company of TSU was given the task — to march,

Continue reading Engineers Coastal Forces CF have guided ferry across the water barrier width of more than 400 m

In the Eastern Military District began teaching Railway Troops

Conscripts pontoon bridge battalion master skills guided pontoon bridge across one of the main channel of the Amur River.

The plan military exercises separate railway battalion TSB stationed in Khabarovsk Krai, were alerted, moved to the area of combat use. First of all military divers examined the bottom contour of the reservoir.

Only in the group on pontoon ferries — 7 divers. Prepares them for the Army is the only center in the Volgograd region, on the river Akhtuba. Perform such work can only hardy men. Weight of only 80 kilograms of equipment.

After the examination, the bottom

Continue reading In the Eastern Military District began teaching Railway Troops

At the Lotus (Astrakhan region). Launched the new pontoon

Launching a modern self-propelled pontoon "ARC 10", capacity of 3,000 tonnes — a significant event not only for the plant "Lotus", but also, perhaps, for the entire area. Shipbuilding industry, as scheduled leadership of the region coming out of hibernation.

 

It was built on a pontoon leasing scheme. Lessor — JSC "Gosznak-Leasing", the lessee — LLC "Shipping company ARC." The construction contract was signed in October 2011, and laying took place in March of this year. Intended for the carriage of deck cargo, it may be subjected to ballasting and

Continue reading At the Lotus (Astrakhan region). Launched the new pontoon

Ladoga shipyard produced and handed over to the customer pontoon floating bridge

October 19 for the first time in the history of Ladoga Ltd. shipyard and the p / farm them. Kalinin is built to such a size 50 x 6.5 x 2.0 m pontoon floating bridge in Sortavala rep. Karelia

 

In contractual terms, pontoon towed across Lake Ladoga delivered to the installation site: Strait Vorssunsalmi lake Lyapiyayarvi Sortavala and delivered to the customer. Now the residents will have a reliable ferry from the mainland to the island

Since the news site with this shipyard was, dare I briefly tell about them

Continue reading Ladoga shipyard produced and handed over to the customer pontoon floating bridge

Tank Hydrofoil

Details of "Project 80" you do not learn from the military-technical guides and historical books. About tanks, overtaking speed boats on the water, not poison tales experienced warriors: despite the fact that the project was implemented in the metal, machinery and not credited to the Russian Army. People who have created a unique device and bring it to the brain, virtually remained alive On the Structure of high-speed marine tank landing craft "Project 80," we told the staff "Vympel" (in those days — CB "Volgobaltsudoproekt") and Navashino shipyard, now Distinguished Engineer, and then — young engineers and mechanics. Technical

Continue reading Tank Hydrofoil

SQL - 17 | 1,700 сек. | 7.72 МБ